ML110880669
ML110880669 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 03/28/2011 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Douet J R Entergy Operations |
References | |
IR-11-004 | |
Download: ML110880669 (5) | |
See also: IR 05000416/2011004
Text
James R. Douet Site Vice President
Operations
Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 UNITED STATES NUCLEAR REGULATORY
COMMISSIOI"..J
REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARliNGTON, TEXAS 76011-4125
March 28, 2011 SUBJECT: GRAND GULF NUCLEAR STATION-NOTIFICATION
OF INSPECTION (INSPECTION
REPORT 05000416/2011004)
AND REQUEST FOR INFORMATION
Dear Mr. Douet: On June 27,2011, the NRC will begin the on-site portion of the Gas Accumulation
Management
in Emergency
Core Cooling, Decay Heat Removal, and Containment
Spray Systems Temporary
Instruction
at your Grand Gulf Nuclear Station. These inspections
will be performed
in accordance
with NRC Temporary'
Instruction (TI) 2515/177.
Experience
has shown that this inspection
is resource intensive, both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources
and to ensure a productive
inspection, we have enclosed a request for documents
needed for this inspection.
The documents
have been divided into two groups. * The first group iists information
necessary
for our initial inspection
scoping and in-office
preparation
activities.
This information
should be separated
by information
request number, especially
if provided electronically (e.g., folder with the information
request number). This information
should be available
to the inspector
no later than June 20, 2011. Upon review of these documents, the inspectors
will select additional
documentation
for review upon arrival. By June 23, 2011, the inspector
will communicate
the initial selected samples. * The second group of documents
requested
is needed to support our onsite inspection
activities.
This set of documents
shouid be avaiiabie
to the inspector
on june 27, 20;;. it is also requested
that corrective
action documents
and responses
to questions
developed
during the inspection
be provided to the inspector
as the documents
are generated.
We have discussed
the schedule for these inspection
activities
with your staff and understand
that our regulatory
contact for this inspection
will be Mike Larson of your licensing
organization.
If there are any questions
about this inspection
or the material requested, please contact the inspector, Wayne Sifre, at 817-860-8193
or by email at
This letter does not contain new or amended information
collection
requirements
subject to the Paperwork
Reduction
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection
requirements
were approved by the Office of Management
and Budget, control number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to,
Operations, Inc. -2 -a request for information
or an information
collection
requirement
unless the requesting
document displays a currently
valid Office of Management
and Budget control number. In accordance
with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure
will be available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at (the Public Electronic
Reading Room). Sincerely, -I.(?(2 Thomas R. Farnholtz, Chief Engineering
Branch 1 Division of Reactor Safety Docket: 50-416 License: NPF-29 Enclosure:
cc w/encl: MANAGEMENT
OF GAS ACCUMULATION
IN EMERGENCY
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT
SPRAY SYSTEMS TEMPORARY
INSTRUCTION
DOCUMENT REQUEST Distribution
via ListServ for Grand Gulf Nuclear Station
MANAGEMENT
OF GAS ACCUMULATION
IN EMERGENCY
CORE COOLING, DECAY Inspection
Report: Inspection
Dates: Inspection
Procedure:
Inspector:
CONTAINMENT
SPRAY SYSTEMS TEMPORARY
INSPECTION
DOCUMENT REQUEST 05000416/2011004
June 27-July 1, 2011 TI 2515/177, "Management
of Gas Accumulation
in Emergency
Core Cooling, Decay Heat Removal, and Containment
Spray Systems" Wayne C. Sifre, Senior Reactor Inspector
(817) 860-8193 The following
information
should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com
or compact disc, preferred), in care of Wayne Sifre, to facilitate
the selection
of specific items that will be reviewed during the onsite inspection
week. The inspector
will select specific items from the information
requested
below and then request from your staff additional
documents
needed during the onsite inspection
weeks. Also, we request that you categorize
the documents
in your response with the numbered list below. Please provide requested
documentation
electronically
if possible.
If requested
documents
are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation
during the first day of the onsite inspection.
If you have any questions
regarding
this information
request, please call the inspector
as soon as possible.
I. Information
Requested
By June 20, 2011 1. List of corrective
action program documents (with a short description)
associated
with GL 2008-01, voids in piping, and pressure transients
for the previous three years. 2. List of changes (with a short description
and tracking number) to the final safety evaluation
report (FSAR), technical
specifications, technical specification
bases, and technical
requirement
manual associated
with the resolution
of GL 2008-01. 3. List of calculations
associated
with GL 2008-01, including
calculations
that have been changed or created in response to GL 2008-01 (with a short description
of the calculation
and the change). 4. List (with a short description)
of gas intrusion
mechanisms
that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations).
5. List of the suction piping sections identified
as susceptible
to gas accumulation (the list should identify the corresponding
system). -1 -Enclosure
MANAGEMENT
ACCUMULATION
IN EMERGENCY
COOLING, DECAY REMOVAL, AND CONTAINMENT
SPRAY SYSTEMS TEMPORARY
INSPECTION
DOCUMENT REQUEST 6. List of the discharge
piping sections identified
as susceptible
to gas accumulation (the list should identify the corresponding
system). 7. Copies of isometric
drawings of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems (hard-copies
are preferred).
8. Copies of piping and instrumentation
diagrams (P&IDs) of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems (hard-copies
are preferred).
9. Copies of program documents
and procedures
developed
to implement
the resolution
of GL 2008-01. 10. List of actions that were completed
in response to GL 2008-01. 11. Copies of the modification
packages for hardware modifications
as part of the resolution
of GL 2008-01. 12. Design basis documents
of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems. 13. Design basis documents
of keep-full
systems of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems. 14. System vvalkdovvn
reports associated
Vvith the resolution
of GL 2008-01. 15. If applicable, provide a list of inaccessible
locations
where plant walkdowns
of the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems have not been completed.
Include an explanation
of why each area is considered
inaccessible.
16. Copies of surveillance
procedures
associated
with the resolution
of GL 2008-01 and the results of the last two surveillances
for the High Pressure Core Spray, Low Pressure Core Spray, and Residual Heat Removal systems. 17. Copies of procedures
used for detecting
and determining
void volumes. 18. Copies of procedures
used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering
evaluations
performed
for all identified
voids. -2 -Enclosure
MANAGEMENT
GAS ACCUMULATION
IN EMERGENCY
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT
SPRAY SYSTEMS DOCUMENT REQUEST 21. Basis for the void acceptance
criteria (e.g. calculation).
If applicable, provide the justification
for any deviation
from the void acceptance
criteria established
by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport
analyses.
23. Copy of vortexing
calculations
associated
with systems under the scope of GL 2008-01. 24. Copies of self-assessments
associated
with the implementation
of the GL 2008-01 program. II. Information
Requested
By June 27, 2011 25. Copies of the selected corrective
action program documents.
26. Copies of the selected licensing
and design basis document changes. 27. Copies of the selected calculations.
28. Copies of training documents
that ensure that personnel
are aware of gas-related
concerns.
?Q r"n;Q'" "f I""rrQI"ti\lQ
imnlQmQntinf"l
nrnl"""r!llr""c:
t:-v * .....,vtJ1""'...., VI VVI 1 __ "-. W -""""...., ... IV' I 1"'" _III III It-',_III_I
.".1 ':::1 f""" _____ * _v. 30. Electronic
copies of the current technical
specifications, technical
specification
bases, final safety analysis report, and technical
report manual. Inspector
Contact Information:
US NRC Region IV LH+n' \I\I",\/no.
Qifro. /\1.1.11.
VVCA]I''
\..,1111"" 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 -3 -Enclosure