Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 1 of 439 Through Sheet 200 of 439
ML13135A233
Person / Time
Site: Beaver Valley
Issue date: 10/23/2012
From:
ABS Consulting
To:
Office of Nuclear Reactor Regulation, FirstEnergy Nuclear Operating Co
Shared Package
ML131350549 List:
References
L-13-118, TAC MF0092, TAC MF0093, TAC MF0116, TAC MF0159
Download: ML13135A233 (201)


Text

{{#Wiki_filter:APPENDIX B SEISMICWALKDOWN CHECKLISTS (SWCS) Sheet I of439 Paul C. Rizzo Associates, lnc.seismicw"r;;;(swc)Equipment ID No. ICC-E-lA Equip. Class 21. Tanks and Heat Exchangers Equipment Description Primary Plant Component Cooling Water Heat exchanger Location: Bldg. AXLBFloor El. 735 Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item one of the 50%o of SWEL items requiring such verification)? Long heat exchanger on two saddles hungfrom the ceiling. Fixed support qt ceiling is anchoredwith 28-1 I/2" diam anchor bolts. Sliding end is anchoredwith 24-l I/2" diam amchors.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yo forwhich an anchorage configuration verification is required.)Anchorage configuration confirmed per Drawings RV-0076A and RV-00768 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

@N/A N/A X X x X X X BC? Paul c. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. ICC-E-lA Equip. Class 21. Tanks and Heat Exchangers Equipment Description Primary Plant Component Cooling Water Heat exchanger Sheet 2 of 439@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A N/A X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) r0lU20l2 ,f /.,rrti.,..t ' l. 'r'tl!/'!t?'Adam L. Helffrich ruty20r2 XEvaluated by:Eddie M. Guerra Paul C. Rizzo Associates, Inc.ENGINEERS &. CONSUUT.II$TS Seismic Walkdown Checklist (SWC)Equipment ID No. ICC-E-IA Equipment Description @Sheet 3 of 439 U Status: Equip. Class 21. Tanks and Heat Exchangers Primary Plant Component Cooling Water Heat exchangerOther supporting or relevant documents and photos (ifany):File Name: 2-61-l-l -44Speg

Description:

Component Plate IDFile Name: 2-62-l-l-44 jpegDescription: General view of component Sheet 4 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. ICC-E-IA Status: Equip. Class 21. Tanks and Heat ExchangersEquipment Description Primary Plant Component Cooling Water Heat exchangerFile Name: 2-63-l -l -44 jpegDescription: View of anchorage for fixed support File Name: 2-64-l-l-44 jpegDescription: View of anchorage for sliding support Sheet 5 of 439Paul C. Rizzo Associates,Inc.ENf: INT.ERS &. CONSI JLTA"\T -S Seismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-l Equip. Class 17. Engine Generators Status:@Equipment DescriptionDiesel Generator Location: Bldg.DGBXFloor El. 735 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Anchoredwith 14-1 l/4" diam anchor bolts. 6 of l4 anchors are below the engine block and there is a gap of -l/2" betweenfloor and base of DG skid. Other anchors have grout pads. It is judged that the skid has adequate capacityfor the demand loads.Also it is judged that bolt bending is not a concern due to gap of -l I/2". (see alsocalculation 5 2 2 3 3-C-0 I 8)2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)Calculation 52233-C-018, page 4/17 confirms the anchorage configurotion.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?The support beams for the EDG skids were identified not to be groutedfor their entirelength. SQUG and design basis documentation provides justificationfor thisfinding.

N/A N/A X X X X X X Sheet 6 of 439Paul C. Rizzo Associates,Inc.E^*(;INEERS & CONSULTA}iTS Seismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-l17. Engine Generators Equipment DescriptionEquip. ClassDiesel Generator Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)Evaluated by: /,. '/,rlr: :.'l' rl' r'!t 2"r!' Adam L. Helffrich X t0nl20t2 r0lU20r2 Paul C. Rizzo Associates, Inc.ENGIN E E RS & Ct)NSIJUTA"YIS Seismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-I 17 . Engine Generators Status:@Sheet 7 of 439 U N Equipment DescriptionEquip. Class Diesel GeneratorOther supporting or relevant documents and photos (if any):File Name

2-61 l -z0jpeg

Description:

Component Plate IDFile Name: 2-62-8-l -zDjpeg

Description:

General view of component Sheet 8 of 439 Paul C. Rizzo Associates, Inc. liN(;I NEERS .E CONST;LTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-l l7 . Engine Generators Status:@N Equipment Description DieselEquip. Class GeneratorFile Name: 2-63 I -20 jpegDescription: View of marks surrounding DG exhaust pipe.File Name : 2-64-8-l -20 jpegDescription: Partial view of anchorage configuration Sheet 9 of 439 Paul C. Rizzo Associates, Inc.ENGINEER5 & C\)NSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-I 17 . Engine GeneratorsFile Name: 2-73-8-l -20 jpeg

Description:

View of base detail showing no grout below DG's middle section.File Name: 2-94-8-l -20 jpegDescription: View of base anchors and grouted section for DG base.Status:@N Equipment Description Equip. Class Diesel Generator PCe Paul c. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-2 Equip. Class

17. Engine GeneratorsEquipment DescriptionDiesel GeneratorLocation: Bldg.

DGBXFloor El.735Manufacturer. Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments. Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)? Anchoredwith I4-l l/4" diam anchor bolts. 6 of 14 anchors are below the engineblock and there is a gap of -I/2" betweenfloor and base of DG skid. Other anchors have grout pads. It is judged that the skid has adequate capacity for the demand loads.Also it is judged thqt bolt bending is not a concern due to gap of - I I /2". (see also calculation 5 2 2 3 3 -C-0 I 8).2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.) Calculation 52233-C-018, page 4/17 confirms the anchorage configuration.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? The support beams for the EDG skids were identified not to be groutedfor their entire Iength. SQUG and design basis documentation provides justification for this finding.Sheet l0 of 439@N/A X X X X X X Paul C. Rizzo Associates, Inc. E:\CINEERS &, CONSTJLTA}IISSeismic Walkdown Checklist (SWC)Equipment ID No. IEE-EG-2 Equip. Class 17. Engine GeneratorsEquipment Description Diesel GeneratorInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerra.l"/,', r' /'r:',,'. te' t/' i"::l'Adam L. Helffrich Date: Date: X Sheet of 439 r0lU20r2 t0/U2012 12 of 439 Paul C. Rizzo Associates, Inc.ENGTN E F:RS &. CONST}LTA"\TS Seismic Walkdown Checklist (SWC)Status: Equipment ID No. IEE-EG-2 Equipment Description Equip. Class Diesel Generator17. Engine GeneratorsOther supporting or relevant documents and photos (if any):File Name: 2-61-3-l -2l 4peg

Description:

Component Plate ID File Name: 2-62-3-l-21 jpegDescription: General view of component Paul C. Rizzo Associates, [nc.ENG IN E ERS Si C'ONSI }LTA.\'TS Seismic Walkdown Checklist (SWC)Status:@Sheet 13 of 439 U N Equipment ID No. IEE-EG-2 Equipment Description Equip. Class Diesel Generator 17 . Engine GeneratorsFile Name: 2-63-3-l -zljpegDescription: General view of DG exhaust pipeFile Name: 2-64-3-l-21 jpegDescription: Partial view of anchorage configuration Sheet 14 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & C'ONST}UTAIVTS Seismic Walkdown Checklist (SWC)Status:@Equipment ID No. IEE-EG-2 Equip. Class Diesel Generator Equipment Description17. Engine GeneratorsDescription: View of base detail showing no grout below DG's middle section.File Name: 2-73-3-l -zljpeg Paul C. Rizzo Associates, Inc.EN(;INEERS {. CONSTJTTA]SI.q Seismic Walkdown Checklist (SWC)Status:@Sheet l5 of439 U N Equipment ID No. IFC-E-1A Equipment Description Fuel Equip. Class 21. Tanks and Heat Exchangers Pool Heat Exchanser lA Location: Bldg. FULBFloor El. 735 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Mounted on two saddles. Fixed saddle with 8-5/8" diam anchor bolts and slidingsaddle with 4-5/8" diam anchors. Mounted on -3'-6" tall concrete pedestal. No edge distance issue found.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yo forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y U N Y N Y N Y N Y N/A U N/A U NiA U N/A U N Y X X X X X X PC? Paul c. Rizzo Associates, Inc.ENC;INEERS {r CONSULTA"\TS Seismic Walkdown Checklist (SWC)Equipment ID No. IFC-E-1AEquip. Class 21. Tanks and Heat Exchangers Equipment DescriptionFuel Pool Heat Exchanser lA16 of 439 Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage? Nozzle pipingfound to be well supported.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y N Y N/A X X X X Other Adverse ConditionsI l Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? N Y Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra ,i .' , /,, , i lt:'..ri' t ol' r:/ilt"('Adam L. Helffrich Date: Date: r0lU20r2 rutU2012 X Sheet 17 of 439 Paul C. Rizzo Associates, Inc. BrcNEER,3 & COt{SUtrSllS Seismic Walkdown Checklist (SWC)Equipment ID No. IFC-E-IA Equip. Class 21. Tanks and Heat Exchangers Equipment DescriptionFuel Pool Heat Exchanger I A Other supporting or relevant documents and photos (if any):File Name: 2-61-2-l-60jpeg

== Description:==

Component Plate IDFile Name: 2-62-2-l -60 jpeg

Description:

General view of component Status:@ Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. IFC-E-IAEquip. Class Equipment DescriptionFuel Pool Heat Exc Status:21. Tanks and Heat ExchangersFile Name: 2-63-2-l -60jpegDescription: View of saddle outter anchorage configurationFile Name: 2-64-2-l-60jpegDescription: View of saddle inside anchorage configuration @Sheet 18 of 439 U PC? Paul c. Rizzo Associatesn [nc. ENGINI ERS S{ CONSULTA.'ITS Seismic Walkdown Checklist Equipment ID No. IFC-P-IA (swc)Equipment DescriptionLocation: Bldg. FULB Equip. Class 5. Horizontal Pumps Status:@19 of 439 N/APool Recirculation PuFloor El. 735 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? Small pump on -6" tall concrete pad. Anchored with 4-l/2" diam anchors. No edgedistance issue found.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks inthe concrete nearthe anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? N Y N Y N Y N Y N Y N Y X X X X X X PCe Paul c. Rizzo Associates, lnc. Seismic Walkdown Checklist (SWC)Equipment ID No. IFC-P-lA Equip. Class 5. Horizontal Pumps Equipment Description Fuel Pool Recirculation Pump Sheet 20 of 439 Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Y Y Y Y N/A N/A9. Do attached lines have Nozzle pipingfound to be adequate flexibility to avoid damage?well supported.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y Comments (Additional pages may be added as necessary)Evaluated by:J r, .'/,'.r / ,: .' ./,i, ifut',.y' F "',i1h'"{1tAdam L. Helffrich Date: Date: tulU20l2 r0lU20r2 X Paul C. Rizzo Associates, Inc.E.r*G I N E ERS $r CON SLiLTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. IFC-P-lA Equip. Class

5. Horizontal Pumps Equipment DescriptionFuel Pool Recirculation PumpOther supporting or relevant documents and photos (if any):File Name: 2-61 I

-60jpeg

Description:

Component Plate IDFile Name: 2-62-3-l -60 jpeg

Description:

General view of component Status:@Sheet 2l of 439 U N Sheet 22 of 439 Paul C. Rizzo Associflt*$, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. IFC-P-lAEquip. Class

