Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklits (Swcs), Battery 2N. Pages 1 - 82
ML13008A042
Person / Time
Site: Beaver Valley
Issue date: 10/31/2012
From: Guerra E M, Helffrich A L
Paul C. Rizzo Associates, ABS Consulting, FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
2N, L-12-283
Download: ML13008A042 (83)


Text

APPENDIX B SEISMIC WALKDOWN CHECKLISTS (SWCs)B-1 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet I of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2N Equip. Class 15. Battery Racks Equipment Description BATTERY 2N Location:

Bldg.AUXB Floor El. 603 Room 428A Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounting frame consists of single tier/two row braced racks.2. Is the anchorage free of bent, broken, missing or loose hardware?Rack to floor anchorage verified and no significant degraded condition identified

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Anchorage inspected and no corrosion identified

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N Xii iI I Y N U N/A X N U N/Y N U N/A X Y N U N/A X Y N U N/A x 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawings C(-752 (Section B) and E-854Q- 115-1 identify the configuration as four cast in place bolts per row and it was confirmed in the field during walkdown inspection.

Y N U X II I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

[2Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 2 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. 2N Equipment Description Equip. Class 15. Battery Racks BATTERY 2N Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

I Nearby wooden platform identified as a seismic concern.During inspection it was verified in control process that scaffold is within working period.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block walls 4016 and 4026 verified to be to be seismically adequate based on ref VBW20-BO01-100, Rev 14 (12/6/88).

9. Do attached lines have adequate flexibility to avoid damage? I 10. Based on the above seismic interaction evaluations, is equipment free [of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich POQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 3 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. 2N Equipment Description BATTI Equip. Class 15. Battery Racks~RY 2N Other supporting or relevant documents and photos (if an 2N plate ID Plate of component 2N general General view of component Uc3Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTIS Sheet 4 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. 2N Equip. Class 15. Battery Racks Equipment Description BATTERY 2N 2N Anchorage Partial view of anchorage, view is typical of all anchors 2N Masonry Wall Potential interaction hazard from masonry wall near unit L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 5 of 379 Status N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2N Equipment Description BATTE Equip. Class 15. Battery Racks RY 2N 2N wood platform Wood platform erected above battery 1 -,-% Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANrrS Sheet 6 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. 2P Equipment Description Equip. Class 15. Battery Racks BATTERY 2P Location:

Bldg.AUXB Floor El. 603 Room 428A Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounting frame consists of single tier/two row braced racks.Same configuration as 2N.2. Is the anchorage free of bent, broken, missing or loose hardware?Rack to floor anchorage verified and no significant degraded condition identified

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Anchorage inspected and no corrosion identified

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawings C-752 (Section B) E-854Q- 115-1 identify the configuration as four cast in place bolts per row and it was confirmed in the field during walkdown inspection.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I UIQ Paul C. Rizzo Associates, Inc.Sheet 7 of 379 ENGINEERS

& CONSULTANTS Statu Q N U Seismic Walkdown Checklist (SWC)I.)Equipment ID No. 2P Equipment Description Equip. Class 15. Battery Racks BATTERY 2P Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Z Nearby wooden platform identified as a seismic concern.During inspection it was verified in control process that scaffold is within working period.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block walls 4016 and 4026 verified to be to be seismically adequate based on ref VBW20-BO01-100, Rev 14 (12/6/88).

9. Do attached lines have adequate flexibility to avoid damage? L._10. Based on the above seismic interaction evaluations, is equipment free L.of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N Uj~Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X II I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra ,,/Date: 7/25/2012 Date: 7/25/2012 Adam L. Helftrich U c-- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTIS StatusQN U Seismic Walkdown Checklist (SWC)Sheet 8 of 379 Equipment IDNo. AF19 Equipment Description Equip. Class Od. Other -check/manual valve CHECK VALVE AF 19 Location:

Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Valve in line with 6"pipe properly supported 2. Is the anchorage free of bent, broken, missing or loose hardware?Main line supports inspected and no missing bolts/parts identified

