Category:Letter
MONTHYEARBVY 24-028, Pre-Notice of Disbursement from Decommissioning Trust2024-10-31031 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-10-30030 October 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust 2024-09-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARBVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization BVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2017-07-20020 July 2017 Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool BVY 17-022, License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 3162017-07-13013 July 2017 License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 316 BVY 17-005, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement2017-02-0909 February 2017 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement BVY 15-040, License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 3112015-06-24024 June 2015 License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 311 BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 BVY 14-062, Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions2014-09-0404 September 2014 Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions BVY 13-109, Cyber Security Plan Implementation Schedule, Proposed Change No. 3082013-12-19019 December 2013 Cyber Security Plan Implementation Schedule, Proposed Change No. 308 BVY 13-097, Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment2013-11-14014 November 2013 Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 12-084, License Amendment Request; Changes to 10CFR50.63 Licensing Basis2012-12-21021 December 2012 License Amendment Request; Changes to 10CFR50.63 Licensing Basis BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-016, License Amendment Request to Revise License Renewal Commitments2012-03-12012 March 2012 License Amendment Request to Revise License Renewal Commitments BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-085, Proposed Change No. 296, Steam Dryer License Condition Change2011-12-22022 December 2011 Proposed Change No. 296, Steam Dryer License Condition Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 10-036, Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan2010-07-16016 July 2010 Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-063, Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change2009-10-27027 October 2009 Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls ML0912001622009-05-31031 May 2009 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station Supplement 1 BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-079, Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications2008-10-31031 October 2008 Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications BVY 08-055, Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes2008-09-30030 September 2008 Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System ML0804202202008-02-0505 February 2008 Vermont Yankee - License Renewal Application, Amendment 35 ML0736502282007-12-11011 December 2007 (PA-LR) VY Response to RAI 4.3.3-2 BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits BVY 07-018, License Renewal Application, Amendment 262007-03-23023 March 2007 License Renewal Application, Amendment 26 ML0702402042007-01-10010 January 2007 Email: (PA-LR) Other Word File ML0701105042007-01-0404 January 2007 Vermont Yankee - License Renewal Application, Amendment 23 ML0634201782006-12-0404 December 2006 2006/12/04-Vermont Yankee Nuclear Power Station, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items ML0634004532006-11-0909 November 2006 2006/11/09-E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 192006-10-31031 October 2006 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19 ML0627801222006-10-12012 October 2006 Summary of a Telephone Conference Call Held on September 19, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc ML0626800342006-09-19019 September 2006 2006/09/19-Vermont Yankee License Renewal Application, Amendment 13 ML0625504392006-09-0505 September 2006 License Renewal Application, Amendment 12 2023-10-10
[Table view] Category:Technical Specification
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications 2015-03-25
[Table view] Category:Amendment
MONTHYEARBVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0535301802005-12-12012 December 2005 Technical Specification Proposed Change No. 266, Revision to Control Rod Operability, Scram Time Testing and Control Rod Accumulators - Response to Request for Additional Information BVY 05-101, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis2005-11-0202 November 2005 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis BVY 05-088, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information2005-09-28028 September 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information BVY 05-086, Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information2005-09-18018 September 2005 Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information ML0524402132005-08-31031 August 2005 Technical Specification Page, Revision to One-Time Extension of Integrated Leak Rate Test Interval ML0508402532005-03-22022 March 2005 Tech Spec Pages for Amendment 222 Regarding Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports ML0505401492005-02-18018 February 2005 Corrected Page 7 to License DPR-28 and Page 97 to Technical Specifications for Vermont Yankee BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information ML0408602662004-03-22022 March 2004 Technical Specification, Safety Limit Minimum Critical Power Ratio Values in Technical Specification 1.1.A.1 to Incorporate Results in cycle-specific Core Reload Analysis for Cycle 24 Operation ML0329301432003-10-10010 October 2003 Technical Specification Proposed Change No. 262, Supplement No. 1 Regarding Alternative Source Term ML0328104472003-10-0101 October 2003 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance ML0321906462003-07-31031 July 2003 TS Proposed Change No. 262, Alternative Source Term ML0226302842002-09-18018 September 2002 Technical Specifications, Remove Existing Scram Function & Group 1 Isolation Valve Closure Functions of Main Steam Line Radiation Monitors ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2014-06-11
[Table view] |
Text
Entergy Nuclear Operations, Inc.Vermont Yankee P.O. Box 0250 E tr320 Governor Hunt Rd En te 6gy Vernon, VT 05354 Tel 802 257 7711 September 22, 2008 BVY 08-059 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Docket No. 50-271, License No. DPR-28 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications
Dear Sir or Madam,
In accordance with 10CFR50.90, Entergy Nuclear Operations, Inc. (ENO) is proposing to amend Operating License DPR-28 for Vermont Yankee Nuclear Power Station (VY). The proposed change would relocate the contents of the VY Technical Specifications (TS) relating to the Reactor Building crane to the VY Technical Requirements Manual.ENO has reviewed the proposed amendment in accordance with 10CFR50.92 and concludes it does not involve a significant hazards consideration.