5. Horizontal Pumps Equipment Description Fuel Pool Recirculation Pum Status:@2-63-3-l -60 jpegFile Name:

2-63-3-l -60jpegDescription: View of anchorage base configurationFile Name: 2-64-3-l -60 jpegDescription: Flexible attached lines PCe Paul c. Rizzo Associates, Inc.E}{GINEERS & CONST}XTA"\TSSeismic Walkdown Checklist (SWC) Status:Equipment ID No. IFW-PNL-100B Equip. Class 20. Instrument and Control PanelsEquipment DescriptionHYV-IFW-I 00B Local PanelLocation: Bldg. SFGBFloor El. 735Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l.Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)? Small panel (-30"x30"x10") mounted on HSS4x4 rackwith 4-l/2" diam. channel nuts.Rack has three posts and carries two other similar panels. Each post is anchoredwith4-5/8" diameter anchors.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%o for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Sheet 23 of 439@X X X X X X of 439Paul C. Rizzo Associates, Inc.ENGINEENS {it CONSULT^NTSSeismic Walkdown Checklist (SWC)Equipment ID No. IFW-PNL-100B Equip. Class 20. lnstrument and ControlEquipment DescriptionHYV-IFW-1008 Local Panel Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Attached top entry cables have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: Eddie M. Guerra i . , t, ,, /,t'.:.rl' tt', 1rA"'(,'/Adam L. Helffrich Sheet 24 Panels r0lv20r2 r0lU20r2 X Sheet 25 of 439Paul C. Rizzo Associates, Inc. ENGI NET-RS .\. CONST ]LTA,YI S Seismic Walkdown Checklist (SWC)Equipment ID No. IFW-PNL-1008 Equip. Class

20. Instrument and Control Panels Status:@U N Equipment Description HYV-IFW-1008 Local PanelOther supporting or relevant documents and photos (if any):File Name:

2 l - I -60 jpeg

Description:

Component Plate ID File Name: 2-62-l - I -60 jpeg

Description:

General view of component Sheet 26 of 439Paul C. Rizzo Associates, Inc.Et{GlNEEns & OO!.aUUINTS Seismic Walkdown Checklist (SWC)Equipment ID No. IFW-PNL-IO0B Equip. Class 20. Instrument and Control Panels Equipment Description HYV-IFW-I 00B Local PanelFile Name: 2-63-l -l-60jpeg

Description:

View of panel anchorage Status:@File Name: 2-64-l -l -60jpeg

== Description:==

View of channel struts affached to posts il Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC) Status: @Equipment ID No. IFW-PNL-1008 Equip. Class 20. Instrument and Control Panels Equipment Description HYV-IFW-1008 Local Panel File Name: 2-73-l - I -60jpeg

Description:

View of top entry conduits Sheet 27 of 439 U Sheet 28 of 439 Paul C. Rizzo Associates, Inc. E\t;INEERS & CONST}LTA}ITSSeismic Walkdown Checklist (SWC)Equipment ID No. lPC-145 Equip. Class Status:0D. Other-Check Valve or Manual Valve @Equipment Description Location: Bldg. FULBFuel Pool Clg Sys to RWST Recirc Sys Isol.Floor El.735 Manufacturer. Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?Small manual valve on -2 I/2" diam line. Pipingfound to be adequately supported.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Y Y Y Y N/A Y X X X X X X PCe Paul c. Rizzo Ass.ciates, Inc.ENCINEERS S. C1ONSL:LTAiiTSSeismic Walkdown ChecklistEquipment ID No. IPC-145Equipment Description Sheet 29 of 439 (swc)Equip. Class Fuel Pool Clg Sys to RWST Recirc Sys Isol.Status:0D. Other-Check Valve or Manual Valve @Interaction Effects7. Are soft targets free from impactby nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) "-" Evaluated by:Eddie M. Guerra t01U2012Adam L. Helffrich t0lU20r2 X Sheet 30 of 439Paul C. Rizzo Associates, Inc. ENGINEERS {ir CONSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. IPC-145 Status: Equip. Class 0D. Other-Check Valve or Manual Valve@Equipment DescriptionFuel Pool Clg Sys to RWST Recirc Sys Isol.Other supporting or relevant documents and photos (if any):File Name: 2-61-5-l -60 jpeg

Description:

Component Plate ID File Name: 2-62-5-l -60 jpeg

Description:

General view of component 2-62-s-l -60 jpeg PCe Paul c. Rizzo Associates, Inc' seismic*";;;;;(swc) Equipment ID No. IPC-lFC-102A Equip. Class 18. Instrument (on) Racks Sheet 3l of 439@Equipment Description Location: Bldg. FULB (PS-FC-102A) rSOLFloor El.735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50%o of SWEL items requiring such verification)?Rack consists of a 2 I /2" diam post (-5' tall) anchored with 4-3/8" diam anchor bolts.Instrument attached toface of the rackwith 2-3/8" diam machine bolts. Intrument isvery light el b)2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Vo forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X PC\ESeismic Walkdown Checklist (SWC)Equipment ID No. IPC-1FC-102A Equip. ClassSheet 3218. Instrument (on) RacksEquipment Description (PS-FC-r02A) rSOLInteraction Effects 7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by:-H*/&/Ht,Eddie M. Guerua Adam L. Helffrich X of 439 N/A tOnt20t2 t0/u2012 Sheet 33 of 439 Paul C. Rizzo Associates, Inc. ETIGINEERS E. CONSUUT.$IT$ Seismic Walkdown Checklist (SWC)Equipment ID No. IPC-IFC-lD2A Equip. Class 18. Instrument (on) RacksEquipment Description (PS-FC-102A) rSOL Other supporting or relevant documents and photos (if any): File Name: 2-61-4-l-60 jpeg

Description:

Component Plate IDFile Name: 2-62-4-1 -60jpeg

Description:

General view of component Status: @ Sheet 34 of 439 Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. IPC-IFC- l02A Equip. Class 18. Instrument (on) Racks Equipment Description (PS-FC-102A) ISOL Status:@File Name: 2-63-4-l -60jpeg

Description:

Anchorage detail for post base plate File Name: 2-64-4-l-60jpegDescription: View of intrument to steel plate connection PCe Paul c. Rizzo Ass.ciates, Inc.E\'GTNEERS S. CONSI^JUIA"\TSSeismic Walkdown Checklist (SWC)Equipment ID No. IRW-I89Equip. Class 0D. Other-Check Equipment Description Location: Bldg. AXLBSheet 35 of 439 Status: Valve or Manual Valve@Primary CCW HX Outlet ValveFloor El.735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50Yo of SWEL items requiring such verification)? Small manual valve on -18" diam pipe line. No degraded condition identified.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? N/A X X X X X X Sheet 36 of 439 Paul C. Rizzo Associates, Inc.E}'GINEER5 & CONSL;LTA.\TS Seismic Walkdown Checklist (SWC)Status:Equip. Class 0D. Other-Check Valve or Manual Valve Primary CCW HX Outlet Valve @Equipment ID No. IRW-I89Equipment DescriptionInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A N/A X X X X Other Adverse ConditionsI l Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv:Eddie M. Guerra t0lU20t2 t,/,' .l / .': 1'

'/,' , ,7, {q: r,.7' t r"' l/h"(tAdam L. Helffrich t0lv20t2 X Sheet 37 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUITA}ITS Seismic Walkdown Checklist (SWC)Equipment ID No. IRW-I89 Equip. Class 0D. Other-Check Valve or Manual Valve Equipment DescriptionPrimary CCW HX Outlet Valve Other supporting or relevant documents and photos (if any):File Name:

2-61-2-l-47 .lpeg

Description:

Component Plate IDFile Name: 2-62-2-l-47 jpeg

Description:

General view of component Sheet 38 of439 Paul C. Rizzo Associates, Inc.RS S( CONSLiLTfu\TS Seismic Walkdown Checklist (SWC)Equipment ID No. 480VUS-1-8-N Equip. Class 2.Low Voltage SwitchgearEquipment Description480V BusLocation: Bldg. SRVB Floor El. 713Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?2-I/2" diam plugwelds atfront of sections verified. Welds at back of SWGR notinspected since SWGRwas energized and inaccessible.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. ls the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

@N/A X X X X X X PC?Paul c. Rizzo Associates, Inc. EiiGINEE Seismic Walkdown Checklist (SWC)Equipment ID No. 480VUS-1-8-N Equip. Class 2.Low Voltage Switchgear Equipment Description480V Bus Sheet 39 of 439 Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A x X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerra ,t i . , ./:, l+r.',!r/,tt, /-ir/'(l Adam L. Helffrich Date: Date: tOtr/20t2 r0lU20t2 X Paul C. Rizzo Associates, Inc.t NGINE t-RS & CONSULTA"\IS Seismic Walkdown Checklist (SWC)Equipment ID No. 480VUS- I N Equip. Class 2. Low Voltage Switchgear Equipment Description 480V BusOther supporting or relevant documents and photos (if any):File Name: 2-61 l-25jpeg

Description:

Component Plate ID File Name: 2-62 l -25 jpeg

Description:

General view of component Sheet 40 of 439 Status: 2-62 l -2s jpes PC\e Paul c. Rizzo Associates, rnc.seismicw";;;;(swc)Equipment ID No. 480VUS-1-9-P Equip. Class 2.Low Voltage Switchgear Equipment Description 480V Emergency Bus Location: Bldg. SRVB Floor El. 713Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?2-l/2" diam plugwelds atfront of sections verified. Welds at back of SWGR notinspected since SWGRwas energized and inaccessible.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Sheet 4l of439 @N/A NiA N/A NiA X X X X X X Sheet 42 of 439Paul C. Rizzo Associates, Inc. seismic*",;;;;(swc)Equipment ID No. 480VUS-1-9-P Equip. Class 2. Low Voltage SwitchgearEquipment Description480V Emergency BusInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A N/A X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv:Eddie M. Guerua r0lU20l2.f i i... /: ,,tirr'r/ rt"ty'Jl't//Adam L. Helffrich tOlr/2012 X Sheet 43 of 439Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. 480VUS- I P Equip. Class 2. Low Voltage Switch gear Status:@Equipment Description 480V Emergency Bus Other supporting or relevant documents and photos (if any): I File Name : 2-61 l -26jpeg

== Description:==

Component Plate ID File Name : 2-62-4-l -26jpeg

Description:

General view of component Sheet 44 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS 6i CONST}LTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. 480VUS-l P Equip. Class 2. Low Voltage SwitchgearEquipment Description480V Emergency Bus Status:File Name: 2-63-4-l-26 4peg

Description:

Base detail from inside of component PCe Paul c. Rizzo Associates, lnc.E}{{;INE ERS {i CON*SI;LTA,\TSSeismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-lAE Equip. Class 3. Medium Voltage SwitchgearSheet 45 of439 @Equipment Description Location: Bldg. SRVB4160V Emergency Bus Floor El. 713Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)? 8 plugwelds (I-l/4" diam) verffied at thefront of the SWGR sections. Welds at the back not verified as the panel was energized. 3 rows of embed channels under theSWGRwere verffied. Two atfront of the SWGR qnd one at the back.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X Sheet 46 of439Paul C. Rizzo Associates, Inc.EIiC;INEERS Sr CONSULTA.\TS Seismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-lAE Equip. Class 3. Medium Voltage Equipment Description4160V Emergency Bus Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse Conditions1l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv: Eddie M. Guera r0lU20l2i . .j',r/ j .' ' ,; ,/.,:)/u'.y' 7t "'7';2'"'1t Adam L. Helffrich t0lv20l2 X Sheet 47 of 439 Paul C. Rizzo Associates, Inc. ENGINEIRS S CONST;LTAVS Seismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-lAE Equip. Class

3. Medium Voltage SwitchgearEquipment Description4160V Emergency Busdocuments and photos (if any):File Name : 2-61 l -25jpegDescription: General view inside of component Status:File Name : 2-62-9-l

-25j pegDescription: Inside view of component showing base detail g or relevant 2-62-9-t -zsjpeg Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-IAE Equip. Class

3. Medium Voltage Switchgear Equipment Description4160V Emergency BusFile Name: 2-63-9-l-25jpeg

== Description:==

Component Plate ID@Sheet 48 of 439 UFile Name: 2-64-9-l -zsjpeg

Description:

General view of component Sheet 49 of 439 Paul C. Rizzo Associates, Inc.Seismic lYalkdown Checklist (SWC)Equipment ID No. 4KVS-IAE Equip. Class

3. Medium Voltage Switchgear Equipment Description 4160V Emergency BusFile Name: 2-73-9-l-25jpegDescription: View of steel floor embeddment PCe Paul c. Rizzo Associates, Inc.Sheet 50 of439Seismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-IDF Equip. Class 3. Medium Voltage SwitchgearEquipment Description 4160V Bus Location:

