Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) 2024-09-04
[Table view] Category:License-Operator
MONTHYEARIR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 ML22143A9352019-05-16016 May 2019 2019 DAEC Ile ES-201-1 ML22143A9382019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-201-3 ML22143A9392019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-301-7 ML22143A9412019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-4 ML22143A9422019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-9 ML22143A9432019-05-16016 May 2019 DAEC 2019 Outline Comments NG-19-0058, 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification2019-04-26026 April 2019 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification NG-19-0057, 2019 DAEC Initial License Examination Post Exam Submittal Letter2019-04-19019 April 2019 2019 DAEC Initial License Examination Post Exam Submittal Letter ML22143A9992019-04-0808 April 2019 2019 DAEC Ile Administered Admin JPMs ML22143B0002019-04-0808 April 2019 2019 DAEC Ile Administered Sim and Inplant JPMs ML22143B0012019-04-0808 April 2019 2019 DAEC Ile Scenarios ML22143B0022019-04-0808 April 2019 2019 Deac Ile Administered Written Exam ML22143B0032019-04-0808 April 2019 RO and SRO Exam Reference Handouts ML19087A3022019-03-28028 March 2019 Operator Licensing Examination Approval (Cdz) ML22144A0672019-02-22022 February 2019 2019 DAEC Ile Proposed RO and SRO Admin JPMs ML22144A0692019-02-22022 February 2019 2019 DAEC Ile Proposed Sim and Inplant JPMs ML22144A0712019-02-22022 February 2019 2019 DAEC Ile Proposed Scenarios ML22144A0732019-02-22022 February 2019 2019 DAEC Ile Proposed Written Exam ML22144A0742019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-3 ML22144A0752019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-4 ML22144A0762019-02-22022 February 2019 2019 Duane Arnold Initial License Exam Form ES-301-6 ML22144A0792019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-401-6 ML22145A4392019-01-23023 January 2019 2019 DAEC Initial License Examination Submittal Letter ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML22143B0042018-12-21021 December 2018 2019 DAEC Ile ES-201-2 ML22143B0052018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-1 ML22143B0062018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-2 ML22143B0072018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-5 ML22143B0082018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-401-1 and 401-3 ML22143B0092018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-D1 ML22143B0102018-11-12012 November 2018 2019 DAEC Ile Outline Submittal Letter NG-18-0089, Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)2018-07-25025 July 2018 Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02) ML18099A2622018-04-0909 April 2018 Gfes Results-March 2018, Duane Arnold Energy Center (Cover Letter Only) ML18086B0662018-03-27027 March 2018 Facility Cover Letter - Riii - March 2018 - GFE ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III IR 05000331/20173012017-07-14014 July 2017 NRC Initial License Examination Report 05000331/2017301 (Meb) ML17214A0272017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam ES-401-6 ML17214A0282017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Admin RO-SRO JPMs ML17214A0342017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Operating JPMs ML17214A0362017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Scenarios 1-2-3-Alt ML17214A0382017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam RO Written Examination ML17214A0502017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam SRO Written Examination ML17214A2142017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Scenarios ML17214A2322017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Operating Sim and IP JPMs ML17214A2592017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO-SRO Admin JPMs ML17214A2952017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO Written Examination ML17214A3072017-06-14014 June 2017 Dua 2017 Ile - Administered Exam SRO Written Examination ML17214A3502017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Written Examination Handouts ML17214A4012017-06-14014 June 2017 Dua 2017 Ile Administrative Files ES-401-4 2019-06-18
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 July 14, 2017 Mr. Dean Curtland Director of Site Operations NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785 SUBJECT: DUANE ARNOLD ENERGY CENTER - NRC INITIAL LICENSE EXAMINATION REPORT 05000 331/20 17 301
Dear Mr. Curtland:
On June 21, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Duane Arnold Energy Center. The enclosed report documents the results of those examination s. Preliminary observations noted during the examination process were discussed on June 14, 2017, with yourself and other members of your staff
. An exit meeting was conducted by telephone on July 5, 2017 , between Mr.
C. Hill of your staff and Mr.
R. Baker, Senior Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicants.
The NRC examiners administered an initial license examination operating test during the week s of June 5 and June 12, 2017. The written examination was administered by Duane Arnold Energy Center training department personnel on June 14, 2017. Nine Senior Reactor Operator and three Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on July 11, 2017
. Twelve applicants passed all sections of their respective examinations; nine applicants were issued a senior operator license and three applicants were issued an operator license
. The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until June 14, 2019
. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Enclosure s: 1. OL Examination Report 05000 331/20 17 301 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV C. Hill, Training Manager, Duane Arnold Energy Center Letter to Dean Curtland from Robert Orlikowski dated July 14, 2017 SUBJECT: DUANE ARNOLD ENERGY CENTER - NRC INITIAL LICENSE EXAMINATION REPORT 05000 331/20 17 301 DISTRIBUTION
- Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS
ADAMS Accession Number: ML17198A211 OFFICE RIII RIII RIII RIII NAME MBielby:jw ROrlikowski DATE 07/13/17 07/14/17 OFFICIAL RECORD COPY
Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Docket No:
50-331 License N o: DPR-49 Report No:
05000 331/20 17 301 Licensee: NextEra Energy Duane Arnold, LLC Facilit y: Duane Arnold Energy Center Location: Palo, IA Dates: June 5 - June 21, 2017 Inspectors:
M. Bielby, Senior Operations Engineer
- Chief Examiner R. Baker, Senior Operations Engineer
- Examiner C. Zoia, Senior Operations Engineer
- Examiner Approved by:
R. Orlikowski, Chief Operations Branch Division of Reactor Safety 2
SUMMARY
Examination
Report 05000 301/20 17 301; 06/05/2017
- 06/21/2017
- NextEra Energy Duane Arnold, LLC
- Duane Arnold Energy Center
- Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Examination Summary
- Twelve of Twelve applicants passed all sections of their respective examinations. Nine applicants were issued senior operator licenses and three applicants were issued operator licenses. (Section 4OA5.1).