In accordance with 10CFR50.91, a copy of this application, with attachments, was provided to the State of Vermont, Department of Public Service.Attachment 1 contains an evaluation of the proposed TS changes. Attachment 2 provides the marked-up version of the appropriate pages of the current TS. Attachment 3 contains the retyped TS pages.ENO requests review and approval of the proposed license amendment by September 1, 2009 and a 60 day implementation period from the date of the amendment approval.There are no new regulatory commitments made in this letter.If you have any questions on this transmittal, please contact Mr. David Mannai at (802) 451-3304.
BVY 08-059 / Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on September 22, 2008.Sincerely, ed .ul~livan Site Vice President Vermont Yankee Nuclear Power Station Attachments
- 1. Description and Evaluation of the Proposed Changes 2.. Markup of the Current Technical Specifications
- 3. Retyped Technical Specifications cc: Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service.112 State Street -Drawer 20 Montpelier, Vermont 05620-2601 BVY 08-059 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Change 280 Description and Evaluation of Proposed Changes BVY 08-059 / Attachment 1 / Page 1 of 4 1. Description of Proposed Change The proposed license amendment relocates the sections of the VY TS relating to the Reactor Building crane to the VY Technical Requirements Manual (TRM).Specifically, the changes proposed are: 1) Pages 235 and 236, TS 3/4.12.G:
This TS is being relocated to the TRM.2) Page 239, Bases for TS 3/4.12.G:
This Bases is being relocated to the TRM.2. Purpose of Proposed change The Vermont Yankee Nuclear Power Station (VY) Technical Specification (TS) contains sections governing operation of the Reactor Building crane. The proposed change is to relocate the sections of the TS relating to the Reactor Building crane to the VY Technical Requirements Manual (TRM). The TRM is maintained in accordance with Vermont Yankee administrative processes and changes to the TRM are evaluated per the requirements of 10CFR50.59.
The Reactor Building crane is a 110 ton capacity overhead bridge crane 'that provides services for the reactor and refueling area. The crane handles new and spent fuel, incore detectors, a large segmented concrete plug in the refueling level floor, the drywell head, the reactor vessel head, the segmented pool plugs, and the spent fuel shipping cask.The Reactor Building crane sections of the TS are being relocated to the TRM because the Reactor Building crane is not included in the Standard Technical Specifications (STS), NUREG-1433, nor does it meet the following criteria of 10CFR50.36(d)(2)(ii) for requiring a limiting condition of operation (LCO): Criterion
- 1. Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.The Reactor Building crane provides lifting services for the reactor and refueling area. The Reactor Building crane is not used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.Criterion
- 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.The Reactor Building crane operability and surveillance requirements do not affect a process variable, design feature, or operating restriction that is an initial condition of design basis accidents or transients described in UFSAR chapter 14. The crane operability and surveillance requirements are related to handling and -movement of a spent fuel cask and ensure that the Reactor Building crane is inspected and tested prior to use. Additionally, the TS requires mechanical rail stops to be installed to prohibit movement of"the cask over irradiated fuel. This is consistent with commitments made in response to NUREG 0612 to ensure that all cask handling operations are bounded by the design basis accidents and transients described in the VY UFSAR. This proposed change relocates the current BVY 08-059 / Attachment 1 / Page 2 of 4 requirements from the TS to the TRM and does not propose a change to any of the requirements.