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Main line supports showed adequate condition and no missing parts.Y N II X Y N U N/A--T x Y N U N/A-T x Y N U N/A x Y N U N/A x Y N U x I I D C- 12= Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'T'S Seismic Walkdown Checklist (SWC) StatusQN U Sheet 9 of 379 Equipment ID No. AFI9 Equipment Description Equip. Class Od. Other -check/manual valve CHECK VALVE AF 19 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich 00Z Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 10 of 379 StatusQV"N U Seismic Walkdown Checklist (SWC)Equipment IDNo. AF19 Equipment Description CHECI0 Equip. Class Od. Other -check/manual valve VALVE AF 19 Other supporting or relevant documents and photos (if any): AFI9 Plate ID Plate of component AF 19 General General view of component LCNQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet II of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. AF608 Equipment Description Equip. Class 8A. Motor-Operated Valves AUX FEED TO STEAM GEN I1-I LINE STOP VLV Location:

Bldg.AUXB Floor El. 585 Room 303 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Valve in line with 8" pipe properly supported 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y Nz Y N U N/A-T x Y N U N/A iF i I X Y N U N/A-7 x Y N U N/A-J ] X Y N U X I I Qlo'Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 12 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. AF608 Equipment Description Equip. Class 8A. Motor-Operated Valves AUX FEED TO STEAM GEN 1-1 LINE STOP VLV Interaction Effects Y 7. Are soft targets free from impact by nearby equipment or structures?

I X Y 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, X and masonry block walls not likely to collapse onto the equipment?

Y 9. Do attached lines have adequate flexibility to avoid damage? I X Pipe runs through shield building from Auxiliary Building.The effect of seismic differential displacement between the Auxiliary Building and the Shield Building on this piping was verifiedfrom Calc No. IB R/12 andfound acceptable.

Y 10. Based on the above seismic interaction evaluations, is equipment free X of potentially adverse seismic interaction effects?N U N/A N U N/A N U N/A z~I NI Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

)Evaluated by: Eddie M. Guerra 1'/14reýl

'4ý/4 Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich L--0Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 13 of 379 StatusQN U Seismic Walkdown Checkl Equipment ID No. AF608 Equipment Description list (SWC)Equip. Class 8A. Motor-Operated Valves AUX FEED TO STEAM GEN 1-I LINE STOP VLV Other supporting or relevant documents and photos (if any): AF608 plate ID Plate of component AF608 general General view of component

[CQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 14 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. AF608 Equipment Description AUX F]Equip. Class 8A. Motor-Operated Valves EED TO STEAM GEN 1-1 LINE STOP VLV Run of pipe from AF608 from Auxiliary Building to Shield Building Subject to seismic anchor movements L1' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 15 of 379 Status:QN U Seismic Walkdown Checklist (SWC)Equipment ID No. BWIO Equipment Description Equip. Class Od. Other -check valve or manual valve Flush Connection Location:

Bldg.AUXB 565'10.25" Floor El.Room 209 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Valve located on pipe around 3" diameter.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A F -T x Y N U N/A-F x Y N U N/A F I I x Y N U N/A II x Y N U x I I


Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAWNS Sheet 16 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. BWIO Equipment Description Equip. Class Od. Other -check valve or manual valve Flush Connection Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich IC" Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 17 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. BWI0 Equipment Description Equip. Class Od. Other -check valve or manual valve Flush Connection Other supporting or relevant documents and photos (if any): BW 10 Plate and General ID plate and general view of component 00 Q Paul C. Rizzo Associates, Inc.Sheet 18 of 379 ENGINEERS

& CONSULTAWTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. BW21 Equipment Description Equip. Class Od. Other -check valve or manual valve Borated Water Storage Tank Outlet Isolation Location:

Bldg.AUXB Floor El. 586'Room 304 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No degraded condition found Valve located on -1O" pipe.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I I xL Y N U N/A-TI I X Y N U N/A T I x Y N U N/A-T x Y N U N/A-I x Y N U x I I -

00Z- Paul C. Rizzo Associates, Inc.Sheet 19 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. BW21 Equipment Description Equip. Class Od. Other -check valve or manual valve Borated Water Storage Tank Outlet Isolation Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 CQ- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 20 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. BW21 Equipment Description Borated Equip. Class Od. Other -check valve or manual valve Water Storage Tank Outlet Isolation Other supporting or relevant documents and photos (if any): BW21 Plate BW21 General ID plate of component General view of component I Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 21 of 379 Seismic Walkdown Checklist (SWC) Status:QN U Equipment IDNo. CI Equipment Description Equip. Class 3. Medium Voltage Switchgear BUS Cl Location:

Bldg.AUXB Floor El. 585 Room 325 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet could not be opened during walkdown.

