Text

Pk -Q Paul C. Rizzo Associates, Inc.ENGINEERS

&

Sheet 135 of 191 N U Area Walk-By Checklist (AWC)Status: W)Room Prim. AUX. BLDG 735'6 Floor El.735 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A X Related equipment on SWEL for this area: I CC-E- 1 A L----Paul C. Rizzo Associates, Inc.ENG1NEERS

& CONSULTAMIS Sheet 136 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Prim. AUX. BLDG 735'6 Floor El.735 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources.found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x F--T-Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 L C Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Area Walk-By Checklist (AWC)Sheet 137 of 191 Status: (Y)N U Room Prim. AUX. BLDG 735'6 Floor El.735 Bldg. AXLB Other supporting or relevant documents and photos (if any): File Name: 1-59-1-4-44.jpeg

==

Description:==

General File Name: 1-6U-1-4-44.jpeg

==

Description:==

Rod hung fire pipe is sufficiently rugged L Paul C. Rizzo Associates, Inc.NOGINEERS

& CONSULTANTS Area Walk-By Checklist (AWC)Room Prim. AUX. BLDG 735'6 Floor El. 735 Bldg.Sheet 138 of 191 Status: T N U AXLB File Name: 1-65-1-4-44.jpeg

==

Description:==

Cart properly restrained

[ C Q Paul C. Rizzo A mociates, Inc.ENGINEERS

&

Sheet 139 of 191 Area Walk-By Checklist (AWC)Status: (2)N U Room Prim Aux Bldg 735'6 HX Inlet Floor El.735 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: PT-IRW-1 13A 4t' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANMS Sheet 140 of 191 N U Area Walk-By Checklist (AWC)Status: ()Room Prim Aux Bldg 735'6 HX Inlet Floor El.735 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary)

___-777fý

-ýrt Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 I1 Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN-T Sheet 141 of 191 N U Area Walk-By Checklist (AWC)Status: W Room Prim Aux Bldg 735'6 HX Inlet Floor El.735 Bldg.AXLB Other supporting or relevant documents and photos (if any): Pile Name: 1-59-1-4-45jpeg

==

Description:==

General Pile Name: l-bU-1-4-45.jpeg

==

Description:==

Fire system identified to be adequately supported.

Iv )Q Paul C. Rizzo Associates, Inc.ENGINEERS

&

Sheet 142 of 191 Area Walk-By Checklist (AWC)Status: W)N U Room Prim. Aux Bldg 735'6 E Central Floor El.735 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Some components in area have minor surface corrosion, judged a non issue.3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Missing bolt identified on hanger (H-70) close to MOV-RW-187.

Condition report CR 2012-14047 was issued to address the situation.

A review of calculation for Pipe Support H- 70 was performed (Ref Calculation 13387.02-S (B)-24CC2-B) and it concluded that the base plate was qualified with five bolts configuration and the missing bolt was noted Therefore this is only a configuration issue and not a plant operability concern as the support design is in full compliance with the design basis requirements.

4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: RW-183 I Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSt Sheet 143 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Prim. Aux Bldg 735'6 E Central Floor El.735 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Gas bottle with only one chain at top is near Post Accident Sampling panel PA5CI judged not to cause an interaction concern.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x II I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra SDate: 9/28/2012 Adam L. Helffrich I Q Paul C. Rizzo Associates, Inc.FOINEGEM & CONMULTAN]

Area Walk-By Checklist (AWC)Room Prim. Aux Bld2 735'6 E Central Sheet 144 of 191 Status: Y)N U Floor El.735 Bldg. AXLB Other supporting or relevant documents and photos (if any): Pile Name: 1-)9-1-4-4o.jpeg

==

Description:==

General rue iName: i-ou-i-q-,+o.Jpeg

==

Description:==

Fire system is rugged.

L CQ Paul C. Rizzo Associates, Inc.ENGiNEERS

& CONSULTANTS Sheet 145 of 191 N U Area Walk-By Checklist (AWC)Status: w Room Prim. Aux Bldg 735'6 E Central Floor El.735 Bldg.AXLB File Name: 1-65-1-4-46.jpeg

==

Description:==

HSS hung cable tray is adequately braced File Name: 1-66-1-4-46.jpeg

==

Description:==

HSS hung cable tray is axially braced and judged a non issue.I LC Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'TS Sheet 146 of 191 N U Area Walk-By Checklist (AWC)Status: (S)Room Prim. Aux Bldg 735'6 E Central Floor El.735 Bldg.AXLB File Name: 1-67-1-4-46.jpeg