3
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensee's staff used the guidance prescribed in NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensee's staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of May 8, 2017, with the assistance of members of the facility licensee's staff. During the on
-site validation week, the examiners audited two license application s for accuracy. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 5 through June 13, 2017. The facility licensee administered the written examination on June 14, 2017.
b. Findings
- (1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20% of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.
During the validation of the written examination, several questions were modified or replaced. All changes made to the written examination were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors,"
and documented on Form ES 9, "Written Examination Review Worksheet
." The Form ES-401-9, the written examination outlines (ES
-40 1-2 and ES-401-3), and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) on June 14, 2019
, (ADAMS Accession Numbers ML16308A452, ML16308A457, ML16308A458, and ML16308A454, respectively
. On June 21, 2017 , the licensee submitted documentation noting that there were no post-examination comment s for consideration by the NRC examiners when grading the written examination.
The NRC examiners graded the written examination on June 22, 2017, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
4
- (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Following the review and validation of the operating test, minor modifications were made to several Job Performance Measures (JPMs), and some minor modifications were made to the dynamic simulator scenarios. All changes made to the operating test were made in accordance with NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," and were documented in a document titled, "Operating Test Comments." The "Operating Test Comments" document, the operating test outlines (ES 1, ES-301-2, and ES-D-1s), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS on June 14, 2019 (ADAMS Accession Numbers ML16308A452, ML16308A457, ML16308A458, and ML16308A454, respectively
). The NRC examiners completed operating test grading on July 11, 2017
.
- (3) Examination Results Nine applicants at the Senior Reactor Operator level and three applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. Twelve applicants passed all portions of their examinations and were issued their respective operating licenses on Ju ly 11, 2017.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title 10 of the Code of Federal Regulations, Section 55.49, "Integrity of Examinations and Tests.
" The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors
," to determine acceptability of the licensee
's examination security activities.
b. Findings
The NRC examiners reviewed three issues involving examination security that were identified during the examination administration. The first issue was observed one time
, and was identified at the start of a scenario. Written information from the previous day's scenario was contained on the back of a pre-scenario crew briefing sheet. The information did not relate to the scenario being administered.
A second examination scenario administration security issue occurred one time, and was identified by an examiner who observed pen markings on a plastic covered switchyard lineup drawing located on the top of the Instructor Display Terminal. The markings were left over from the previously administered scenario and were related to an event to be administered. The markings were erased before being identified by the crew being examined.
5 A third examination security issue was identified during the administration of an administrative JPM. A reference procedure used by one applicant contained markings of exact information required by the applicant to address the JPM. The applicant initially identified the markings and informed the examiner. Another administrative JPM from the RO examination was identified as an adequate replacement and was administered to the applicant.
None of the three issues resulted in a compromise of the examination material or significant advantage to any of the applicants. These issues were of minor significance and were documented in Corrective Action CR02210092.
4OA6 Management Meetings
.1 Debrief The chief examiner presented the examination team's preliminary observations and findings on
June 14, 2017
, to Mr. D. Curtland , Director of Site Operation s , and other members of the Duane Arnold Energy Center staff.
.2 Exit Meeting
The chief examiner conducted an exit meeting on July 5, 2017, with Mr. C. Hill, Training Manager, and other members of the Duane Arnold Energy Center staff, by telephone. The examiners asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
T Licensee
- D. Curtland, Site Director
- A. Beaumier, Operations Instructor
- J. Dills, Operations Instructor
- D. Finch, Operations Instructor
- J. Ford, Operations Training Supervisor
- C. Hill, Training Manager
- J. Miell, Assistant Operations Manager
- E. Murray, Operations
Training Supervisor
- B. Ryan, Operations Instructor
- R. Spading, Assistant Operations Manager
- S. Speirs, Assistant Operations Manager
- M. Strope, Operations
Director
- S. Vick, Operations Instructor
- M. Walter, General Supervisor Operations Training
U.S. Nuclear Regulatory
Commission
- C. Norton, Senior Resident Inspector
J. Steffes
, Resident Inspector
- M. Bielby, Chief Examiner
- R. Baker, Examiner
- C. Zoia, Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, Discussed
None LIST OF ACRONYMS USE
D ADAMS Agency wide Document Access and Management System
JPM Job Performance Measures
NRC U.S. Nuclear Regulatory Commission
RO Reactor Operator
SIMULATION FACILITY
FIDELITY REPORT Facility Licensee:
Duane Arnold Energy Center
Facility Docket No:
50-331 Operating Tests Administered:
June 5 - 9; 12 - 13, 2017 The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of no
n-compliance with Title 10 of the Code of F ederal Regulations
55.45(b). These observations do not affect U.S. Nuclear Regulatory
Commission certification or approval of the simulation facility other than to provide information
, which may be used in future evaluations. No
licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION
None Identified.
None Identified.