L-13-118, Resubmittal of FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima.

From kanterella
Revision as of 22:11, 11 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Resubmittal of FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima.
ML13135A539
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 04/29/2013
From: Halnon G H
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML131350549 List:
References
L-13-118, TAC MF0092, TAC MF0093, TAC MF0116, TAC MF0159
Download: ML13135A539 (3)


Text

FENOC"ON"%76 South Main Street FirstEnergy Nuclear Operating Company Akron, Ohio 44308 April 29, 2013 L-13-118 10 CFR 50.54(f)ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Resubmittal of FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0092, MF0093, MF0116, and MF0159)On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter titled,"Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of the 10 CFR 50.54(f) letter contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic Walkdowns.

By letter dated November 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML130080030), FirstEnergy Nuclear Operating Company (FENOC) submitted the 180-day response to the 10 CFR 50.54(f)letter. The required seismic walkdown reports were provided in paper format as Enclosures A, B, C, and D for Beaver Valley Power Station, Unit No. 1 (BVPS-1);Beaver Valley Power Station, Unit No. 2 (BVPS-2);

Davis-Besse Nuclear Power Station (DBNPS); and Perry Nuclear Power Plant (PNPP), respectively.

Following incorporation into ADAMS, the document pages were observed to not be in the same order as the November 27, 2012 submittal.

To correct ADAMS, this letter resubmits the November 27, 2012 enclosures in their entirety.

The seismic walkdown reports are LOI Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-13-118 Page 2 provided in electronic format on the enclosed CD-ROM. As requested by NRC guidance for electronic submissions, the attachment provides a listing of document components that make up the enclosed CD-ROM.No new regulatory commitments are made in this letter. The regulatory commitments made in the November 27, 2012 submittal remain in effect. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-315-6810.

Sincerely, Gregoryy .Halnon Director, Fleet Regulatory Affairs

Attachment:

Document Components on CD-ROM Enclosures on CD-ROM: Beaver Valley Power Station Unit 1 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Beaver Valley Power Station Unit 2 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report cc: Director, Office of Nuclear Reactor Regulation (NRR) (w/o Enclosures)

NRC Region I Administrator (w/o Enclosures)

NRC Region III Administrator (w/o Enclosures)

NRC Resident Inspector (BVPS) (w/o Enclosures)

NRC Resident Inspector (DBNPS) (w/o Enclosures)

NRC Resident Inspector (PNPP) (w/o Enclosures)

NRR Project Manager (BVPS) (w/o Enclosures)

NRR Project Manager (DBNPS) (w/o Enclosures)

NRR Project Manager (PNPP) (w/o Enclosures)

Director BRP/DEP (w/o Enclosures)

Site BRP/DEP Representative (w/o Enclosures)

Utility Radiological Safety Board (w/o Enclosures)

Attachment L-13-118 Document Components on CD-ROM Page 1 of 1 File Name 001 BVPS Ul Seismic Walkdown Rpt.pdf 002 BVPS Ul Seismic Rpt App A.pdf 003 BVPS U1 Seismic Rpt App B (1 of 2).pdf 004 BVPS Ul Seismic Rpt App B (2 of 2).pdf 005 BVPS U1 Seismic Rpt App C to App E.pdf 006 BVPS U2 Seismic Walkdown Rpt.pdf 007 BVPS U2 Seismic Rpt App A.pdf 008 BVPS U2 Seismic Rpt App B (1 of 2).pdf 009 BVPS U2 Seismic Rpt App B (2 of 2).pdf 010 BVPS U2 Seismic Rpt App C to App D.pdf 011 DBNPS Seismic Walkdown Rpt.pdf 012 DBNPS Seismic Rpt App A.pdf 013 DBNPS Seismic Rpt App B (1 of 2).pdf 014 DBNPS Seismic Rpt App B (2 of 2).pdf 015 DBNPS Seismic Rpt App C to App G.pdf 016 PNPP Seismic Walkdown Rpt.pdf 017 PNPP Seismic Rpt App A.pdf 018 PNPP Seismic Rpt App B (1 of 2).pdf 019 PNPP Seismic Rpt App B (2 of 2).pdf 020 PNPP Seismic Rpt App C to App F.pdf Size 44,347 KB 4,724 KB 31,923 KB 35,770 KB 32,622 KB 23,449 KB 4,490 KB 47,037 KB 38,429 KB 32,361 KB 25,160 KB 5,244 KB 29,232 KB 25,876 KB 19,275 KB 18,226 KB 4,822 KB 31,355 KB 41,499 KB 22,196 KB