Application to Amend Licenses DPR-32 & DPR-37,revising Tech Specs to Permit Startup Following Shutdown,W/Reactor Coolant Specific Activity Greater than 1.0 Mci/Cc Dose Equivalent I-131,to Accommodate Possible Iodine Spiking Phenmenon
ML18139B750
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/19/1982
From: LEASBURG R H
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, VARGA S A
Office of Nuclear Reactor Regulation
Shared Package
ML18139B751 List:
References
093, 93, NUDOCS 8202250237
Download: ML18139B750 (2)


Text

. e

  • VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,.

VIRGINIA 23 261 R.ll.LEASBURO VIC:E PRESXD:ENT NucL:EAR OPERATIONS February 19, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

AND o;~:!1:~A~i~:N:~T n;~~3 i i~ 'i< c;;~:~~\r, ) f i')1 PROPOSED TECHNICAL SPECIFICATION CHANGE \-~./ . }~'.f;tt::::

~* *:.~ ,Jt;"~/1 Pursuant to 10CFR50. 90, the Virginia Electric and Power Com " reqtl'ests' 9-n.~ amendment, in the form of changes to the Technical Sped.,J,ic1jltJ<2__~fi..-.--(b;/

Operating Licenses DPR-32 and DPR-37 for the Surry Power Station:""'U,nit*J:'l"g)>:.f>&

2. The proposed changes are enclosed.
  • -*----* The proposed change is to revise Specification 3 .1. D. 3 and 3. 1 Bases, to permit the Surry Power Station to startup following shutdown, with the reactor coolant's specific activity greater than 1.0 µCi/cc DOSE EQUIVALENT I-131, to accommodate the possible iodine spiking phenomenon.

The startup and continued power operation under such conditions within 10 percent of the unit's total yearly operating time has received NRC concurrence for startup as indicated by their approval of its use in the Standarized Technical Specification and also represent the current Technical Specification requirement for continued power operation.

The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.

We have evaluated this request in accordance with the criteria in 10CFR170.22 and it has been determined that a class III license amendment fee is required.

A voucher check in the amount of $4,400. is enclosed in payment of the required fee. Attachments:

1. Proposed Technical Specification change 2. Voucher Check No. 9715 for $4,400. cc: Mr. James P. O'Reilly, Regional Administrator Office of Inspection and Enforcement Regi_on II 8202250237 820219 PDR ADOCK 05000290 p .. l;>PR e COMMONWEALTH OF VIRGINIA) ) CITY OF RICHMOND ) -* The foregoing document was acknowledged.before me,_ in and. for the City and ______ _ Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief. -cl Acknowledged before me this / 9 day of 3-~. , 19 ,2.2. . My Commission expires: --)-, 19 2s. Notary Public . (SEAL) .:*.~*,-:::*