Mounting base found in adequate condition. (See also item 5 below)3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Panel door was closed and anchorage inside cabinet could not be verified However, SQUG C-CSS-CJ calculation was used and it was verified that anchorage capacity is adequate for the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

~I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I x Y N U x I I UI2Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 22 of 379 Status:6Qs)

U Seismic Walkdown Checklist (SWC)Equipment IDNo. C1 Equipment Description Equip. Class 3. Medium Voltage Switchgear BUS CI Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Nearby fire extinguisher not fixed to wall. Judged not to be significant interaction

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I i Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 23 of 379 Status:F)q U Seismic Walkdown Checklist (SWC)Equipment ID No. CI Equip. Class 3. Medium Voltage Switchgear Equipment Description BUS Cl Other supporting or relevant documents and photos (if any): Cl Plate ID Plate of component CI General General view of component 1-b. Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 24 of 379 StatusQ4 U Equipment IDNo. CII-I Equip. Class 12. Air Compressors Equipment Description Emergency Diesel Generator Starting Air compressor 1-1 Location:

Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of.judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Compressor rigidly mounted on skid with 4-1/2" bolts.Skid is welded to a larger skid. Larger skid anchored to floor with eight 1/2" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Bolts on frame-skid mounting found in adequate condition 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N EZI XI I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I x Y N U x I I Uc2Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 25 of 379 Seismic Walkdown Checklist (SWC) Status N U Equipment ID No. C I1-1 Equipment Description Equip. Class 12. Air Compressors Emergency Diesel Generator Startin2 Air compressor 1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra~46~ >,>//Date: 7/25/2012 Adam L. Helffrich LCZQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 26 of 379 StatusN U Seismic Walkdown Checklist (SWC)Equipment ID No. CI1-1 Equipment Description Emerge Equip. Class 12. Air Compressors ncy Diesel Generator Starting Air compressor 1-1 Other s or relevant documents and Ahotos (if ai CI -I plate ID Plate of component CIl-I general General view of component DX Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTIS Sheet 27 of 379 StatusQN U Seismic Walkdown Checklist (SWC) V.Equipment ID No. CI1-1 Equipment Description Equip. Class 12. Air Compressors Emergency Diesel Generator Starting Air compressor I -I A-C I1-I skid anchor Partial view of anchorage, view is typical of all anchors C I1-I connection to skid underneath Attachment of component to skid underneath I -- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTA'TS Sheet 28 of 379 Status:QN U Seismic Walkdown Checklist (SWC)Equipment IDNo. C21-1 Equipment Description Equip. Class 9. Fans CNTRL RM EMERO VENT SYS FAN I1-I Location:

Bldg.AUXB Floor El. 638 Room 603 Manufacturer, Model, Etc.CNTRL RM EMERG VENT SYS FANI-I Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on 4 spring isolators, each with 2-5/8" anchor bolts found in good condition.

2. Is the anchorage free of bent, broken, missing or loose hardware?No degraded condition foundfor bolts on component base frame 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG C-CSS-C21-1 calculation identifies the configuration as four spring isolators and it was confirmed in the field during walkdown inspection.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

SQUG calculation C-CSS-C2 1-1 identified outlier -vibration isolators on fan base did not provide adequate restraint of overturning moment.Fixity provided to resolve outlier presented in SQUG calc (MOD95-003 1).Y N X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I L 7 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANW'S Seismic Walkdown Checklist (SWC)Sheet 29 of 379 StatusqN U Equipment ID No. C21-1 Equip. Class 9. Fans Equipment Description CNTRL RM EMERG VENT SYS FAN I1-I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the congested area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 30 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C21-1 Equipment Description CNTR1 Equip. Class 9. Fans RM EMERG VENT SYS FANI-I Other supporting or relevant documents and photos (if any): C21-1 Plate C21-1 General ID Plate of component General view of component

--I*. Paul C. Rizzo Associates, Inc.Sheet 31 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C21-1 Equipment Description CNTRL Equip. Class 9. Fans RM EMERG VENT SYS FANI-I 22 I -I anchorage typical View of anchorage UCYQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSSULTANrS Seismic Walkdown Checklist (SWC)Sheet 32 of 379 Status:QN U Equipment ID No. C25-3 Equip. Class 9. Fans Equipment Description VENTFAN3 Location:

Bldg.AUXB Floor El. 585 Room 319 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Fan suspendedfrom aframe, anchor bolted to ceiling.2. Is the anchorage free of bent, broken, missing or loose hardware?Fan is part of ventilation system.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N X I I Y N U N/A--T x Y N U N/A x Y N U N/A-E x Y N U N/A x ity (p.5 of 8).5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Previous SQUG calculation C-CSS-C25-3 identified connection has adequate flexibil SQUG calculation identified anchors that did not achieve full embedment.

Anchorage found acceptable after calculation (p. 8 of8).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N U x I I

[2M Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 33 of 379 Statusq N U Seismic Walkdown Checklist (SWC) V1 Equipment ID No. C25-3 Equipment Description Equip. Class 9. Fans VENT FAN 3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No potential interaction due to fan location.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Paul C. RiN1o Associates Sheet 34 of 379 E N G I N E R s & c o N s U E TA ..n .h e 4 o Seismic Walkdown Chec, Equipment ID No. C25-3 Equipment Description klist (swC)Statusry"\N U\.w./Equip. Class 9. Fans VENTFAN3 Other supporting or relevant document (if any)

LC442 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 35 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. C31-4 Equipment Description Equip. Class 9. Fans FAN C31-4 Location:

Bldg.AUXB Floor El. 545 Room 105 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on 4 W-shape supports.Each W-shape is anchored with two 5/8" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?

[Missing closure nuts along one side of the unit.Confirmed with maintenance that sheet metal screws are used and nuts are not required 3. Is the anchorage free of corrosion that is more than mild surface K oxidation?

Slight corrosion found in wide flanges used for mounting base.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?

[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A x I Y N U N/A x Y N U N/A x Y N U N/A-T x Y N U L2Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 36 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C31-4 Equipment Description Equip. Class 9. Fans FAN C31-4 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Several pipe lines running into fan housing properly supported with floor mounted HSS sections.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 37 of 379 StatusQN U Seismic Walkdown Checklist (SWC) N-Equipment ID No. C31-4 Equipment Description Equip. Class 9. Fans FAN C31-4 Other supporting or relevant documents and photos (if any): C31-4 plate C3 1-4 general ID Plate of component General view of component UL- Paul C. Rizzo Associates, Inc.Sheet 38 of 379 ENGINEERS

& CONSULTANTS StatusN U Seismic Walkdown Checklist (SWC)Equipment ID No. C31-4 Equipment Description FAN C Equip. Class 9. Fans 31-4 C31-4 anchorage Partial view of anchorage, view is typical of all anchors LCQ Paul C. Rizzo Associates, Inc.Sheet 39 of 379 ENGINEERS

& CONSULTANTrS Statusq N U Seismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equipment Description Equip. Class 20. Instrument and Control Panels EDG I CONTROL PANEL Location:

Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

3 section panel anchored with 10-1/2" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet was opened for inspection and no degraded condition or missing parts were observed 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Calculation C-CSS-C3615 identifies the configuration as ten anchor bolts and it was confirmed in the field during walkdown inspection.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N EX I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I- Y Paul C. Rizzo Associates, Inc.Sheet 40 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equipment Description Equip. Class 20. Instrument and Control Panels EDG 1 CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A X Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 LcQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 41 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equipment Description EDG I Other sum)Equip. Class 20. Instrument and Control Panels CONTROL PANEL or relevant documents and photos (if any): Uib r) plate ID Plate of component C3615 general General view of component i--Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 42 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equipment Description EDG 1 Equip. Class 20. Instrument and Control Panels CONTROL PANEL C3616 anchorage Anchorage from unit C3616 is similar to C3615 which is currently energized LC'Q Paul C. Rizzo Associates, Inc.Sheet 43 of 379 ENGINEERS

& CONSULTANTS Status" U Seismic Walkdlown Checklist (SWC) ýEquipment ID No. C3645 Equipment Description Equip. Class 20. Instrument and Control Panels CONTROL PANEL (AUX FEEDWATER)

Location:

Bldg.AUXB Floor El. 585 Room 325 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Cabinet anchored with 6-1" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Mounting base found in adequate condition.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

No signs of significant corrosion found 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks identified in mounting base.5. Is the anchorage configuration consistent with plant documentation?