Criterion
- 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.The Reactor Building crane is not a part of the primary success path and does not function or actuate to mitigate design basis accidents or transients described in the VY UFSAR Chapter 14. The Reactor Building crane is used for lifting of objects within the Reactor Building.
The Reactor Building crane satisfies VY commitments made in response to NUREG 0612 which include redundancy requirements and use of safe load path evaluations.
The Reactor Building crane is not the initiator of any accident or transient described in VY UFSAR chapter 14 and is not used to mitigate the consequences of any design basis accident or transient.
This proposed change relocates the crane operability requirements from the TS to the TRM and does not propose a change to any of the requirements.
Criterion
- 4. A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.The Reactor Building crane is not modeled in the VY probabilistic risk assessment due to its low significance to public health and safety.3. Safety Implications of the Proposed Change The Reactor Building crane is a 110 ton capacity overhead bridge crane that provides services for the reactor and refueling area. The crane handles new and spent fuel, in-core detectors, a large segmented concrete plug in the refueling level floor, the drywell head, the reactor vessel head, the segmented pool plugs, and the spent fuel shipping cask.Following implementation of the proposed change, the VY TRM will contain all of the requirements and information related to the Reactor Building crane that had previously been contained in the VY TS. The TRM is maintained in accordance with Vermont Yankee administrative processes and changes to the TRM are evaluated per the requirements of 10CFR50.59.
These controls are adequate to ensure the Reactor Building crane is operable and capable of performing its intended functions.
The proposed amendment does not change any existing requirements and does not adversely affect existing plant safety margins or the reliability of the equipment assumed to operate in the safety analysis.,As such, there are no changes being made to safety analysis assumptions, safety limits or safety system settings that would adversely affect plant safety as a result of the proposed amendment.
- 4. Evaluation of Significant Hazards Consideration The proposed license amendment relocates the sections of the Vermont Yankee Nuclear Power Station Technical Specifications relating to the operability of the Reactor Building crane to the Vermont Yankee Nuclear Power Station Technical Requirements Manual.
BVY 08-059 / Attachment 1 / Page 3 of 4 Pursuant to 10CFR50.92, Entergy Nuclear Operations, Inc. (ENO) has reviewed the proposed change and concludes that the change does not involve a significant hazards consideration since the proposed change satisfies the criteria in 10CFR50.92(c).
These criteria require that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. The discussion below addresses each of these criteria and demonstrates that the proposed amendment does not constitute a significant hazard.The proposed change does not involve a significant hazards consideration because: 1) The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
This proposed change relocates the VY TS and associated Bases related to the Reactor Building crane to the VY TRM. The proposed amendment does not impact the operability of any structure, system or component that affects the probability of an accident or that supports mitigation of an accident previously evaluated.
The proposed amendment does not affect reactor operations or accident analysis and has no radiological consequences.
The operability requirements for accident mitigation systems remain consistent with the licensing and design basis. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2) The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
This proposed change relocates the VY TS and associated Bases related to the Reactor Building crane to the VY TRM. The proposed amendment does not change the design or function of any component or system. No new modes of failure or initiating events are being introduced.
Therefore, operation of VY in accordance with the proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
_3) The operation of Vermont Yankee Nuclear Power Station (VY) in accordance with the proposed amendment will not involve a significant reduction in a margin of safety.This proposed change relocates the VY TS and associated Bases related to the Reactor Building crane to the VY TRM. The proposed amendment does not change the design or function of any component or system. The proposed amendment does not involve any safety limits, safety settings or safety margins. The ability of the Reactor Building crane to perform its intended functions will continue to be required in accordance with the VY TRM.
BVY 08-059 / Attachment 1 / Page 4 of 4 Since the proposed controls are adequate to ensure the operability of the Reactor Building crane, there will still be high assurance that the components are operable and capable of performing their respective functions.
Therefore, operation of VY in accordance with the proposed amendment will not involve a significant reduction in the margin to safety.5. Environmental Consideration This amendment request meets the eligibility criteria for categorical exclusion from environmental review set forth in 1 0CFR51.22(c)(9) as follows: (i) The amendment involves no significant hazards determination.
As described in Section IV of this evaluation, the proposed change involves no significant hazards consideration.(ii) There is no significant change in the types or significant increase in the amounts, of any effluent that may be released offsite.The proposed amendment does not involve any physical alterations to the plant configuration.