Bldg.SRVBFloor El. 713 Manufacturer. Model. Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)? 8 plug welds (l -I/4" diam) verified at the front of the SWGR sections. Welds at theback not verified as the panel was energized. 3 rows of embed channels under the SWGRwere verified. Two atfront of the SWGR and one at the back.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

@X X X X X X Sheet 5 I Paul C. Rizzo Associates, Inc.EN(jINF,ERS & CONSI.:UTA*\TSSeismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-lDF Class 3. Medium VoltaseEquipment Description 4160v Equip.BusInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse Conditions1 l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: Eddie M. Guerraof 439 Status: Switchgear N/A t0n/2012 t0nt20t2 X Sheet 52 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. 4KVS-IDF Equip. Class

3. Medium Voltage SwitchgearEquipment Description4160V BusOther supporting or relevant documents and photos (if any):File Name: 2-61-3-l

-26.1pe9

Description:

Component Plate ID File Name: 2-62-3-l -26j pegDescription: General view of component Status:@2-62-3-l-26jpeg Sheet 53 of 439 Paul C. Riszo Associates, Inc.Seismic lYalkdown Checklist (SWC)Equipment ID No. 4KVS-IDF Equip. Class 3. Medium Voltage SwitchgearEquipment Description4160V BusFile Name: 2-63-3-l -26 Speg

Description:

General view inside of componentFile Name: 2-64-3-l -26.1peg

Description:

Inside view of component showing base detail Sheet 54 of 439EIiGINEERS S. CONSLT'IjTA,\TSSeismic Walkdown Checklist Equipment ID No. BAT-l-lEquipment DescriptionPaul C. Rizzo Associates, Inc.(swc)@Equip. Class 15. Battery Racksl25Y DC Battery/Instrument Control Power Location: Bldg. SRVB Manufacturer, Model, Etc.Floor El. 713 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50oh of SWEL items requiring such verification)?Braced rack-double wide rack composed of 6 bays. Each boy anchoraed with 6- I /2" diam anchors. End restraints and spacersfound in adequate condition.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)

Anchorage configuration confirmed per drawing 8700-1.24-l E and calcualtion 52233-C-016 Anchorage Calc.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? X X X X X X SheetPaul C. Rizzo Associates, Inc. ENCINEERS {i. CONSULTA:IYTSSeismic Walkdown Checklist (SWC)Equipment ID No. BAT-l-lEquipment DescriptionEquip. Class 15. Battery Racksl25V DC Battery/lnstrument Control Power Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? Blockwalls SB-I-l I, SB-I-12, SB-l-13, SB-1-14 snd SB-l-l5 hsve been qualified per IE 80-l I review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)Evaluated bv: Eddie M. Guerra Date:., /" i ir':.?l t't' t'ft'"'{'! Adam L. Helffrich 55 of 439 Status: tOlt/2012 t0tu20t2 X Sheet 56 of 439 Paul C. Rizzo Associates, Inc.H.\-G INEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-l-lEquip. Class 15. Battery Racks Equipment Descriptionl25V DC Batteryllnstrument Control Power Other supporting or relevant documents and photos (if any):File Name: 2-73-l-l-l I jpegDescription: Component Plate IDFile Name: 2-61-l-l-l I jpegDescription: General view of component Sheet 57 of 439 Paul C. Rizzo Associates, Inc.ENGIN EERS Ci CONSIJLTA.I\TS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-l-lEquip. Class I 5. Battery Racks Equipment Description l25V DC Baffery/lnstrument Control Power Status:@U NFile Name: 2-62-l-l-l I jpegDescription: View of flexible attached linesFile Name: 2-63-l-l-l I jpeg

Description:

Typical frame anchorage configuration I I I I I 2-63-l-l-l I jpes Sheet 58 of439Paul C. Rizzo Associates, Inc.ENCINEERS S. CONSUITANTS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-l-2Equip. Class 15. Battery Racks Equipment DescriptionI25V DC Batterv 2/Instrument Control Power@Location: Bldg. SRVB Manufacturer, Model, Etc.Floor El. 713 Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)? Braced rack-double wide rack composed of 6 bays. Each bay anchoraed with 6-I/2" diam anchors. End restraints and spacers found in adequate condition.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)Anchorage configuration confirmed per drcrwing 8700- 1.24-l E and calcualtion 52233-C-016 Anchorage Calc.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? N/A X X X X X X PC?Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-l-2 Equip. Class 15. Battery RacksEquipment Descriptionl25V DC Batterv 2/Instrument Control Power Sheet 59 of439Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment? Blockwalls SB-l-l l, SB-l-12, SB-l-13, SB-l-14 and SB-l-i,5 have been qualffied per IE 80-11 review.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerra r0/U20t2/tj .,. ,, ,/,:,/+':t,.'/r/ ts /r'/i7'r(./1 'Adam L. Helffrich t0lU20t2 X Sheet 60 of 439 Paul C. Rizzo Associates, Inc.H.r-G lN E ERS,Si CONS tiuf A.\TS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-I-2 Equip. Classl5. Battery Racks Equipment Descriptionl25V DC Battery 2llnstrument Control PowerOther supporting or relevant documents and photos (if any):File Name: 2 I - I -01 jpegDescription: Component Plate IDFile Name : 2-61 -l -I -01 jpeeDescription: General view of component Status: 2-61-l-l-0ljpeg Paul C, Rizzo Associates, Inc.EN(:INEERS &. CONSI.ITTA.'\TS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-l-2Equip. Class 15. Battery Racks Equipment Descriptionl25V DC Battery 2/lnstrument Control PowerFile Name: 2-62-l - I -01 jpeg

Description:

Flexible attached lines Status:@Sheet 6l of 439 U NFile Name : 2-63-l - I -01 jpegDescription: Typical frame anchorage configuration DCe Paul C. Rizzo Associates, lnc. E\GINEE&S {i CONSI.

LT&\iTSSeismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-l-1 Equip. Class 16. Battery Chargers and InvertersEquipment DescriptionStation Battery Charger NO.

I Location: Bldg. SRVBFloor El. 713Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?

r;;anchoredwith 4-5/8" diam anchors.

-4" gapfound to next paneliudged not a2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) A nc ho r age c onfi gur ati on c onfi r me d pe r C al c ul at i o n D SC - 6 69 86. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Sheet 62 of 439 Status:@X X X X X X PCe Paul c. Rizzo Associates, lnc.ENC:INEERS & CONSI.JLTANTT Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-I-I Equip. Class 16. Battery Chargers and InvertersEquipment DescriptionStation Battery Charger NO. ISheet 63 of 439 Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage? Top entry conduits found with adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A N/A X X X XOther Adverse Conditions1 l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guera r0lU20l2 tr ,' ,' ' /t '/:, f* t..r/' u t, { i./'( /./t'Adam L. Helffrich t0lU2012 X Sheet 64 of 439Paul C. Rizzo Associates, Inc.ENGINEERS E. CONSUUTANTS Seismic Walkdown Checklist (S\ilC)Equipment ID No. BAT-CHG-I-l Equip. Class 16. Battery Chargers and Inverters Equipment Description Station Battery Charger NO. I Other supporting or relevant documents and photos (if any):File Name: 2 I - I -03 jpegDescription: Component Plate IDFile Name: 2-62-l -l -03 jpegDescription: General view of component Sheet 65 of 439Paul C. Rizzo Associates, lnc.ENGINEERS &. CONSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-I-I Equip. Class 16. Battery Chargen and Inverters Equipment Description Station Baffery Charser NO. I Status:@File Name: 2-63-l -l -03 jpegDescription: View of top entry conduitsFile Name: 2-64-l -l -03 jpegDescription: View of component anchroage configuration Sheet 66 of 439 Paul C. Rizzo Associates,Inc. T}iGINEERS Sr CIJNSLILTA,\TS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHGI-Z-A Equip. Class 16.Battery Chargers and Inverters Equipment Description Battery Charger Location: Bldg. SRVB Floor El. 713Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Component identified as a compartment in BAT-CHGI-2. Battery charger is anchoredwith 4-5/8" diam anchors.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Y X X X X X X ry Paul c. Rizzo Associatesn lnc.Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHGI-2-A Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionBattery ChargerSheet 67 of439 YInteraction Effects 7 . Are soft targets free from impact by nearby equipment or structures? Battery charger BV-BAT-CHGl-2 is adjacent to switchboard DC-SWBDI-2 and there is 0" gap between the two panels. These panels are not connected to each other andhence Condition Report CR-2012-14321 was issued to resolve this concern.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)Evaluated bv: Eddie M. Guera tulU20l2 tLnt20r2 X Paul C. Rizzo Associates, Inc.t'N(;l N f- ERS dr CONSI

U I/L\TS Seismic Walkdown Checklist (SWC)Equipment ID No.BAT-CHG l-2-A Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionBaffery ChargerOther supporting or relevant documents and photos (if any)
File Name : 2-61 1-26jpegDescription: Component Plate IDFile Name : 2-62-5-l

-26j pegDescription: General view of componentSheet 68 of 439 Status: 2-62-5-l -26j peg Sheet 69 of 439Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHGI-2-A Equip. Class 16. Battery Chargers and Inverters Equipment Description Battery Charger Status:File Name: 2-63-5-l -26 SpegDescription: View of component anchroage configurationFile Name: 2-64-5-l -26 trpegDescription: View of top entry conduits Sheet 70 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS g( CONSULTANTS Seismic Walkdown Checklist (SWC)Status:@Equipment ID No. BAT-CHG-l-3 Equip. Class 16. Battery Chargers and InvertersEquipment Description Station Battery Charger NO. 3 Location: Bldg. SRVBFloor El. 713Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?Charger anchored with 4-5/8" diam anchors. -4" gap found to next panel judged not a concern.

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X Sheet 7l of 439 Paul C. Rizzo Associates,Inc.H\CINEERS & C{}NSULTAJYTSSeismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-l-3 Equip. Class 16. Battery Chargers and InvertersEquipment DescriptionStation Battery Charger NO. 3 Status:@Interaction Effects7 . Are soft targets free from impactby nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Block wall SB- I - I 5 has been qualffied per IE 80- I I review.9. Do attached lines have adequate flexibility to avoid damage?Top entry conduits found with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X XOther Adverse Conditions1 l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) tulU20l2 i : '/. ,/'..'! l :' i ./'i '.,)/q:t.y' tt'r{/"".4 Adam L. Helffrich 101U20t2 X;ru4(H"4j,^ Evaluated bv: Eddie M. Guerra Sheet 72 of 439Paul C. Rizzo Associates, Inc.b.llcINEERS & CON$LiLTA"YI'S Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-I-3 Equip. Class 16. Battery Chargen and Inverters Equipment Description Station Battery Charger NO. 3Other supporting or relevant documents and photos (if any): Status:@File Name:

== Description:==

2-61-l-l-02jpeg Component Plate ID File Name: 2-62-l -l -02jpegDescription: General view of component 2-62-l -l -02jpeg Sheet 73 of 439Paul C. Rizzo Associates, Inc.ENGTN EERS di CONSI.ILTA"\TS Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-1-3 Equip. Class 16. Battery Chargers and Inverters Equipment Description File Name : 2-63-l 02jpeg

== Description:==

View of top entry conduits Status:File Name : 2-64-l -l -02jpeg

== Description:== View of component anchorage configuration Station Baffery Char er NO. 3 Paul C. Rizzo Ascociates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. BAT-CHG-I-3 Equip. Class 16. Battery Chargers and Inverters Equipment Description

== Description:== Close up view of component anchorage@Sheet 74 of 439 UFile Name: 2-73-l-l -02 jpeg Sheet 75 of 439 Paul C. Rizzo Associates,Inc. EN(;INEERS & CONSL}LT6.\TS Seismic Walkdown Checklist (SWC)Equipment ID No. BB-AI20. Instrument and Control Panels@ControlEquip. Class RoomEquipment DescriptionLocation: Bldg. SRVBFloor El.735Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Vo of SWEL items requiring such verification)? Control room bench board. Anchorage is coveredwith mastic and cannot be inspected.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X Sheet 76 of 439 Paul C. Rizzo Associates, Inc.ENC:INE.ERS $. CONSUTTA.\iTSSeismic Walkdown Checklist (SWC)Equipment ID No. BB-AI Equipment Description Control20. Instrument and Control Panels Status:@Equip. Class RoomInteraction Effects 7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Control room ceiling's main runners are supported by wires at -4' spacing. Each ceiling tile (i.e., ege grating) is tied to the main runners at each of its four corners with tie wraps. Judged no interaction concern.9. Do attached lines have adequate flexibility to avoid damage?