Y N XLIZZ I Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A X (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG C-CSS-C3645 and C-CSS-C4625 calculations were used and it was verified that anchorage capacity is adequate for the configuration shown.Y N U X II 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

LCQ Paul C. Rizzo Associates, Inc.Sheet 44 of 379 ENGINEERS

& CONSULTANTS U Seismic Walkdown Checklist (SWC)Equipment ID No. C3645 Equipment Description Equip. Class 20. Instrument and Control Panels CONTROL PANEL (AUX FEEDWATER)

Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A X Y N U N/A X Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Mantainance or movable equipment found in the area with proper tight conditions.

.7 Evaluated by: Eddie M. Guerra~;'/Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich Adam L. Helffrich

[ Y Paul C. Rizzo Associates, Inc.Sheet 45 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C3645 Equipment Description CONTI Equip. Class 20. Instrument and Control Panels LOL PANEL (AUX FEEDWATER)

)Other supporting or relevant documents and photos (if any): C3645 Plate ID Plate of component C3645 General General view of component

[C-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 46 of 379 StatusN U Seismic Walkdown Checklist (SWC)Equipment ID No. C3645 Equipment Description CONTI Equip. Class 20. Instrument and Control Panels WOL PANEL (AUX FEEDWATER)

C3645 Achor Bolts Partial view of anchorage, view is typical of all anchors

[ --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 47 of 379 StatusQN U Seismic Walkdown Checklist (SWC) j Equipment ID No. C4606 Equipment Description Equip. Class 2. Low Voltage Switchgear REACTOR TRIP BREAKER A (TYPICAL OF 4)Location:

Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panel is welded to embed with stitch welds around the perimeter of the panel base, similar to as-built shown in Calc. C-CSS-4603.

2. Is the anchorage free of bent, broken, missing or loose hardware?Component could not be opened during walkdown.

Mounting base found in adequate condition.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG C-CSS-C4606 and C-CSS-C4603 calculations were used and it was verified that anchorage capacity is adequate for the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N EX I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I L C2Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 48 of 379 StatusQN U Equipment ID No. C4606 Equip. Class 2. Low Voltage Switchgear Equipment Description REACTOR TRIP BREAKER A (TYPICAL OF 4)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Monorail-hoist located in vicinity deemed not an interaction concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Rigid conduits on end have rigid supports and will provide lateral restraint 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I 1 : Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T T I Comments (Additional pages may be added as necessary)-ZEZZI ýEvaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich Ltic Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 49 of 379 StatusQN U Seismic Walkdown Checki Equipment ID No. C4606 Equipment Description ist (SWC)Equip. Class 2. Low Voltage Switchgear REACTOR TRIP BREAKER A (TYPICAL OF 4)Other supporting or relevant documents and photos (if any): U4OUb Plate ID Plate of component C4606 General General view of component C--ZQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 50 of 379 Seismic Walkdown Checklist (SWC) StatusQ U Equipment ID No. C4606 Equipment Description Equip. Class 2. Low Voltage Switchgear REACTOR TRIP BREAKER A (TYPICAL OF 4)u4ouo stitcn wela Partial view of anchorage, view is typical of all anchors t+4ouo crane Int Sliding crane located in component vicinity.

L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 51 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C5702 Equipment Description Equip. Class 20. Instrument and Control Panels operator console panels -left Location:

Bldg.AUXB Floor El. 623 Room 505 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Anchorage not verified since is covered with fire proofing material.Back panel doors are adequately attached to panel structure with 4-1/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?None observed during inspection.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

No significant corrosion observed in the component.