The proposed change does not affect the operation of the Reactor Building crane in a way that could change the types or significantly increase the amounts of any effluent that may be released offsite.(iii) There is no significant increase in individual or cumulative occupational radiation exposure.The proposed amendment does not involve any physical alterations of the plant configuration.
The proposed change does not affect the safety function of the Reactor Building crane. The relocation of the Reactor Building crane TS and associated Bases to the TRM will not increase individual or cumulative occupational radiation exposure.Based on the above, VY concludes that the proposed change meets the eligibility criteria for categorical exclusion as set forth in 10CFR51.22(c)(9).
Pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
- 6. References a) NUREG-1433, Revision 3, "Standard Technical Specifications General Electric Plants, BWR/4," dated March 2004.
BVY 08-059 Docket 50-271 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Change 280 Markup of the Current Technical Specifications and Bases Pages VYNPS 3.12 LIMITING CONDITIONS FOR OPERATION 4.12 SURVEILLANCE REQUIREMENTS F. Fuel Movement The reactor shall be shut down for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to fuel movement within the reactor core.F. Fuel Movement Prior to any fuel handling or movement in the reactor core, the licensed operator shall verify that the reactor has been shut down for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.G7 C ane ýerb blit C- V ~ he e act r3ildi g cr e sh 1 e op ra e w n th or ne u ed r ha dli g o a pen uel as Amenrjmen-ý No.235 VYNPS 3.12 LIMITING CONDITIONS FOR 4.12 SURVEILLANCE REQUIREMENTS H. Spent Fuel Pool Water Temperature Whenever irradiated fuel is stored in the spent fuel pool, the pool water temperature shall be maintained below 150'F.H. Spent Fuel Pool Water Temperature Whenever irradiated fuel is in the spent fuel pool, the pool water temperature shall be recorded daily. If the pool water temperature reaches 150 0 F, all refueling operations tending to raise the pool water temperature shall cease and measures taken immediately to reduce the pool water temperature below 150°F.Amendment No. 37 236 VYNPS BASES: 3.12 & 4.12 (Cont'd)E. The intent of this specification is to permit the unloading of a portion of the reactor core for such purposes as inservice inspection requirements,,examination of the core support plate, contr6l rod, control rod drive maintenance, etc. This specification provides assurance that inadvertent criticality does not occur during such operation.
This operation is performed with the mode switch in the "Refuel" position to provide the refueling interlocks normally available during refueling as explained in the Bases for Specification 3.12.A. In order to withdraw more than one control rod, it is necessary to bypass the refueling interlock on each withdrawn control rod which prevents more than one control rod from being withdrawn at a time. The requirement that the fuel assemblies in the cell controlled by the control rod be removed from the reactor core before the interlock can be bypassed ensures that withdrawal of another control rod does not result in inadvertent criticality.
Each control rod essentially provides reactivity control for the fuel assemblies in the cell associated with that control rod. Thus, removal of an entire cell (fuel assemblies plus control rod) results in a lower reactivity potential of the core.One method available for unloading or, reloading the core is the spiral unload/reload.
Spiral reloading and unloading encompass reloading or unloading a cell on the edge of a continuous fueled region (the cell can be reloaded or unloaded in any sequence.)
The pattern begins (for reloading) and ends (for unloading) around, a single SRM. The spiral reloading pattern is the reverse of the unloading pattern, with the exception that two diagonally adjacent bundles, which have previously accumulated exposure in-core, and placed next to each of the four SRMs before the actual spiral reloading begins. The spiral reload can be to either the original configuration or a different configuration.
Additionally, at least 50% of the fuel assemblies to be reloaded into the core shall have previously accumulated a minimum exposure of 1000 Mwd/T to ensure the presence of a minimum neutron flux as described in Bases Section 3.12.B.F. The intent of this specification is to assure that the reactor core has been shut down for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following power operation and prior to fuel handling or movement.
The safety analysis for the postulated refueling accident assumed that the reactor had been shut down for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for fission product decay prior to any fuel handling which could result in dropping of a fuel assembly.G. Th opera ility/require ents of the reactor building crane ensures thatreduant eature of th crane ave bee adequ tel spectd just t usio it fo handi g of a spent f el ca .T redun ant oist yste ensur that load 11 not e dro ped f/ any ýstula ed cred* le s ngle c ponen Ifailuris.