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A N/A X X X X Other Adverse Conditions I L Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Eddie M. Guerra t0lt/20t2'! ,' ,." , /t

, /r,:.', ^t/ i" t r'{. !.",!Adam L. Helffrich r0lU20t2 X Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Status:@Sheet 77 of 439 U Equipment ID No. BB-AI Equipment DescriptionEquip. Class Control Room20. Instrument and Control Panels Other supporting or relevant documents and photos (if any): File Name: 2-61-5-l-18 jpeg

Description:

General view of componentFile Name: 2-62-5-l-l Sjpeg

== Description:== View of insulating material covering component anchorage Sheet 78 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CON$T}LTANTS Seismic Walkdown Checklist (SWC)Status:@Equipment ID No. BB-AIEquip. Class Control Room20. Instrument and Control Panels Equipment DescriptionFile Name : 2-63 I - I Sjpeg

Description:

View of electrical instrumentation connected to panel Sheet 79 of 439Paul C. Rizzo Associates, Inc,ENGINF.ERS S{ CONSUTTA,\'TS Seismic Walkdown Checklist Equipment ID No. CC-TK-1 (swc)Equip. Class 21. Tanks and Heat Exchangers Status:@Equipment Description Location: Bldg. AXLBComponent Cooling Water Surge TankFloor El.768 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Tank supported on 4 legs (L6 x 6 x 1/2). Each leg anchored with l-1" diam anchor.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X Sheet 80 of439 Paul C. Rizzo Associates, Inc.E--(TINE E RS & CONST ILTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. CC-TK-I Equipment Description Equip. Class 2l. Tanks and Heat ExchangersComponent Cooling Water Surge Tank Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X X Other Adverse Conditions I l Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerua r0lU20r2/., r',I/t",.rl' l tl{h'Tlt Adam L. Helffrich tOnt20t2 X Sheet 8l of 439 Paul C. Rizzo Associatec, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. CC-TK-IEquip. Class 21. Tanks and Heat Exchangers Equipment Description Component Cooling Water Surge TankOther supporting or relevant documents and photos (if any):File Name: 2-61-l -l-l 5 jpegDescription: Component Plate IDFile Name: 2-63-l -l -l 5 jpegDescription: General view of component Paul C. Rizzo Associates, Inc.ENGINEERS E. CONSUUTA}ITS Seismic Walkdown Checklist (SWC)Equipment ID No. CC-TK-IEquip. Class 21. Tanks and Heat Exchangers Equipment Description Component Cooling Water Surge TankDescription: View of anchorage detail for a typical tank support Status: @Sheet 82 of 439 UFile Name: 2-62-l-l-15 jpeg Paul C. Rizzo Associates, Inc. seismicw";;;;;(swc)Equipment ID No. CH-P-lC Equip. Class 5. Horizontal Pumps Status:@Sheet 83 of439 U NEquipment DescriptionLocation: Bldg. AXLB Charging Hieh-Head Safety Iniection Pump Floor El.722Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments. AnchorageL Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?Pump anchoredwith 16-1" anchor bolts. Mounting basefound in good condition.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.) Anchorage verified per calculations CH-P-lC and 52233-C-007.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y U N Y N Y N Y N Y N/A U N/A N/A N/A U N Y X X X X X X PC-e Paul c. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. CH-P-IC Equip. ClassEquipment Description Clarging High-Head Status:@Sheet 84 of 439 U N 5. Horizontal PumpsSafety Injection Pump Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?U N Y N Y N Y U N Y N/A U N/A U N/A X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

U N Comments (Additional pages may be added as necessary) Evaluated bv: Eddie M. Guerra ,t/. ./,'.t / i.." 1.1.

, y't t, ^?t l r'/.-,L"(.'tAdam L. Helffrich Date: Date: t0nt20t2 t0ly20r2 X Sheet 85 of 439 Paul C. Rizzo Associates, lnc.

E.r*GINEERS &. CONSI-}LTAI{TS Seismic Walkdown Checklist (SWC)Equipment ID No. CH-P-IC Equipment DescriptionEquip. Class 5. Horizontal Pumps Charging High-Head Safety Injection PumpOther supporting or relevant documents and photos (if any):File Name : 2-61 -l -l -l TjpegDescription: Component Plate ID File Name: 2-62-l - I -l Tjpeg

Description:

General view of component Sheet 86 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. CH-P-IC Equipment Description Equip. Class 5. Horizontal PumpsCharging High-Head Safety Injection Pump File Name: 2-63-l-l -17 .1pegDescription: View of component anchorage configuration File Name: 2-73-l-l-l Tjpeg

== Description:== View of flexible affached lines PC\e Paul c. Rizzo Associates, Inc.ENGINEERS &. CONSUUTA,\TSSeismic Walkdown Checklist (SWC)Equipment lD No. CH-BL-2Equipment Description Location: Bldg.AXLBSheet 87 of 439 @Equip. Class Boric Acid Blender21. Tanks and Heat Exchangers Floor El.768 Manufacturer. Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage1.Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?Small tank (-5' diam x -6' tall) supported off of o steel platform at its mid-height. Thestffined ring support is attached to steel platform by 8-1" diam machine bolts. The agitator is directly attached to top of the tankwith 8-5/8" diam machine boltswith flange connections. The braced steel platform is attached to wall at top and anchored tofloor through two posts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%o for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A N/A N/A X X X X X X PC\e Paut c. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. CH-BL-2 Equip. Class 2l. Tanks and Heat ExchangersEquipment DescriptionBoric Acid Blender Sheet 88 of439 Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) r0/U2012 , ',r / i',- ; .n/,' .7 a/t4, t'/,t/ {"' t ;{t'"r. "t'Adam L. Helffrich t0/r/20t2 X Evaluated bv: Eddie M. Guerra Sheet 89 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CI)NSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. CH-BL-2 Equip. Class 21. Tanks and Heat Exchangers Equipment Description Boric Acid BlenderOther supporting or relevant documents and photos (if any): File Name: 2-61-6-l -60 jpegDescription: Component Plate ID File Name: 2-62-6-l -60jpeg

Description:

General view of component Status:@2-62-6-l -60 jpeg Sheet 90 of 439 Paul C. Rizzo Associates, Inc.ENGINE ERS & CONST;LTA.\TSSeismic Walkdown Checklist (SWC)Status:@Equipment ID No. CH-BL-2Equipment Description Equip. ClassBoric Acid Blender 21 . Tanks and Heat Exchangers 2-63-6-l -60 jpes File Name: 2-63 I -60 jpeg

Description:

View of agitator mounting on Boric Acid Batch Tank File Name: 2-64 I -60 jpeg

Description:

View of platform surrounding Boric Acid Batch Tank 2-64-6-l -60 jpeg PCe Paul C. Rizzo Associates, Inc.ENGINEERS & CONSIJLTA-\TS Seismic Walkdown Checklist (SWC)Equipment ID No. CH-P-2AEquipment Description Location: Bldg. AXLB Manufacturer, Model, Etc.Sheet 9l of 439 Status:@Equip. Class 5. Horizontal Pumps Boric Acid Transfer Pump Floor El.752Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage l.Is the anchorage configuration verification required (i.e., is the item oneof the 50%o of SWEL items requiring such verification)?Only two out of 4 anchors visible ( 2 are below an insulated box over the pump portion). 2-5/8" anchors identified.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that oxidation?is more than mild surface4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%o for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X PCe Paul c' Rizzo Ass.ciates, lnc.ENGINT,ERS S. CONSULTA"\TSSeismic Walkdown Checklist (SWC)Equipment ID No. CH-P-2AEquipment Description BoricSheet 92 of 439 @Equip. Class 5. Horizontal Pumps Acid Transfer PumpInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distributionand masonry block walls not likely tosystems, ceiling tiles and lighting, collapse onto the equipment?

N/A 9. Do attached lines have adequate flexibility to avoid damage? Nozzles are identified to be well supported.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse Conditions1 l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv:Eddie M. Guera r0lr/20t2 r '-. ,'/',',1 / ;- ,J' .// ,:, lt' t,.//' gc- "'7, )/' 1 ll-Adam L. Helffrich r0lll20t2 X Sheet 93 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS {! CONSTJ LTA,\TSSeismic Walkdown Checklist (SWC)Equipment ID No. CH-P-2AEquipment Description Equip. Class 5. Horizontal Pumps Status:@Boric Acid Transfer Pump Other supporting or relevant documents and photos (if any):File Name : 2-61 -l -l -l 3 jpeg

Description:

Component Plate IDFile Name : 2-62-l -l -l 3 jpeg

Description:

General view of component Paul C. Rizzo Associates, I"nc. ENGINEER.S {i. CONSULTANIS Seismic Walkdown Checklist (SWC)@Sheet 94 of 439 UEquipment ID No. CH-P-2AEquipment Description Equip. Class 5. Horizontal PumpsBoric Acid Transfer Pump File Name : 2-63-l - I - I 3 jpeg

Description:

View of component anchorage configuration PCe Paul c. Rizzo Associates, [nc.ENCINEERS &. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. CH-TK-IA Equip. Class

21. Tanks and Heat ExchangersSheet 95 of 439 Status:@Equipment DescriptionBoric Acid TankLocation: Bldg.

AXLBFloor El.752 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage l.Is the anchorage configuration verification required (i.e., is the item one of the 50Yo of SWEL items requiring such verification)?Tank supported on 4 legs. Each leg anchoredwith 2-1" diam anchor bolts. Thread engagement at one of the anchors is short by -l/2 thread. Judged not q concern.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage calculation 522 3 3-C-03 I confirms configuration

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

x X X X X X PCt? Paul c. Rizzo Associates, lnc.RS & CONSL;LTA"\TS Seismic Walkdown Checklist (SWC)Equipment ID No. CH-TK-lA Equip. ClassEquipment Description Boric Acid TankSheet 96 of 439@2l. Tanks and Heat Exchansers Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?NiA X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: ffil&#dt" Eddie M. Guerra r0lU20r2 , ; /, .'/.'./ ./ ,... i -r';.: t /r/.':!l' +r / r,r!'ir"l'(Adam L. Helffrich r0/lt20r2 X Sheet 97 of 439 Paul C. Rizzo Associates, Inc.I N(;l Nt. t]RS,S. CO.r*St : LI ANT S Seismic Walkdown Checklist (SWC)Equipment ID No. CH-TK-lAEquip. Class 2l . Tanks and Heat ExchangersEquipment DescriptionBoric Acid Tank Other supporting or relevant documents and photos (if any):File Name : 2 l - l -l 4jpegDescription: Component Plate IDFile Name : 2-62-l - I - l 4jpeg

Description:

General view of component Status:@U N Paul C. Rizzo Associate$, Inc. ENGINEENS &. COT{$UUTAITITSSeismic Walkdown Checklist (SWC)Equipment ID No. CH-TK-lA Equip. Class Status:21. Tanks and Heat Exchangers N@Sheet 98 of 439 UEquipment DescriptionBoric Acid Tank File Name: 2-63-l - l-l4jpeg

Description:

View of anchorage detail for a typical tank support DCe Paul c. Rizzo Associates, lnc.E}i(jINE ERS & CONSUTTfu\TSSeismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-IEquip. Class 14. Distribution Panels Equipment Description l25V DC BusLocation: Bldg. SRVBFloor El.713 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)? The switchboard is attached to three sill channels at base with six I/2" diameter bolts.The sill channels are anchored to concrete floor with six l/2" diameter anchor bolts (2atfront, 2 at middle and 2 at back). Component identified not to be attached toadjacent DC Battery SWGR No.1 panel. No essential relqts identified in either of the two panels, and therefore judged not a concern.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)Both SEWS and calc. 52233-C-014 identifufour attachment pointsfor thisswitchboard. The referenced calculation conservatively shows anchor bolt adequacybased onfour bolt pattern.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Sheet 99 of 439@X X N/A N/A X X X X Sheet 100 of439 Paul C. Rizzo Associates, Inc.E}iCINEERS {i CONSULTA.\TS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-l Equip. Class 14. Distribution Panels Equipment Description l25V DC Bus Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Blockwalls SB-l-l I, SB-1-12 and SB-1-l 3 have been qualified per IE 80-l I review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? N/A X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)ti .-)' .-v.J.,*4,-{Evaluated bv:Eddie M. Guerua r0lll20t2Adam L. Helffrich r0lll20t2 X l0l of 439 Paul C. Rizzo Associates, Lnc.ENGIN EERS S. CONST}LTA}ITS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-l Equip. Class 14. Distribution Panels Equipment Description l25V DC Bus Other supporting or relevant documents and photos (if any): File Name: 2-61-l l-l-zsjpeg

== Description:==

Component Plate ID File Name: 2-62-l I -l -25.;peg

Description:

General view of component Status: Sheet 102 of 439 Paul C. Rizzo Aseociates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-I Equip. Class 14. Distribution Panels Equipment Description l25V DC Bus File Name: 2-63-l l-l -25 jpeg

Description:

View of channel mounting base File Name: 2-64-1 l-l -ZlSpegDescription: General view inside component Sheet 103 of 439Paul C. Rizzo Associates, Inc.ENCIN EERS & CONST JUTA"\ilS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-l Equip. Class I 4. Distribution Panels Equipment Description 125V DC Bus Status:@2-94-l l-l -25 jpesFile Name: 2-94-l I - I -25 jpeg

Description:

Inside view of back of baffery brakerFile Name:2-95-l l-l -25trpegDescription: One l12 diam anchor bolt identified at back of breaker. Sheet 104 of 439Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-I Equip. Class 14. Distribution Panels Equipment Description l25V DC Bus

Description:

Inside view from back of switch boardFile Name: 2-97-l l-l-25jpeg

== Description:==

2 bolts identified at back of switch board.File Name: 2-96-l l-l-25 jpeg Sheet 105 of439 Paul C. Rizzo Associates, Inc.

  • NCINEERS S{ CONSL}UTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-2 Equip. Class 14.

Distribution Panels Equipment DescriptionI25V DC Bus Location: Bldg. SRVB Floor El. 713 Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?The switchboard is attached to three sill channels at base with six I/2" diameter bolts. The sill channels are anchored to concrete floor with six I/2" diameter anchor bolts (2 atfront, 2 at middle and 2 at back).2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)Both SEWS and calc. 52233-C-014 identifyfour attochment pointsfor this switchboard.

The referenced calculation conservatively shows anchor bolt adequacybased onfour bolt pattern.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Y N/A X X X X X X pct? Paul c- Rizzo Associates, Inc.E\'(;INEERS,& CONSI"iLT,4.YIS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-2Equip. Class

14. Distribution Panels Equipment Descriptionl25V DC Bus Sheet 106 of439 Status: Y X Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?There is a potentialfor seismic interaction identified befiveen stitch board BV-DC-SWBDI-2 and Battery Charger BV-BAT-CHG I-2. Condition Report issuedfor this condition (CR 20 I 2-I 432 I ).8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Blockwalls SB-l-6, SB-l-7 and SB-I-8 have been qualified per IE 80-11 review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A N/A X X X Other Adverse Conditions I l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) tuly20r2 Date: t0lu20r2 XEvaluated by:Eddie M. Guerra Sheet 107 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-2 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus Other supporting or relevant documents and photos (if any):File Name: 2-61-6-l -26.1peg

Description:

Component Plate IDFile Name: 2-62-6-l-26 Speg

Description:

General view of component Status: Y Sheet 108 of 439Paul C. Rizzo Associates, [nc.ENGINEERS S. CONSLILT&\TS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-2 Equip. ClassI 4. Distribution Panels Equipment Description l25V DC Bus

Description:

View of flexible lines going though switch board cabinetFile Name: 2-73-6-l-26 jpeg

Description:

Inside view from front of component Status:File Name

2-64-6-l -26jpeg 2-73-6-t-26 jpeg Sheet 109 of 439Paul C. Rizzo Associates, Inc.E}i(;INE,ERS Ci CONSI.: LTA,\T S Seismic Walkdown Checklist (SWC)Status: Equipment EquipmentID No. DC-SWBDI-2 Equip. Class 14. Distribution Panels Descriptionl25V DC BusFile Name : 2-94-6-l

-26jpegDescription: View of anchorage detail from front of componentFile Name : 2-95-6-l -26 jpegDescription: General view frominside of battery braker taken from the back Sheet I l0 of 439Paul C. Rizzo Associates, Inc.EM;INEERS &. CI}NSI-}UTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-? Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus File Name: 2-96-6-l-26 jpegDescription: One ll2 diam anchor bolt identified at back of breaker.File Name: 2-97 l-26 SpegDescription: View of switchboard anchorcge taken from back Paul C. Itizzo As.sociates, Inc.FN(;lNf IRS &. aONit,l:l'ANTS Seismic Walkdown Checklist (SWC)Status: Equipment ID No. DC-SWBDI-2 Equip. Class DC BusI 4. Distribution Panels Equipment Description l25V Sheet of 439 taken from back File Name : 2-98-6-l -26jpeg

Description:

General view for inside of switch board Sheet Il2of439Paul C. Rizzo Associates, Inc.F,iiCTNEERS & CONST}LTANTS Seismic Walkdown Checklist (SWC)Status:@Equipment ID No. DC-SWBDI-3Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 3 Location: Blde.SRVB Floor El. 713 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?The switchboard is attached to three sill channels at base with six l/2" diameter bolts.The sill channels are anchored to concrete floor with six I/2" diameter anchor bolts (2 atfront, 2 at middle and 2 at back). Component identified not to be attached to adjacent DC Battery SWGR No.3 panel. No essential relays identified therefore judged not a concern. DC Battery SWGR No.3 Panel identified to be anchoredwith 2-1/2" diam anchors atfront and l-l/2" diam anchor at back ofpanel. Typicalc onfiguration for all SWB D's.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)Both SEWS and calc. 52233-C-014 identify four attachment points.for this switchboard. The referenced calculation conservatively shows anchor bolt adequacy based onfour bolt pattern.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X Sheet Paul C. Rizzo Associates, Inc.ENGTN*ERS \Tit CONSULTA"YIS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-3Equip. Class

14. Distribution Panels Equipment Descriptionl25Y DC Bus 3 Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Blockwall SB-l-l5 has been qualified per IE 80-l I review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv: mttkj"#r Eddie M. Guema; ' /. "'.'./ / !.- ; .1., , , ) {+ .:.r7' tt/l{=it"(t'Adam L. Helffrich Date: Date: X of 439 r0lv20l2 t0l1l20r2 Sheet ll4 of 439Paul C. Rizzo Associates, Inc.ENGINEERS &. CONSTJTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-3 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 3 Other supporting or relevant documents and photos (if any): Status:@File Name:

== Description:==

2-61-l-l -25 jpeg Component Plate IDFile Name: 2-62-l -l -25jpeg

Description:

General view of component Sheet I 15 of 439 Paul C. Rizzo Associates, Inc.E.r-(:l N E ERS 6i CrJNSLl LTAIVIS Seismic Walkdown Checklist (SWC)Equipment ID No.DC-SWBDI-3Equip. Class 14. Distribution Panels Status:Equipment Description l25V DC Bus 3File Name: 2-63-l -l -zsjpeg

== Description:==

View of channel mounting baseFile Name: 2 l - I -25 jpeg

Description:

View of flexible lines going though switch board cabinet Sheet I 16 of 439Paul C. Rizzo Associates, Inc.ENGINEERS 6. CON$ULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-3 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 3 Status:@Description: General view from inside of component taken from the frontFile Name: 2-94-l-l-25jpegFile Name: 2-95-l -l -zsjpegDescription: General view from inside of component taken from the back Paul C. Rizzo Associates, Inc.T,}{GI N E ERS &. C-ONSULTA}iT S Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-3Equip. ClassI 4. Distribution Panels Equipment Descriptionl25V DC Bus 3 Sheet ll7 of 439 Status:@File Name : 2-96-l -l -zsjpeg

== Description:==

General view from inside of braker taken from behindFile Name : 2-97 -l -l -25j pegDescription: One l12" diam anchor bolt identified at back of breaker. Sheet 118 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-3 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 3

Description:

Anchorage detail of braker taken from the front Status:@File Name: 2-98-l-l-25jpeg BCe Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDl-4Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 4 Location: Bldg.SRVB Floor El.7t3 Manufacturer. Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?The switchboard is attached to three sill channels at base with six I/2" diameter bolts.The sill channels are anchored to concrete floor with six I/2" diameter anchor bolts (2 atfront, 2 at middle ond 2 at back). Component identified to be attached to adjacentDC Battery SWGR No. 4.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)Both SEWS and calc. 52233-C-014 identifyfour attachment pointsfor thisswitchboard. The referenced calculation conservatively shows anchor bolt adequacy based onfour bolt pattern.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Sheet ll9 of 439@N/A X X X X X X Sheet 120of439 Paul C. Rizzo Associates,Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-4Equip. Class

14. Distribution Panels Equipment Description l25V DC Bus 4 Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Block wall SB- I -9 has been qualified per IE 80- I I review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) t0lU2012' ,rt't , /...-,t I j.' t' /'/ ': i /t \r,/ F /,'/; Jt*(.'t'Adam L. Helffrich tutU2012 X-mtkldr Evaluated by: Eddie M. Guerra Paul C. Rizzo Associates, [nc.ENGINEERS &. CONST}UTA.YIS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-4 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 4Other supporting or relevant documents and photos (if any):File Name : 2-61 l -zsjpeg

Description:

Component Plate IDFile Name : 2-62-2-l -25jpegDescription: General view of component Sheet of 439 t2l Status: Paul C. Rizzo Assclciates, Inc.EI.NG IN EERS 6. CA)NSLILTAI\iTS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-4 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 4 Sheet122 of 439 Status:File Name: 2-63-2-l -zsjpeg

Description:

View of channel mounting baseFile Name : 2-64-2-l -zsjpeg

Description:

View of back entry conduit Sheet 123 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS &. CONSUUTiillT$ Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-4 Equip. Class 14. Distribution Panels Equipment Descriptionl25V DC Bus 4 Status:File Name: 2-73-2-l -zsjpeg

Description:

General view of inside of component File Name: 2-94-2-l -2sjpegDescription: View of anchorage detail taken from the back 124 of 439Paul C. Rizzo Associates, Inc.ENGINE ERs S. CONSI.JLTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DC-SWBDI-4 Equip. Class 14. Distribution Panels Equipment Descriptionl25Y DC Bus 4 Status: File Name : 2-95-2-l -zsjpeg

Description:

View of base detail for braker section Sheet 125 of439 Paul C. Rizzo Associates, Inc. ENCINEERS {i{ CONSULTA.lTTS Seismic Walkdown Checklist (SWC)Equipment ID No. EE-P-lAEquip. Class 5. Horizontal Pumps@Equipment Description Location: Bldg. DGBX Diesel Generator Fuel Oil Transfer Pump Floor El.735 Manufacturer. Model. Etc. Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50%o of SWEL items requiring such verification)? Small pump anchored to concrete padwith 4-l/2" diam anchor bolts with adequate edge distance.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors? Some minor craclrs noticed on concrete pad and judged acceptable.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.) Anchorage verified per document 52233-C-007 Anchorage Calc