4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG C-CSS-C5 702 calculation was used and it was verified that anchorage capacity is adequate for the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A IT- Ix Y N U x I I LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 52 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. C5702 Equipment Description Equip. Class 20. Instrument and Control Panels operator console panels -left Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra* ,/Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich LUC'ý Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 53 of 379 StatusQN U Seismic Walkdown Checkl Equipment ID No. C5702 Equipment Description list (SWC)Equip. Class 20. Instrument and Control Panels operator console panels -left Other supporting or relevant documents and photos (if any): 4pý 4C C5702 General view of component PCZQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 54 of 379 Status N U Equipment ID No. C5706 Equip. Class 2. Low Voltage Switchgear Equipment Description MANUAL REACTOR TRIP SWITCHES (2) IN CONTROL ROOM Location:

Bldg.AUXB Floor El. 623 Room 505 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of-judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage not accessible during inspection since it was covered with fireproofing material.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed due tofireproofing material.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during walkdown.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG C-CSS-C5702 and C-CSS-C5706 calculations were used and it was verified that anchorage capacity is adequate for the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

ILX Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A-T x Y N U x I I U --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 55 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. C5706 Equipment Description Equip. Class 2. Low Voltage Switchgear MANUAL REACTOR TRIP SWITCHES (2) IN CONTROL ROOM Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X Y N U N/A x Y N U X II I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X II I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 56 of 379 StatusQDN U Seismic Walkdown Checklist Equipment ID No. C5706 Equipment Description (SWC)Equip. Class 2. Low Voltage Switchgear MANUAL REACTOR TRIP SWITCHES (2) IN CONTROL ROOM Other supporting or relevant documents and photos (if ar LYU.76 plate ID Plate of component C5706 front General view of component Sheet 57 of 379 Paul C. Rizzo Associates, inc.StatunYN U Seismic WalkdOwn Checklist Equipment ID No. C5706 Equipment Description (SWC)Equip. Class 2. Low Voltage Switchgear MANUAL REACTOR TRIP SwITCHES (IN CONTRO RooM General view of component C5706 typical interior3 Typical view of interior components UcQ Paul C. Rizzo Associates, Inc.Sheet 58 of 379 ENGINEERS

& CONSULTANTS StatusY N U Seismic Walkdown Checklist (SWC)Equipment ID No. C5706 Equip. Class 2. Low Voltage Switchgear Equipment Description MANUAL REACTOR TRIP SWITCHES (2) IN CONTROL ROOM U7Ub6 bolted to lelt and right sides Cabinets are bolted together on both sides L' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 59 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C5712 Equipment Description Equip. Class 20. Instrument and Control Panels operator console panels -right Location:

Bldg.AUXB Floor El. 623 Room 505 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Anchorage not verified since is covered withfire proofing material.Back panel doors are adequately attached to panel structure with 4-1/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?None observed during inspection.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

No significant corrosion observed in the component.

4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Panel is similar to Panel C5702. SQUG calculation C-CSS-C5702 verifies that anchorage capacity is adequate for the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N IZI xL I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 60 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C5712 Equipment Description Equip. Class 20. Instrument and Control Panels operator console panels -right Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich ULaC Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN[S Sheet 61 of 379 StatuseS)

N U Seismic Walkdown Checklist (SWC)Equipment ID No. C5755 Equipment Description Equip. Class 20. Instrument and Control Panels Control Room cabinet room Location:

Bldg.AUXB Floor El. 623 Room 502 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

7-Sections cabinet. End cabinets connected by -1/4" welded plates.No access available inside of cabinet.Y 2. Is the anchorage free of bent, broken, missing or loose hardware?

Z X Anchor bolts are inaccessible for inspection.

However, calculation references C-CSS-C5755C, D & G shows anchorage oultiers were resolved Y 3. Is the anchorage free of corrosion that is more than mild surface X oxidation?

None observed during inspection.

Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? IKX None observed during inspection.

Y 5. Is the anchorage configuration consistent with plant documentation?

y (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Panel door was closed and anchorage inside cabinet could not be verified However, C-CSS-C5755C, D & G calculations indicate that MOD95-0032 resolves anchorage concerns.Anchorage adequacy deemed seismically adequate.N Xil N U N/A N U N/A N U N/A N U N/A T IX Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 62 of 379 StatusQN U Equipment IDNo. C5755 Equip. Class 20. Instrument and Control Panels Equipment Description Control Room cabinet room Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

C-CSS-C5755C, D & G indicate cabinets A to G need to be bolted together to prevent pounding interaction.

Issue resolved by MOD95-0032.

Field walkdown verified top connection of adjacent panels are per MOD95-0032.

Evaluated by: Eddie M. Guerra.Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich LCIQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 63 of 379 StatusQN U Seismic Walkdown Checklist (SWC)V/Equipment ID No. C5755 Equipment Description Equip. Class 20. Instrument and Control Panels Control Room cabinet room Other supporting or relevant documents and photos (if any): C5755 plate C5755 general ID Plate of component General view of component C5755 anchorage C5755 anchorage General view of anchorage detail Closeup of anchor bolts and channel mounting base.