==

Description:==

Gas bottle with only one chain at top near Post Accident Sampling panel PA5C 1 judged OK.File Name: 1-68-1-4-46.jpeg

==

Description:==

Surface corrosion, judged a non issue IY Paul C. Rizzo Associates, Inc.Sheet 147 of 191"NGINEERSr

& CONSULTAY.1S Area Walk-By Checklist (AWC)Status: (S)N U Room Prim. Aux Bldg 735'6 E Central Floor El.735 Bldg.AXLB File Name: 1-69-1-4-46.jpeg

==

Description:==

Support for CC Water Pump outlet is missing I bolt. Mounted on column near MOV RW 187. CR 2012-14047 was generated I 4Q Paul C. Rizzo Associates, Inc.ENGINtER$

& CONSULTANT" Sheet 148 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Prim Aux Bldg 735'6 W. Wall Floor El.735 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

MCC I -E4 1 Inch from adjacent panel. MCC is top braced by the lop entry conduit and the panel is rigidly attached to wall. Judged no interaction concern.Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: MCC-1-E4 L[ZQ Paul C. Rizzo Associates, Inc.ENGIINEERS

& CONSUtTAWTh Sheet 149 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Prim Aux Bldg 735'6 W. Wall Floor El.735 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A X Y N U N/A X Y N U N/A x Y N U X T---F Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra iY 4 Date: Adam L. Helffrich 9/28/2012 L --- Paul C. Rizzo Associates, Inc.

& CONSULTANTS Sheet 150 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Prim Aux Bldg 735'6 W. Wall Floor El.735 Bldg.AXLB Other supporting or relevant documents and photos (if any): rite tName: 1-:)Y-I- .--/.jpeg

Description:

General rite iNnaime 1-ou--'+-'+.jpeg

==

Description:==

MCC 1 -E4 approximately 1 in from panel judged to have no interaction D --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULT&NIT Sheet 151 of 191 U Area Walk-By Checklist (AWC)Status: Y Room QS-AFW Pump Room Floor El.735 Bldg.SFGB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: FCV-IFW-103B FW-59 FW-P-2 FW-P-3A FW-T-2 MOV-IFW-151E QS-P-IB L Q Paul C. Rizzo Associates, Inc.,NGINEERS

& CONSULTANTS Sheet 152 of 191 U Area Walk-By Checklist (AWC)Status: Y Room QS-AFW Pump Room Floor El.735 Bldg.SFGB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Fire extinguishers located in the area. Judged not to present an interaction concern.Scqffold in vicinity ofpumps identified not to present a significant concern for nearby components.

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Corrosion identified on several valves noted in the area. Several deficient tags to repair corrosion are dated as old as 2003. CR 2012-13972, and CR 2012-13974 are generated to deal with corroded valves. All valves are still operable.Y N U N/A x Y N U N/A x Y N U N/A x Y N U I I x Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 I Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTTAX" Area Walk-By Checklist (AWC)Room QS-AFW Pump Room Sheet 153 of 191 U Status: Y Floor El.735 Bldg. SFGB Other supporting or relevant documents and photos (if any): File Name: 1-59-1-4-'

==

Description:==

General 1 File Name: 1-60-1-4-'

==

Description:==

General 2

-Paul C. Rizzo Associates, Inc.ENGINEERS

& COMULTArTS Sheet 154 of 191 Area Walk-By Checklist (AWC)Status: Y (a U Room QS-AFW Pump Room Floor El.735 Bldg.SFGB riie Name: i-o3-1-4-3ujpeg

==

Description:==

View of fire extinguisher located in the area File Name: 1-66-1 50.jpeg

==

Description:==

Corroded valve identified.

CR-2012-13972 issued to address this condition.

C. Rizzo Associates, Inc.ENGINEERS 4& CONSULTAN1TS Sheet 155 of 191 Area Walk-By Checklist (AWC)Status: Y (8) U Room QS-AFW Pump Room Floor El.735 Bldg.SFGB HIe Name: i-o/-i-4-3u.jpeg

==

Description:==

Corroded valve identified.

CR-2012-13972 issued to address this condition.

tile Name: 1-06-1-4-2J.Jpeg

==

Description:==

Example of very old deficiency tag.