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X BCe Paul c. Rizzo Associates, Inc.Ei{GINEERS & CONSI.:LTAr\TS Seismic Walkdown Checklist (SWC)Equipment ID No. EE-P-lA Equip. Class 5. Horizontal Pumps Equipment Description Diesel Generator Fuel Oil Transfer Pump Sheet 126 of 439 Status:@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Nozzles are identified to be well supported.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)Evaluated by: Eddie M. Guerra tulU20l2., ,i ,,: ,/'t /,Ilr:tyt' i',!,i,*;'/ Adam L. Helffrich tulU20r2 X Sheet 127 of 439 Paul C. Rizzo Associates, Inc.ENGIN EERS {i{ CONST}LTA.\TS Seismic Walkdown Checklist (SWC)Status:@U N Equipment ID No. EE-P-IA Equipment Description Equip. Class 5. Horizontal Pumps Diesel Generator Fuel Oil Transfer PumpOther supporting or relevant documents and photos (if any):File Name

2 I - l-z}jpeg

Description:

Component Plate ID File Name : 2-62-l -l -2}jpeg

Description:

General view of component Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC)Status:@Sheet 128 of 439 U Equipment ID No. EE-P-IA Equipment Description Equip. Class 5. Horizontal Pumps Diesel Generator Fuel Oil Transfer Pump File Name: 2-63-l-l-20 jpeg

Description:

View of component anchroage configuration BCe Paul c. Rizzo Associates, [nc.Seismic Walkdown Checklist (SWC)Equipment ID No. EE-TK-2A Equip. Class 21. Tanks and Heat ExchangersEquipment DescriptionEE-EG-I Fuel Oil Day Tank Location: Bldg. DGBXFloor El.735Manufacturer. Model. Etc. Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)? Tank is mounted on braced steel framing (HSS4x4x I /4). Each offour posts are anchoredwith 4-1" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)Anchorage configuration confirmed by Drawing RS-0019Q

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Sheet 129 of439@X X X X X X Sheet 130 of439 Paul C. Rizzo Associates, Inc. EI'GINE ERS {i. CSNSTJLTA-\TS Seismic Walkdown Checklist (SWC)Equipment ID No. EE-TK-2AEquip. Class 2l. Tanks and Heat Exchangers Equipment Description EE-EG-I Fuel Oil Dav Tank Status:@Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

Attached piping are rigidly supported.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerua r0lU2012J ,' /., i /r: ;,,'t/ t"'t*/"'/'Adam L. Helffrich t0lU20t2 X Sheet 13l of 439Paul C. Rizzo Associates, Inc.ENGMM&SNSUTAS Seismic Walkdown Checklist (SWC)Equipment ID No. EE-TK-2A Equip. Class 21. Tanks and Heat Exchangers Equipment DescriptionEE-EG-I Fuel Oil Day TankOther supporting or relevant documents and photos (if any):File Name: 2-61-2-l -20 jpeg

Description:

Component Plate IDFile Name: 2-62-2-l-20 jpeg

Description:

General view of component Status:@2-62-2-l -20 jpeg Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. EE-TK-ZA Status: Equip. Class 21. Tanks and Heat Exchangers @Sheet 132 of 439 UEquipment Description EE-EG-I Fuel Oil Day Tank File Name: 2-63-2-l-2Ojpeg

== Description:==

View of component anchorage PCePaul c. Rizzo Ass*ciates, lnc. Seismic Walkdown Checklist (SWC)Equipment ID No. FCV-lCH-l l3,{ Equip. Class 7. Pneumatic-Operated ValveEquipment Description Boric Acid to Blender FCV Location: Bldg. AXLBFloor El.722Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Light weight valve mounted on a I I/2" diam line.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yo for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Sheet 133 of 439@X X X X X X Sheet 134 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FCV-lCH-l l3,{ Equip. Class 7. Pneumatic-Operated ValveEquipment DescriptionBoric Acid to Blender FCV Status:@Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attache d line s found w ith adequate fl exibil ity.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guena tDlU20l2,, '/.,,,/,r'.'l/ "i "y'i/'rAdam L. Helffrich t0lU20l2 X Sheet135 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FCV-ICH-I l3A Equip. Class 7. Pneumatic-Operated Valve Equipment Description Boric Acid to Blender FCVOther supporting or relevant documents and photos (if any): File Name : 2-61 l -12 4pegDescription: Component Plate IDFile Name: 2-62-2-l -lzj pegDescription: General view of component Status: 2-62-2-l -lzj peg PC? Paul C. Rizzo Ass*ciates, Inc.E.-CINEERS & CONSI)LTA}iTS Seismic Walkdown Checklist (SWC)Equipment ID No. FCV-lFW-1038 Equip.Equipment Description Location: Bldg. SFGBSheet 136 of 439@Class7. Pneumatic-Operated Valve 38 AFW Pu RecircControl Valve Floor El.735 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1.Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)? Small AOV on -3" line well supported andfound in good condition.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorase free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X PCe Paul c. Rizzo Assnciates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FCV-1FW-1038 Equip. Class

7. Pneumatic-Operated Valve Equipment Description 38 AFW Pump Recirc Control Valve Sheet 137 of439 Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

[0. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? N/A X X X X Other Adverse Conditions I l. Have you looked for and adversely affect the safetyfound no other seismic conditions that couldfunctions of the equipment? Comments (Additional pages may be added as necessary) Evaluated Eddie M. Guerua r0lU20l2 t, l,'.a / .:. .i ,/,', ,, lt, t .rr/ i+' /i12.t "i.'/'Adam L. Helffrich r0lU20r2 X 138 of 439 Paul C. Rizzo Associate$, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FCV-IFW-1038 Equip. Class 7. Pneumatic-Operated Valve Equipment DescriptionOther supporting or relevant documents and photos (if any):File Name: 2-61-l-l-50jpegDescription: Component Plate IDFile Name: 2-62-l -l -sOjpegDescription: General view of component Sheet 38 AFW Pump Recirc Control Valve Sheet 139 of 439 Paul C. Rizzo Associates, Inc. IT,LTNTBSeismic Walkdown Checklist (SWC)Equipment ID No. FCV-IFW-IO3B Equip. Class 7. Pneumatic-Operated ValveEquipment Description 38 AFW Pump Recirc Control Valve File Name: 2-63-l -l -50jpeg

Description:

View of flexible attached lines Sheet 140 of 439Paul C. Rizzo Associates, Inc. ENGINEERS {K CONSL:UTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. FW-59 Status:Equip. Class 0D. Other-Check Valve or Manual ValveCommon Lube Oil Coolers 3-wav Manual Valve @Equipment Description Location: Bldg. SFGBFloor El.735Manufacturer. Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?Mounted on q -2 I/2" diam line with adequate support configuration.2.Isthe anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X PCe Paul c. Rizzo Associates, [nc.E.T\GINEERS & CONSI. iLTA,\TTS Seismic Walkdown Checklist (SWC)Equipment ID No. FW-59 Equipment DescriptionCommon Lube Oil Coolers 3-wav Manual Valve Sheet l4l of 439 Status:Equip. Class 0D. Other-Check Valve or Manual Valve@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Nearby temporary scaffold identified to be well restrained.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X XOther Adverse Conditions1 l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)Evaluated bv: Eddie M. Guerua t0tU20t2 I .,.'.t / i.,' /,i, , :, /ti.,,,r/' / " r /'//t(aAdam L. Helffrich runt20r2 X of 439 Paul C. Rizzo Associates, Inc. t.)\GlN EF_RS {k CONSl" iUrA.\TS Seismic Walkdown Checklist (SWC)Equipment ID No. FW-59 Status: Equip. Class 0D. Other-Check Valve or Manual ValveEquipment DescriptionCommon Lube Oil Coolers 3-way Manual ValveOther supporting or relevant documents and photos (if any): File Name: 2-61 I -50 jpeg

Description:

Component Plate IDFile Name: 2-62 I -50 jpeg

Description:

General view of component 2-62-8-l -50 jpeg Sheet 143 of439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-2Equip. Class 5. Horizontal Pumps@Equipment Description Location: Bldg. SFGBTurbine Driven PumpFloor El.73sManufacturer. Model. Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments. Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)? Mounted on skid and anchoredwith 8-3/4" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is oxidation?more than mild surface4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%6 forwhich an anchorage configuration verification is required.) Anchorage verified per drawing 08700-02.040-0005, Rev. E.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? X X X X X X PC? Paul C. Rizzo Associates, Inc" ENGINEERS & CONSI.;LTA,\TS Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-2 Equip. Class 5. Horizontal Pumps Equipment DescriptionTurbine Driven PumpSheet 144 of 439 Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached pie lines are adequately supported.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) t0tU20t2/. ./.'J L. , ./," lfu .:,rt' / /:/r/:'(/'Adam L. Helffrich t0lu2012 XEvaluated by:Eddie M. Guerra Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-2 Equip. Class 5. Horizontal Pumps Status:@Sheet 145 of 439 UEquipment Description Turbine Driven PumpOther supporting or relevant documents and photos (if any): File Name: 2-61 I -SOjpeg

Description:

Component Plate IDFile Name: 2-62-3-l -50jpeg

Description:

General view of component Sheet 146 of 439 Paul C. Rizzo Associates, Inc.ENG INF-ERS &. CONSTJLTA"\fl S Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-2Equip. Class

5. Horizontal PumpsEquipment Description Turbine Driven PumpDescription: View of component anchorage configurationFile Name: 2-73-3-l

-50 jpegDescription: View of attached pipe lines Status:@File Name: 2-64-3-l -50 jpeg Sheet 147 of439 Paul C. Rizzo Associates, Inc. EI$GINEERS Si CON$ULTA"\TSSeismic Walkdown Checklist (SWC)Equipment ID No. FW-P-3A Equip. Class 5. HorizontalPumpsEquipment DescriptionNO. 34. Motor Driven Auxiliary Feedwater Pump Location: Bldg. SFGBFloor El. 735Manufacturer, Model. Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?Mounted on skid and anchoredwith 8-3/4" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware? @3. Is the anchorage free oxidation?of corrosion that is more than mild surface N/A N/A4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yoforwhich an anchorage configuration verification is required.)Anchorage verified per drowing 02.040-001 I B and 8700-RC-2 I M. (see also calc.

s2233-C-007).

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X PCe *xi#,',H:,".:,*::"' r "t"" r,, *Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-3A Equip. Class 5. Horizontal PumpsEquipment DescriptionNO. 34, Motor Driven Auxiliary Feedwater PumpSheet 148 of 439Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra: t ,i ., ,/, "/, u{r:.r,.//' 4' t /"t"'+(Adam L. Helffrich Date: Date: r0tU20t2 t0nt20r2 X Sheet 149 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CCINSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-3A Equip. Class 5. Horizontal Pumps Equipment Description NO. 34, Motor Driven Auxiliary Feedwater PumpOther supporting or relevant documents and photos (if any): File Name: 2-61-4-l-50jpegDescription: Component Plate IDFile Name: 2-62-4-l -50jpeg

Description:

General view of component Sheet 150 of 439 Paul C. Rizzo Associates, Inc.ENG INEER:} &. COT.I.CT}LTANT$ Seismic Walkdown Checklist (SWC)Equipment ID No. FW-P-3A Equipment Description Equip. Class 5. Horizontal PumpsNO. 34, Motor Driven Auxiliary Feedwater PumFile Name: 2-63-4-l -50jpeg

Description:

View of component anchorage configuration PCe Paul c. Rizzo Associates, Inc. ENGINEERS & CONSULTA"\TSSeismic Walkdown Checklist (SWC)Equipment ID No. FW-T-2 Equip. Class

5. Horizontal Pumps Equipment DescriptionAux Feed Pump Steam Terry Turbine Sheet l5l of439@Location: Bldg.

SFGB Manufacturer, Model, Etc.Floor El. 735 Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)? Mounted on same skid as FW-P-? pump. Skid anchored with 8-3/4" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A NiA X X X X X X PCe Paul c. Rizzo Associates, Inc.