Uclaz Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 64 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C5755 Equipment Description Control Equip. Class 20. Instrument and Control Panels Room cabinet room C5755 anchorage blocked interior C5755 Cabinet bracing Top bracing detail for end cabinets C5755 Cabinets welding Welded plates detail for middle cabinets L7Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 65 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. C5792A LB2 Equip. Class 20a. Inst. in control panel/cabinet Equipment Description SFRCS CHANNEL 2 LOGIC BOARD Location:

Bldg.AUXB Floor El. 623 Room 502 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y 1. Is the anchorage configuration verification required (i.e., is the item one I of the 50% of SWEL items requiring such verification)?

No degraded condition identified Cabinet is attached to adjacent panel C5 782 at top. Panel is composed of 2 sections which are attached together at top and mounted on same skid with 12-1/2" bolts.Y 2. Is the anchorage free of bent, broken, missing or loose hardware?

X Anchor bolts are inaccessible for inspection.

However, SQUG calculation C-CSS-C5792A presents no significant degraded condition.

Y 3. Is the anchorage free of corrosion that is more than mild surface L X oxidation?

None observed during walkdown.Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? X No cracks identified near cabinet base.Y 5. Is the anchorage configuration consistent with plant documentation?

Y (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

At the time of the walkdown the equipment could not be opened. for inspection.

SQUG C-CSS-C5 792 calculation was used and it was verified that anchorage capacity is adequate for the configuration shown.Y 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?

Skid mounting and base framing found in adequate conditions.

N XII N U N/A N U N/A N U N/A N U N/A-T x N U I I I Paul C. Rizzo Associates, Inc.Sheet 66 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C5792A LB2 Equipment Description SF1 Equip. Class 20a. Inst. in control panel/cabinet RCS CHANNEL 2 LOGIC BOARD Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Wall identified as 5197 confirmed to be adequqate based on Ref C-CSS-C5 792 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Heliffrich Date: 7/25/2012 Date: 7/25/2012 u Paul C. Rizzo Associates, Inc. Sh ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. C5792A LB2 Equip. Class 20a. Inst. in control panel/cabinet Equipment Description SFRCS CHANNEL 2 LOGIC BOARD Other supporting or relevant documents and photos (if any): C5792A SFRCS ACTUATION CHANNEL #2 I LI eet 67 of 379 C5792A plate ID Plate of component C5792A general General view of component L IZ Paul C. Rizzo Associates, Inc. Sheet 68 of 379 ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. C5792A LB2 Equip. Class 20a. Inst. in control panel/cabinet Equipment Description SFRCS CHANNEL 2 LOGIC BOARD u3 / IA ancnorage Partial view of anchorage, view is typical of all anchors C5792A bolted to cabinet at right Adjacent cabinets are bolted together L --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 69 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. C5792A LB2 Equipment Description SF1 Equip. Class 20a. Inst. in control panel/cabinet U IVLA Dootea to caninet at iert Adjacent cabinets are bolted together LJY/92A logic board inside cabinet View of Logic Board inside the cabinet Dlaz Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 70 of 379 Seismic Walkdown Checklist (SWC) Status N U Equipment ID No. C73-1 Equipment Description Equip. Class 9. Fans AFP ROOM EXHAUST FAN Location:

Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Fan is mounted on four spring isolators supported by rod hangers.Rod hangers are attached to steel support structure, which is anchored to the Q-deck with four 3/8" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?No missing bolts identified associated with component supports.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed during inspection.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

3/8" diameter anchor bolts supporting the fan support assembly are shown to be seismically adequate in Calculation C-CSS-73-1.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N XIx I I Y N U N/A X Y N U N/A X Y N U N/A x Y N U N/A x Y N U X I I RC-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 71 of 379 StatusQN U Equipment ID No. C73-1 Equip. Class 9. Fans Equipment Description AFP ROOM EXHAUST FAN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X Y N U N/A X Y N U X I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Calculation C-CSS-73-1 evaluates the expansion joints and shows seismic adequacy.Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich LCZQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 72 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C73-1 Equipment Description AFP R(Equip. Class 9. Fans)OM EXHAUST FAN Other supporting or relevant documents and photos (if any): Lu/-I uenerai General view of component C73-1 plate and anchorage no lateral bracing View of anchorage, no lateral bracing is visible for hanging fan UCYQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 73 of 379 Status: AN U Equipment ID No. C78-2 Equip. Class 9. Fans Equipment Description BATTERY ROOM VENT FAN 2-2 Location:

Bldg.AUXB Floor El. 603 Room 428A Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one [of the 50% of SWEL items requiring such verification)?