L ---- Paul C. Rizzo Associates, Inc.ENGINEERS

&. CONSULTAMTS Sheet 156 of 191 Area Walk-By Checklist (AWC)Status: Y (E) U Room QS-AFW Pump Room Floor El.735 Bldg.SFGB Pile Name: 1-69-1-4-50.jpeg

==

Description:==

Very old deficiency tag

-- Paul C. Rizzo Associates, Inc.ENGINEiRS

& CONSULTANTS Sheet 157 of 191 Area Walk-By Checklist (AWC)Status: Y a U Room QS-AFW Pump Room Floor El.735 Bldg.SFGB Pile Name: 1-/1-1-4-3U.Jpeg

==

Description:==

Scaffold identified in the area. Judged not a seismic concern.lile Name: 1-/2-1-4-3U.jpeg

==

Description:==

Fire pipe system appears secure, no risk identified.

L(Z Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN"TS Sheet 158 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Service Building Floor 725 Floor El.725 Bldg.SRVB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: IVS-F-55A FI Q Paul C. Rizzo Associates, Inc.ENOINEEPUS

& CONSUtTAN."S Sheet 159 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Service Building Floor 725 Floor El.725 Bldg.SRVB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Table in area is properly secured 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x ---I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra 0 Adam L. Helffrich 9/28/2012 I C Paul C. Rizzo Associates, Inc.ENGINEERS

& CON1U T ANM1 Area Walk-By Checklist (AWC)Room Service Buildin2 Floor 725 Sheet 160 of 191 Status: (Y)N U Floor El.725 Bldg. SRVB Other supporting or relevant documents and photos (if any): Pie Name: i-z9-i-4-)3.jpeg

==

Description:==

General rue iName: i-ou-i-3-o.jpeg

==

Description:==

Table, secured C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANITS Sheet 161 of 191 N U Area Walk-By Checklist (AWC)Status: Room Floor El.Service Building Floor 725 725 Bldg.SRVB rile Name: i-o3-i-4-odjpeg

==

Description:==

General view of cable trays in the area Ple Name: 1-00-1-4-)O.Jpeg

==

Description:==

View of cast iron pipe located in the area.

-Iq- Paul C. Rizzo Associates, Inc.ENGINEERS

&

Sheet 162 of 191 N U Area Walk-By Checklist (AWC)Status: W Room Valve Pit 688 Floor El.747 Bldg.SFGB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: MOV- 1SL-860B MOV- ISL-862A

<_ Paul C. Rizzo Associates, Inc.FLGINUERS

& Sheet 163 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Valve Pit 688 Floor El.747 Bldg.SFGB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Unsecured fire extinguishers are not considered significant.

Unsecured lifting crane hook judged not to cause unacceptable interactions.

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Found deficient tag fiom 2003.for MOV-iSI-864B.

Condition report CR-2012-13974 issued to address this condition.

Comments (Additional pages may be added as necessary)

Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Evaluated by: Date: 9/28/2012 Eddie M. Guerra Ila Date: 9/28/2012 Adam L. Helffrich LC' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANMT Sheet 164 of 191 N U Area Walk-By Checklist (AWC)Status: &)Room Valve Pit 688 Floor El.747 Bldg.SFGB Other supporting or relevant documents and photos (if any): File Name: 1-59-1-4-58.jpeg

==

Description:==

General 1 File Name: 1-6U-1-4-5.jpeg

==

Description:==

General 2 L Q Paul C. Rizzo Associates, Inc.ENGINERS & CONSI Area Walk-By Checklist (AWC)Room Valve Pit 688 Floor El. 747 Bid Sheet 165 of 191 Status: (Y)N U g.SFGB File Name: 1-65-1-4-58.jpeg

==

Description:==

Lifting hook unsecured.

Judged not to cause interaction concerns.File Name: 1-66-1-4-58.jpeg

==

Description:==

Fire extinguisher

-Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANh~

Sheet 166 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Valve Pit 688 Floor El.747 Bldg.SFGB rile Name: 1-o/-i-4-3;.jpeg

==

Description:==

Fire extinguisher rue iame: 1-oYi-I-o-.jpeg

==

Description:==

Deficient tag out of date.

L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'TS Sheet 167 of 191 N U Area Walk-By Checklist (AWC)Status: W)Room Fuel Building Floor El.735 Bldg.FULB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Small gap under base of/one of the saddles of heat exchanger FC-E-lB judged not be an issue of concern.2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Temp. gage TI-IFC-102B is on a 6"diam. nozzle out ofHXFC-E-1B.