  • NGTNEERS

& CONSULTA"\Ts Seismic Walkdown Checklist (SWC)Equipment ID No. FW-T-2Equipment DescriptionAux Feed Pump Steam Terry Turbine Sheet Equip. Class 5. Horizontal Pumps Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI I. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv: Fm&/"#r Eddie M. Guerrai , /., r{i',.'ti ri' r'/"L "riAdam L. Helffrich X of 439 N/A N/A N/A t0lll20l2 r0lU20r2 Paul C. Rizzo Associates, Inc.ENGINEERS & CONST]LTA"\'TS Seismic Walkdown Checklist (SWC)Equipment ID No. FW-T-2Equip. Class

5. Horizontal Pumps Equipment Description Aux Feed Pump Steam Terry TurbineOther supporting or relevant documents and photos (if any):File Name:

2-61-5-l -50jpeg

Description:

Component Plate IDFile Name : 2-62 I -50jpegDescription: General view of component Sheet I 53 of 439 Status: Sheet 154 of439 Paul C. Rizzo Associates, [nc.RS& CONSL;LTAi\TS Seismic Walkdown Checklist (SWC)Equipment ID No. HCV-ICH-186 Equip. Class 7. Pneumatic-Operated Valve oEquipment Description Location: Bldg. AXLBRCP Seal SUP Hand CONTFloor El. 722 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50%o of SWEL items requiring such verification)?Valve mounted on well supported 4" diam line. Yoke supported to wall and piping issupported back to same wall.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A X X X X X X of 439 Paul C. Rizzo Associates, Inc.RS 6. CONSIiLTA"\TS Seismic Walkdown Checklist (SWC)Equipment ID No. HCV-ICH-I86 Equip. Class

7. Pneumatic-Operated Valve Equipment Description RCP Seal SUP Hand CONTInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra ., i . ./,:, lt:,,?'

  • + r'12t rtAdam L. Helffrich Date: Date: X Sheet 155 t0tU20t2 tLly20l2 Sheet 156 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. HCV-ICH-186 Equip. Class
7. Pneumatic-Operated Valve Equipment Description RCP Seal SUP Hand CONT Other supporting or relevant documents and photos (if any):File Name:

2-61-l -l -l2.1peg

== Description:==

Component Plate IDFile Name: 2-62-l-l-l2trpeg

== Description:==

General view of component Sheet 157 of 439Paul C. Rizzo Associates, Inc. seismicw";;;;(swc) Equipment ID No. INV-VITBUSI-l Equip. Class 16. Battery Chargers and Inverters@Equipment Description Location: Blde. SRVBVital Bus I Inverter Floor El. 713 Manufacturer. Model. Etc. Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e.,of the 50Yo of SWEL items requiring such verification)?6-5/8" diam anchors identifiedfor anchoroge configuration identified betw een adj acent panels.is the item one. Adequate separation2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion oxidation?that is more than mild surface4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%o forwhich an anchorage configuration verification is required.) Drawing RE-0038D confirms anchorage configuration. (see also calc. 52233-C-017).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? N/A X X X X X X Sheet 158 of439 Paul C. Rizzo Associates, [nc.EI*GINEERS $. CoNSLILTA;\TSSeismic Walkdown Checklist (SWC)Equipment ID No. INV-VITBUSI-l Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionVital Bus I InverterInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached conduits identified with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI 1 Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: t0/U2012 / t ," ..', .,/" Jir::1q/ rr'r{.i,"(l Adam L. Helffrich t0tU20t2 X 159 of 439Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC) Status: Equipment ID No. INV-VITBUSI-I Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionVital Bus I InverterOther supporting or relevant documents and photos (if any): File Name: 2-61-8-l -25SpegDescription: Component Plate IDFile Name: 2-62-8-l-25jpegDescription: General view of component 160 of 439 Paul C. Rizzo Associates, Lnc.h*GINEEP$ & coNst[TANf S Seismic Walkdown Checklist (SWC) Status:Equipment ID No. INV-VITBUSI-I Equip. Class 16. Battery Chargers and Inverters Equipment Description Vital Bus I InverterFile Name: 2-63-8-l-25jpeg

== Description:== View of top entry conduitsFile Name i 2-64-8-l-25jpegDescription: View of anchorage configuration Sheet 16l of 439Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUTTAS Seismic Walkdown Checktist (SWC) Status: Equipment ID No. INV-VITBUSI-l Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionVital Bus I InverterFile Name : 2-7 3-8-l -zsjpeg

Description:

Front view of base anchorage configuration @ Sheet 162of439 Paul C. Rizzo Associates, Inc, E!$CINEERS 6r CrJNSI.}LTA}iTS Seismic Walkdown Checklist (SWC)Status:@Equipment ID No. INV-VITBUSl-3 Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionVital Bus III lnverter Location: Bldg. SRVBFloor El. 713 Manufacturer. Model. Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50%o of SWEL items requiring such verification)? Attached to support base with 6-5/8"diam machine bolts. Support base anchored to concrete with B-3/4" onchors Around 10" separation identified with adjacent panels.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.) Drawing RE-00388 confirms anchorage configuration. (see also calc. 52233-C-017).

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

NiA X X X X X X PC" Paul c. Rizzo Associates, Inc.ENGINI.E&S & CONSULTT\TSSeismic Walkdown Checklist (SWC)Equipment ID No. INV-VITBUSI-3 Equip. Class 16.Battery Chargers andEquipment DescriptionVital Bus III Inverter of 439 Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Blockwall SB-l-15 has been qualified per IE 80-l I review.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by:M. Guerra', ,' , ,, /', t /+':'1r' t:;' l1.i;';tlt Adam L. Helffrich Sheet 163 Inverters N/A t0tv20l2 tOlt/2012 X Paul C. Rizzo Associates, Inc. Seismic Walkdown Checklist (SWC) Status:Equipment ID No. INV-VITBUSI-3 Equip. Class 16. Battery Chargers and Inverters Equipment Description Vital Bus III InverterOther supporting or relevant documents and photos (if any):File Name: 2-61-6-l -25 trpeg

Description:

Component Plate ID File Name: 2-62-6-l -zsjpeg

Description:

General view of component N@Sheet 164 of 439 U Sheet 165 of 439 Paul C. Rizzo As.sociates, Inc.Ii-GINEERS & CONST ILTtuV SSeismic Walkdown Checklist (SWC) Status:Equipment ID No. INV-VITBUSl-3 Equip. Class 16. Battery Chargers and Inverters Equipment Description Vital Bus III InverterFile Name

2-63-6-l -25j pegDescription: Front view of base anchorage configurationFile Name : 2-64-6-l

-25jpegDescription: Close up view of anchorage detail Sheet 166 of 439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC) Status: Equipment ID No. INV-VITBUSI-3 Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionVital Bus III InverterFile Name: 2-73-6-l -zsjpeg

Description:

View of weld detail on channel mounting baseFile Name: 2-94-6-l -zsjpegDescription: General view of base configuration U N@ PCe Paul c. Rizzo Associates, lnc.Seismic Walkdown Checklist (SWC)Equipment ID No. INV-VITBUSl-4 Equip. Class 16. Battery Chargers and InvertersEquipment Description Vital Bus I'VE InverterLocation: Blde. SRVB Floor El. 713Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel.Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?Attached to support base with 6-5/8"diam machine bolts. Support base anchored to concrete with 8-3/4" enchors. Around 10" separation identifiedwith adjacent panels.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.) Drawing RE-00388 confirms anchorage configuration. (see olso calc. 52233-C-017).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? Sheet 167 of439@N/A N/A X X X X X X Sheet 168 of439Paul C. Rizzo Associates, [nc. ENCTNEERS {i. CONST"}TTA}iTS Seismic Walkdown Checklist (SWC)Equipment ID No. INV-VITBUSI-4 Equip. Class 16. Battery Chargers and InvertersEquipment DescriptionVital Bus I'VE InverterInteraction Effects 7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Blockwall SB-l-9 has been qualified per IE 80-l I review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?NiA X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerra r0lU20l2' .: ,,,.r i' ,^.; ,/t:, l,':,',.y' ti' t t ;{hftf llAdam L. Helffrich t0lU20r2 X Sheet 169 of 439 Paul C. Rizzo Associate$, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. INV-VITBUSI'4 Equip. Class 16. Battery Chargers and Inverters Equipment Description Vital Bus I'VE InverterOther supporting or relevant documents and photos (if any):File Name: 2-61-2-l -26 SpegDescription: Component Plate IDFile Name: 2-62-2-l-26 Speg

Description:

General view of component@2-62-2-l-26Speg Sheet 170 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUNNIS Seismic Walkdown Checklist (SWC) Status: Equipment ID No. INV-VITBUSI-4 Equip. Class 16. Battery Chargers and Inverters Equipment DescriptionVital Bus I'VE InverterFile Name: 2-64-2-l-26 Speg

Description:

Front view of base anchorage configuration @File Name: 2-63-2-l -26 SpegDescription: View of top entry conduits Sheet Paul C. Rizzo As.sociates, Inc.EN(;lNEhRS .s. C0NSIILTA:fI S Seismic Walkdown Checklist (SWC)Equipment ID No. INV-VITBUS I -4 Equip. Class16. Battery Chargers and Inverters Status: Equipment DescriptionVital Bus I'VE Inverter 17l of 439File Name:

== Description:==

2-73-2-l -26 jpesClose up view of anchorage detail.qFi le Name : 2-94-2-l -26j peg

Description:

View of weld detail on channel mounting base PC? Paul c. Rizzo Associates, [nc.Seismicw"r;;;(swc) Equipment ID No. LS-l-EE-201-l Equip. Class 18. Instrument (on) Racks Sheet 172of439 Status:@Equipment DescriptionEE-EG-I Day Tank Level (Pump CTRL) Level SwitchLocation: Bldg. DGBXFloor El.735Manufacturer. Model. Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50%o of SWEL items requiring such verification)? Rigidly attached to top of EE-TK-2A tank.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X pC? Paul C. Rizzo Associates, Inc.ENCINEERS & CONSI}LTA}{TS Seismic Walkdown Checklist (SWC)Equipment ID No. LS-l-EE-201-l Equip.Class 18. Instrument (on) Racks Equipment Description EE-EG-I Day Tank Level (Pump CTRL) Level SwitchSheet 173 of 439 Status:@Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra"tl f t0lU20r2.',t /' !,,, l' " ,, /n't'"t/ lt r'/i/(1Adam L. Helffrich t0lv20r2 X Paul C. Rizzo Associates, Inc.F I..( ;l N F L RS S C:t) rr*St

L[A-\"I S Seismic Walkdown Checklist (SWC)Equipment ID No. LS-l-EE-201-l Equip. Class18. Instrument (on) Racks Equipment Description EE-EG-I Day Tank Level (Pump CTRL) Level SwitchOther supporting or relevant documents and photos (if any)
File Name:

2-61 l-20jpeg

Description:

Component Plate IDFile Name : 2-62-3-l -20jpegDescription: General view of component Sheet 17 4 of 439 Status: pceSeismic Walkdown Checklist (SWC)Equipment ID No. LT-1QS-100A Equip. Class 18. Instrument (on) RacksSheet 175 of439 Status:@U N Equipment DescriptionRWST Level TransmitterLocation: Bldg. YARDFloor El. 735 Manufacturer, Model. Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1 Is the anchorage configuration verification required (i.e., is the item one of the 50o/a of SWEL items requiring such verification)?Mounted on short cantilever support (-12") made of HSS 2 I/2" x 3" x I/4". Support isattached to concrete wall surounding the tankwith 4-l/2" diam anchor bolts.Equipment brackets are welded to the support structure.2. Is the anchorage free of bent, broken, missing or loose hardware?N Y U N Y N N Y N Y N/A3. Is the anchorage free of corrosion that oxidation? Some signs of of rust visible on brackets. is more than mild surfaceJudged not a concern. N/A U N/A U N/A4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question pnly applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

U N Y X X X X X X PCe Paul c. Rizzo Associates, lnc. Seismic Walkdown Checklist (SWC)Equipment ID No. LT-IQS-100A Equip. Class 18. Instrument (on) Racks Equipment DescriptionRWST Level Transmitter Sheet 176 of439@Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A N/A X X X X Other Adverse ConditionsI l Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerra t0lr/2012 rOtr/2012 X Sheet 177 of 439Paul C. Rizzo Associate$, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. LT-lgS-]00A Equip. Class 18. Instrument (on) Racks Equipment Description RWST Level TransmifferOther supporting or relevant documents and photos (if any): File Name: 2 I - I -09jpeg

