ML082460588

From kanterella
Revision as of 09:17, 17 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09
ML082460588
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML082460584 List:
References
Download: ML082460588 (2)


Text

Saint Lucie Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 11:54:37 Report 22 3 PSB1-RP-RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections A ccess Control to Radiologically Significant Areas 09/08/2008 09/12/2008 1, 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 1, 2 7112103 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 1, 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 1, 2 71151-PR01 IP 1 EB3ISI-UNIT 1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/27/2008 10/31/2008 1 7111108P IP 2 EB3SGISI-UNIT 1 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 11/03/2008 11/07/2008 1 7111108P IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 1, 2 2515/172 IP 7 STL TFPI-TRIENNIEL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

01/26/2009 01/30/2009 1, 2 7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

02/09/2009 02/13/2009 1, 2 7111105P IP 1 PSB1EP-EMERGENCY PREPAREDNESS PROTECTION Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 02/09/2009 02/13/2009 1, 2 2515/175 IP EP Baseline Inspection A lert and Notification System Testing 02/09/2009 02/13/2009 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 1, 2 7111405 IP Baseline Inspections Performance Indicator Verification 02/09/2009 02/13/2009 1, 2 71151 IP 1 PSB1-RP-RP OCCUPATIONAL PREINSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 03/30/2009 04/03/2009 1, 2 7112101 IP 2 EB3ISI-UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 2 7111108P IP 1 EB3TI172-TI-172 RCS DM BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 04/27/2009 05/01/2009 2 2515/172 IP 2 PSB1-RP-RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)

Baseline Inspections A ccess Control to Radiologically Significant Areas 04/27/2009 05/01/2009 1, 2 7112101 IP Baseline Inspections A LARA Planning and Controls 04/27/2009 05/01/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 1, 2 7112202 IP Baseline Inspections Performance Indicator Verification 04/27/2009 05/01/2009 1, 2 71151 IP 1 EB3SGISI-UNIT 2 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 2 7111108P IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Saint Lucie Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 11:54:37 Report 22 3 PSB1-RP-RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)

Baseline Inspections A ccess Control to Radiologically Significant Areas 05/11/2009 05/15/2009 1, 2 7112101 IP Baseline Inspections A LARA Planning and Controls 05/11/2009 05/15/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 1, 2 7112202 IP 5 INSP-COMPONENT DESIGN BASIS INSPECTION (CDBI)

Baseline Inspections Component Design Bases Inspection 07/13/2009 07/17/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 07/27/2009 07/31/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 08/10/2009 08/14/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 08/24/2009 08/28/2009 1, 2 7111121 IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 1 V23284 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/05/2009 10/09/2009 1 V23284 3 OL EXAM-INITIAL EXAM - WEEK 2 Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/19/2009 10/23/2009 1 V23284 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009 1, 2 7111111B IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.