There is a gap of-3/l 6" between this temp. gage and rigid HVA C support. It is judged that the nozzle piping and HVA C support would not displace by 3/16" in a seismic event and this interaction is not credible.Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A X Related equipment on SWEL for this area: 1 FC-E- IA IFC-P-1A IPC-145 IPC-IFC-102A

'I Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN"T Sheet 168 of 191 N U Area Walk-By Checklist (AWC)Status: (W)Room Fuel Building Floor El.735 Bldg.FULB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?A space heater and its attachedpiping in the area are rod hung. Displacement of this heater in a seismic event would cause an interaction between its inlet piping and nearby large diameter pipe, which could potentially cause spray concern in the area.Lighting transformer L TG- TFMR-F2 and lighting panel A C-LTG-PNL-F2 are judged to be outside of the spray zone of this piping andjudged acceptable.

Also, no flooding concern for this area is identified

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Unsecured fire extinguisher and posts do not pose seismic interactions.

Scaffold in area is judged acceptable.

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?One often bolts connecting the bonnet of manual valve 1CCR-106 to its body does not have full thread engagement (approximately one-half thread is not engaged).

Judged acceptable, as the valve is very light and has a very low moment arm. Similar thread engagement issue observed at Valve FC-E-JB and judged acceptable as-is.Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 Fvl'-ýSheet 169 of 191 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSI LTANIS Area Walk-By Checklist (AWC)Status: T)N U Room Fuel Building Floor El.735 Bldg.FULB Other supporting or relevant documents and photos (if any): Pile Name: l-9Y-3-4-tU.jpeg

==

Description:==

General tile Name: i-ou--i-4-ofl.jpeg

==

Description:==

General 2 L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 170 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Fuel Building Floor El.735 Bldg.FULB Vlle Name: 1-6b-3--4-6U.jpeg

==

Description:==

Nut at 12 o'clock not engaged on underside.

Judged acceptable.

rue Name: 1-oo-j-4-ou.jpeg

==

Description:==

Underside of not engaged nut. Judged acceptable.

Fvl_ýSheet 171 of 191 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Area Walk-By Checklist (AWC)Status: (Y N U Room Fuel Building Floor El.735 Bldg.FULB Pile Name: l-t/-i-4-tU.Jpeg

==

Description:==

One nut with one-half thread engagement missing, judged acceptable.

Pile Name: l-bs-3-4-uj0peg

==

Description:==

Small gap under base of FC-E-1B judged not a concern.

I Q Paul C. Rizzo Associates, Inc.ENGINEERS r CONSULTAN"S Sheet 172 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Fuel Building Floor El.735 Bldg.FULB rlue Name: I-69-3-4-bU.jpeg

==

Description:==

Fire extinguisher in area rne iName: i-/o-i-4-ou.jpeg

==

Description:==

Temperature gage near HVAC supports judged acceptable Paul C. Rizzo Associates, Inc.EN GINEERS & CONSULTTNIS Area Walk-By Checklist (AWC)Room Fuel Buildin2 Sheet 173 of 191 Status: (Y N U Floor El.735 Bldg.FULB File Name: 1-72-3-4-60.jpeg

==

Description:==

Scaffold in area is adequately braced.

'Ile Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 174 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Fuel Building Floor El.735 Bldg.FULB rite Name: i-/4-i--4-o.jpeg

==

Description:==

Posts located near component.

Judged not a significant seismic concern.rue iName: i- /l -,--ou.jpeg

==

Description:==

Thread engagement at heat exchanger FC-E- 1 B nozzle is judged acceptable.

I Paul C. Rizzo Associates, Inc.ENGNEERS & CONSULTANTS Sheet 175 of 191 N U Area Walk-By Checklist (AWC)Status: (N)Room Fuel Building Floor El.735 Bldg.FULB rne Name: j-/o-i-q-ou.jpeg

==

Description:==

Cart, ladder, and fire pipe, all secured, judged a non issue.rue Name: I-//-i-4-ou.jpeg

==

Description:==

View of space heater in the area.

I2CQ Paul C. Rizzo Associates, Inc.ENGrNEERS

& CONSULTANTS Sheet 176 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Fuel Building Floor El.735 Bldg.FULB rne iName: i-Ia-Ji-q-ou.jpeg

==

Description:==

Lighting transformer and lighting panel are judged to be outside of potential spray hazard zone of the space heater IL .Paul C. Rizzo Associates, Inc.ENGINEERS

&

Sheet 177 of 191 N U Area Walk-By Checklist (AWC)Status: W Room Aux bldg768 Floor El.768 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Block wall AB4-2, and AB4-3 are adequate by reference DSC-0055, and DSC-0056, respectively.