Cra e ins ection nd c ane r e rep ire ts of NSc S andart /302 6 ne ails o the d f r u tu e of the H. The Spent Fuel Pool Cooling System is designed to maintain the pool water temperature below i25°F during normal refueling operations, if the reactor core is completely discharged, the temperature of the pool water may increase to greater than i25°F. The FHR System supplemental fuel pool cooling may be used under these conditions to maintain the pool water temperature Sess thFrn noFrm.Amendment No. -24,-;4, -, 5-l-, q4,4 :--3-1-9 239 BVY 08-059 Docket 50-271 Attachment 3 Vermont Yankee Nuclear Power Station Proposed Change 280 Retyped Technical Specification and Bases Pages VYNPS 3.12 LIMITING CONDITIONS FOR OPERATION F. Fuel Movement The reactor shall be shut down for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to fuel movement within the reactor core.G. Deleted 4.12 SURVEILLANCE REQUIREMENTS F. Fuel Movement Prior to any fuel handling or movement in the reactor core, the licensed operator shall verify that the reactor has been shut down for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.G. Deleted)Amendment No. 14, 24G, 2-3-23 235 VYNPS 3.12 LIMITING CONDITIONS FOR OPERATION 4.12 SURVEILLANCE REQUIREMENTS H. Spent Fuel Pool Water Temperature Whenever irradiated fuel stored in the spent fuel pool, the pool water temperature shall be maintained below 150 0 F.is H. Spent Fuel Pool Water Temperature Whenever irradiated fuel is in the spent fuel pool, the pool water temperature shall be recorded daily.If the pool water temperature reaches 150'F, all refueling operations tending to raise the pool water temperature shall cease and measures taken immediately to reduce the pool water temperature below 150'F.Amendment No. 342 236 VYNPS BASES: 3.12 & 4.12 (Cont'd)E. The intent of this specification is to permit the unloading of a portion of the reactor core for such purposes as inservice inspection requirements, examination of the core support plate, control rod, control rod drive maintenance, etc. This specification provides assurance that inadvertent criticality does not occur during such operation.
This operation is performed with the mode switch in the "Refuel" position to provide the refueling interlocks normally available during refueling as explained in the Bases for Specification 3.12.A. In order to withdraw more than one control rod, it is necessary to bypass the refueling interlock on each withdrawn control rod which prevents more than one control rod from being withdrawn at a time. The requirement that the fuel assemblies in the cell controlled by the control rod be removed from the reactor core before the interlock can be bypassed ensures that withdrawal of another control rod does not result in inadvertent criticality.
Each control rod essentially provides reactivity control for the fuel assemblies in the cell associated with that control rod. Thus, removal of an entire cell (fuel assemblies plus control rod) results in a lower reactivity potential of the core.One method available for unloading or reloading the core is the spiral unload/reload.
Spiral reloading and unloading encompass reloading or unloading a cell on the edge of a continuous fueled region (the cell can be reloaded or unloaded in any sequence.)
The pattern begins (for reloading) and ends (for unloading) around a single SRM. The spiral reloading pattern is the reverse of the unloading pattern, with the exception that two diagonally adjacent bundles, which have previously accumulated exposure in-core, and placed next to each of the four SRMs before the actual spiral reloading begins. The spiral reload can be to either the original configuration or a different configuration.
Additionally, at least 50% of the fuel assemblies to be reloaded into'the core shall have previously accumulated a minimum exposure of 1000 Mwd/T to ensure the presence of a minimum neutron flux as described in Bases Section 3.12.B.F. The intent of this specification is to assure that the reactor core has been shut down format least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following power operation and prior to fuel handling or movement.
The safety analysis for the postulated refueling accident assumed that the reactor had been shut down for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for fission product decay prior to any fuel handling which could result in dropping of a fuel assembly.G. Deleted H. The Spent Fuel Pool Cooling System is designed to maintain the pool water temperature below 125 0 F during normal refueling operations.
If the reactor core is completely discharged, the temperature of the pool water may increase to greater than 125 0 F. The RHR System supplemental fuel pool cooling may be used under these conditions to maintain the pool water temperature less than 150 0 F.Amendment No. 9-4, 4-, .4;, 2-94,