Description:

Component Plate IDFile Name: 2-62-l - I -09jpegDescription: General view of component Status:@2-62-l-l-09jpeg Sheet 178 of439Paul C. Rizzo Associates, Inc.EN(;INEERS Si. CONSIjLTA"\TS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El Status:@Equip. Class l. Motor Control CenterEquipment Description480V Motor Comtrol Center Fed From 480V Substation l-8 Emergency Bus vi 8N7 Location: Blde. INTSFloor El. 705Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)? 3 Section MCC, each section's base channel is welded to embed steel with at least an average of 5 1/2" of 1/4" welds.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?Portion of concrete cover on the embed steel is exposedbut judged adequate as the load path of the embed steel does not require this cover to be effective.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)

Base weld detail in MCC-l-El verified per Calculation 52233-C-001 Anchorage Calc

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X PC? Paul c. Rizzo Associates, Inc.E}iGINEERS & CONSULTA-\TSSeismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El Equip. Class l. Motor Control Center Sheet 179 of 439 Status:@Equipment Description 480V Motor Comtrol Center Fed From 480V Substation 1-8 Emergency Bus via 1NBKR 8N7Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

Minimal top restraint provided by top entry conduit.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by:Eddie M. Guerra t0lU20l2l : /, ,',, 1 .i,, tr': t {+': i'// rS' t r;r!.I,r:1.(/ Adam L. Helffrich t0ly20t2 X Paul C. Rizzo Associates, Inc.ENGTNEERS & CT}NST}LTAhITS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-El Equip. Class l. Motor Control Center Status:@Sheet 180 of 439 U Equipment Description 480V Motor Comtrol Center Fed From 480V Substation l-8 Emergency Bus via INBKR 8N7Other supporting or relevant documents and photos (ifany):File Name: 2-61-l-l -27.1peg

Description:

Component Plate IDFile Name: 2-62-l-l-27 jpeg

Description:

General view of component Paul C. Rizzo Associates, Inc.EITlGINEERS & CONSULTAITTTS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El Equip. Class l. Motor Control Center Status:@Sheet l8l of 439 U Equipment Description 480V Motor Comtrol Center Fed From 480V Substation l-8 Emergency Bus via INBKR 8N7File Name: 2-63-l-l-27 jpeg

Description:

View of spalled concrete at base of MCCFile Name: 2-64-l-l-27 jpeg

Description:

View of top entry conduits Sheet 182 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSI,'UTfu\TS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El2 Equip. Class l. Motor Control Center Status:@Equipment Description Location: Blde. SFGB Motor Control Center Floor El.735Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1.Is the anchorage configuration verification required (i.e., is the item one of the 50Yo of SWEL items requiring such verification)? MCC composed of 4 sections. Each section welded to embed with an qverage of 4 1/2" of I/4" fillet welds, front and back.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)Base weld detail in MCC-1-EI2 verified per Calculation 52233-C-001 Anchorage Calc 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A NiA N/A X X X X X X PCe Paul c. Rizzo Associates, Inc.EN(;INEERS & CONSI.;L'TAJ.{TS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El2 Equip. Classl. Motor Control Center Equipment Description Motor Control Center Sheet 183 of439@Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?A mostly rod hung cable tray (wilh minimal lateral supports) has a gap of about 4" to MCC-l -86 and MCC-L-812. Conservative displacement calculation showed that the available gap is adequote to preclude interaction of the tray with these MCC's.
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated bv:Eddie M. Guema r0llt20t2 i ,' /. '",.'"/ ,r .i., ,' .,/.r ,:, /+,:,.,1/.r, 4,/ {' - i77(//Adam L. Helffrich t0lll20t2 X Sheet 184 of 439Paul C. Rizzo Associatec, Inc. Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-Elz Equip. Class l. Motor Control Center Equipment Description Motor Control CenterOther supporting or relevant documents and photos (if any):File Name: 2-61-3-l -23.1peg

Description:

Component Plate ID File Name: 2-62-3-l -z3jpeg

Description:

General view of component Status:@U N Paul C. Rizzo Associates, Inc. ENGINEERS S( CONSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC- l-El2 Equip. Class I . Motor Control Center Equipment Description Motor Control Center File Name : 2-63-3-l -z3jpeg

Description:

View of top entry conduits Status:@Sheet I 85 of 439 U's 2-64-3-t-23jpegView of MCC embeddment and stitch weld detail PCe Paul c. Rizzo Ass*ciates, [nc.Sheet 186 of439 Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El3 Equip. Class l. Motor Control Center Equipment Description480V Motor Control Center Fed From 480V Substation l-8 Bus lN Location: Bldg.SFGB Floor El.756Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50%o of SWEL items requiring such verification)?MCC composed of 3 sections. Sill channel welded to HSS 4x6 which in turn is welded to embed steel. Each section of MCC has an average of 4" of I /4" welds at front and back. The HSS 4x6 is welded to embedwith -3" @ 7" stitch of l/4" fillet welds, frontand back.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)Base weld detail in MCC-1-EI3 verified per Calculation 52233-C-002 Anchorage Calc 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

@N/A N/A X X X X X X PCe Paul c' Rizzo Associates, Inc'ENCINEERS &. C{)NSUITANTSSeismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-813 Equip. Class l. Motor Control Center Sheet 187 of 439 Status:@Equipment Description480V Motor Control Center Fed From 480V Substation 1-8 Bus lNInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?

Top e ntry c onduit found with adequate fl exibi lily.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra 10lll20l2 .t/" ,' ; /', ,r/,i.:.'/' d r;{'L"t.'t' Adam L. Helffrich X t0lU20l2 Sheet 188 of 439Paul C. Rizzo Associates, Inc.ENGIN EERS &. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El3 Equip. Class l. Motor Control Center Status:@Equipment Description480V Motor Control Center Fed From 480V Substation l-8 Bus lN Other supporting or relevant documents and photos (if any):File Name: 2-61-9-l -32Speg

Description:

Component Plate ID File Name: 2-62-9-l-32 jpegDescription: General view of component U N Paul C. Rizzo Associates, Inc.ENGINEERS & CONSWTAI\TTS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-El3 Equip. Class l. Motor Control Center Status:@Sheet 189 of 439 U Equipment Description480V Motor Control Center Fed From 480V Substation l-8 Bus lN File Name: 2-63-9-l -32.1pegDescription: View of MCC base stitch weld detailFile Name: 2-64-9-l -32.1peg

Description:

General view of tube section member used for MCC base Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. MCC- I -E I 3 Equip. Class I . Motor Control Center Status:@Sheet 190 of 439 U Equipment Description480V Motor Control Center Fed From 480V Substation l-8 Bus lNFile Name: 2-73-9-l -32 SpegDescription: General view of MCC base configurationFile Name: 2-94-9-l -32 SpegDescription: View of flexible affached lines Sheet l9l of439 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-l-E4 Equip. Class L Motor Control Center Equipment Description480V Motor Control Center Fed From 480V Substation l-9 Bus lP (9P9)Location: Blde. AXLB Floor El.735Manufacturer, Model, Etc. Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?MCC composed of 5 sections. MCC base channel is welded to embed steel with an average of -5" of I/4" weld at front of each MCC section. The weld on the back cannot be verified since MCC is too close to wall. Typically MCCs that are too closeto awall have their rear mounting channels welded to embed steel by welding thechannelflange that is inside the MCC (as opposed to theflange outside of the I,ICC and closer to the wall). For this MCC the base of the unit could not be accessed and presense o the backwelds was not verified.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

@X X X X X X PCe Paul C. Rizzo Associates, [nc. Er-GINEERS & C(}NSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-E4 Equip. Class 1 Motor Control Center Equipment Description480V Motor Control Center Fed From 480V Substation l-9 Bus lP (9P9)Sheet 192of439@Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?12" tray rod hung is far enough not to interact with top entry conduit.
9. Do attached lines have adequate flexibility to avoid damage?Many 4" diam conduits at top are braced back to the wall behind which would eliminate potential banging of the MCC to the backwall.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse Conditions 1l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra t0n/2012: t /+':.:.7r/ i "'{' j'nt Adam L. Helffrich tOlv20l2 X Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. MCC- l-F.4 Equip. Class l. Motor Control Center Status: @Equipment Description 480V Motor Control Center Fed From 480V Substation l-9 Bus lP (9P9)Other supporting or relevant documents and photos (if any):File Name: 2-61-l-l -47.1pe9

Description:

Component Plate ID Sheet 193 of 439 UFile Name: 2-62-l-l-47 jpeg

Description:

General view of component Sheet 194 of 439 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSI.}LTANT$ Seismic Walkdown Checklist (SWC)Equipment ID No. MCC- l-F4 Equip. Class I . Motor Control Center Status:@U N Equipment Description480V Motor Control Center Fed From 480V Substation l-9 Bus lP (9P9)File Name: 2-63-l-l-47 jpeg

Description:

View of top entry conduits File Name: 2-64-l-l-47 jpegDescription: View of MCC embeddment and stitch weld detail PCe Paul c. Rizzo Associates, Inc. ENGINEERS {I. CONSTiLTA-\TS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-E6 Equip. Class l. Motor Control Center Equipment Description 480V Motor Control Center Fed From 480V Substation l-9 Bus lP(9P14)Sheet 195 of 439@Location: Bldg. SFGB Manufacturer, Model, Etc.Floor El.73s Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?MCC composed of I7 sections. Each sectionwelded to embedwith an average of 4.5" of l/4" fillet welds, front and back.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Vo forwhich an anchorage configuration verification is required.)Base weld detail in MCC-l-E6 verified per Calculation 52233-C-001 Anchorage Calc
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

NiA N/A X X X X X X PCe Pau[ c. Rizzo Associatesn lnc.Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-E6 Equip. Class l. Motor Control Center Equipment Description 480V Motor Control Center Fed From 480V Substation l-9 Bus lP(9P14)Sheet 196 of 439@Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?A mostly rod hung cable tray (wilh minimal lateral supports) has a gap of about 4" toMCC-l-86 and MCC-l-812. Conservative displacement calculation showed that the available gap is adequate to preclude interaction of the tray with these MCC's.9. Do attached lines have adequate flexibility to avoid damage?

Top entry conduit found to be braced back to the wall.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse Conditions I l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated bv:Eddie M. Guera r0/l/2012. /..'r / i t ./.t r, /4",.1r"' tr t, {.i/:+itAdam L. Helffrich 101U2012 X Paul C. Rizzo Associates, Inc.ENGII\TEERS &. CCINSWTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-E6 Equip. Class l. Motor Control Center Status:@Sheet 197 of 439 U Equipment Description480V Motor Control Center Fed From 480V Substation 1-9 Bus 1P(9P14) Other supporting or relevant documents and photos (if any): File Name: 2-61 l -23.1peg

== Description:==

Component Plate ID File Name: 2-62-2-l -z3jpeg

Description:

General view of component Paul C. Rizzo Associatee, Inc. Seismic \ilalkdown Checklist (SWC)Equipment ID No. MCC-I-E6 Equip. Class l. Motor Control Center Status: @Equipment Description 480V Motor Control Center Fed From 480V Substation 1-9 Bus lP(9P14)File Name: 2-63-2-l -23jpegDescription: View of MCC embeddment and stitch weld detail Sheet 198 of 439 UFile Name: 2-64-2-l -23jpeg

Description:

View of top entry conduits Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-E6 Equip. Class l. Motor Control Center Status:@Sheet 199 of 439 UEquipment Description480V Motor Conhol Center Fed From 480V Subttation l-9 But lP(9P14)File Name: 2-7 3-2-l -23jpegDescription: View of openned cabinet sectionFile Name : 2-94-2-l -z3jpeg

Description:

Welded detail taken from front of MCC Paul C. Rizzo Associates, I,nc.Seismic Walkdown Checklist (SWC)Equipment ID No. MCC-I-E6 Equip. Class l. Motor Control CenterEquipment Description @Sheet 200 of 439 U ftatus:480V Motor Control Center Fed From 480V Substation File Name: 2-95-2-l -z3jpeg

Description:

Welded detail taken from back of MCC}}