Anchors identified to be installed into decking ridges.SQUG calc C-CSS-C78-1 used as reference since is similar component.

2. Is the anchorage free of bent, broken, missing or loose hardware?

[None observed during walkdown.3. Is the anchorage free of corrosion that is more than mild surface [oxidation?

None observed during walkdown.4. Is the anchorage free of visible cracks in the concrete near the anchors? [Anchors installed through steel decking.5. Is the anchorage configuration consistent with plant documentation?

[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes. Verification based on calculations for component C78-1, calc ID C-CSS-C78-1.

Calcualtion C-CSS-C78-1 shows 1i2"diam anchors inserted into ridges are acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of [potentially adverse seismic conditions?

Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 74 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C78-2 Equipment Description Equip. Class 9. Fans BATT'ERY ROOM VENT FAN 2-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Scaffold in the area not a concern due to fan elevation.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block wall 4016 verified to be seismically adequate based on ref VBW20-BO01-100, Rev 14 (12/6/88).

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Fan found to be adequately stiffened against lateral motion with bracing and component framing.-7Z;ZE-y I -Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich LP--Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 75 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C78-2 Equipment Description BATTE Equip. Class 9. Fans RY ROOM VENT FAN 2-2 Other supporting or relevant documents and photos (if any): C78-2 Plate ID Plate of component C78-2 General General view of component L21- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 76 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. C78-2 Equipment Description BATTI Equip. Class 9. Fans ERY ROOM VENT FAN 2-2 C78-2 anchorage Partial view of anchorage, view is typical of all anchors DOD-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'TS Sheet 77 of 379 Status N U Seismic Walkdown Checklist (SWC)Equipment IDNo. CC1469 Equipment Description Equip. Class 7. Pneumatic-Operated Valves AOV CC 1469 Location:

Bldg.AUXB Floor El. 545 Room 113 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on -16" diam line installed right before containment penetration.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II X I Y N U N/A T I x Y N U N/A F I I x Y N U N/A I I I IT x Y N U N/A F I I Ix Y N U x I I LC1Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 78 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. CC1469 Equipment Description Equip. Class 7. Pneumatic-Operated Valves AOV CC 1469 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines showed adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 L C Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 79 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. CC1469 Equipment Description AOV C Equip. Class 7. Pneumatic-Operated Valves C 1469 Other supporting or relevant documents and photos (if any): CCI 469 General view of component

[ Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 80 of 379 Statuse N U Seismic Walkdown Checklist (SWC)Equipment ID No. CS1530 Equip. Class 8A. Motor-Operated Valves Equipment Description CONTAINMENT SPRAY TRAIN I INJECTION VALVE AT PUMP I-I DISCHARGE Location:

Bldg.AUXB Floor El. 585 Room 303 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Limitorgue has a nut on the lower part of the actuator that holds the cover on that is not fully torgued down. Judged not to affect operability of component.
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Main line anchor support shows not enough grout below anchor plate.Main line presents sufficient lateral bracing. Not considered as adverse condition.
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A T x Y N U x I I U --zY Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 81 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. CS1530 Equip. Class 8A. Motor-Operated Valves Equipment Description CONTAINMENT SPRAY TRAIN I INJECTION VALVE AT PUMP I-I DISCHARGE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Seismic anchor motion confirmed acceptable per caic 1B R112.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x 7777T77 Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x -I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich Sheet 82 of 379 Q C 14Z Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Status/-'N U Seismic Walkdown Checklist (SWC)Equipment ID No. CS 1530 Equip. Class 8A. Motor-Operated Valves Equipment Description CONTAINMENT SPRAY TRAIN I INJECTION VALVE AT PUMP !-1 DISCHARGE Other supporting or relevant documents and photoslif any): D laItju p nate ID Plate of component CS 1530 general General view of component