These calculations are part of a follow-up seismic analysis in support of IE80-11 calculations.

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: CH-BL-2 Paul C. Rizzo Associates, Inc.LNGINEERS

& CONSULTAN'S Sheet 178 of 191 Area Walk-By Checklist (AWC)Status: (Y) N U Room Aux bldg768 Floor El.768 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Water heater in area is not secured and may tip and spill. Spillfrom water heater is minor and is not considered a significant risk.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Fire extinguisher in area unsecured, considered not significant.

Gas bottles in the area are secured with only one chain at top and are judged acceptable as they do not cause any interaction concerns.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I Comments (Additional pages may be added as necessary) d Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: 9/28/2012 Adam L. Heliffrich L I Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 179 of 191 N U Area Walk-By Checklist (AWC)Status: W Room Aux bldg768 Floor El.768 Bldg.AXLB Other supporting or relevant documents and photos (if any):

Description:

General rile lName: l-oU---,t-ou.Jpeg

==

Description:==

Fire pipe looks secured judged a non issue LXQ Paul C. Rizzo Associates, Inc.ENGINEERS

& COSUI2TAX*h Sheet 180 of 191 N U Area Walk-By Checklist (AWC)Status: w)Room Aux bldg768 Floor El.768 Bldg.AXLB lile Name: l-t3-4-4-tU.Jpeg

==

Description:==

Unsecured poles, not heavy significant File Name: 1-66-4-4-60.jpeg

==

Description:==

Fire extinguisher in area and chained gas bottle judged not to be interaction concerns K qC Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 181 of 191 Area Walk-By Checklist (AWC)Status: ()N U Room Aux bldg768 Floor El.768 Bldg.AXLB tile Name: 1-67-4-4-60.jpeg

==

Description:==

Block wall in area kile Name: 1-6N-4-4-60.jpeg

==

Description:==

Unsecured water heater may fall and flood Paul C. Rizzo Associates, Inc.ENGINEERS

& COrSULTAN" Sheet 182 of 191 N U Area Walk-By Checklist (AWC)Status: W Room West Cable Vault -SE Comer Floor El.735 Bldg.SFGB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Cable Tray above MCC-EJ 1 is rod hung with minimal lateral support. Expected swing of about 2.5 inches is less than the available gap of'3.5 inches and therefrre judged acceptable.
4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x 77771 Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: IFW-PNL- IOOB I Q Paul C. Rizzo Associates, Inc.ENGINEIRS

& CONSULTMI%-

Sheet 183 of 191 N U Area Walk-By Checklist (AWC)Status: W)Room West Cable Vault -SE Comer Floor El.735 Bldg.SFGB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?AIl piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Ladder poorly secured at ladder station 34. Fire extinguishers in area are unsecured.

These potential interactions arejudged not credible.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x --F Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra P A-/ Date: 9/28/2012 Adam L. Helffrich

-Paul C. Rizzo Associates, Inc.ENGINEERS

&

Area Walk-By Checklist (AWC)Room West Cable Vault -SE Comer Sheet 184 of 191 Status: (w N U Floor El.735 Bldg. SFGB Other supporting or relevant documents and photos (if any): rite Name: i-3Y-I-4-oujpeg

==

Description:==

General rue Nuame: -ouu-+-,4-ou.Jpeg

==

Description:==

General 2 I2C--j Paul C. Rizzo Associates, Inc.EWINEIP-5

& CONSULTAN-T Sheet 185 of 191 N U Area Walk-By Checklist (AWC)Status: Y)Room West Cable Vault -SE Comer Floor El.735 Bldg.SFGB rile rName: i-w-j-4-ou.jpeg

==

Description:==

Poorly secured ladder at ladder station 34 rie Name: l-00-1-4-tU.jpeg

==

Description:==

Fire extinguisher unsecured in area L[Q Paul C. Rizzo Associates, Inc.ENU1NýftS

& MOSULTAJ, Sheet 186 of 191 N U Area Walk-By Checklist (AWC)Status: (Y Room West Cable Vault -SE Comer Floor El.735 Bldg.SFGB File Name: 1-67-1-4-60.jpeg

==

Description:==

Cable tray is rod hung with minimal lateral support.File Name: 1-68-1-4-60.jpeg

==

Description:==

MCC-E 11 and nearby cable tray Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN-S Area Walk-By Checklist (AWC)Room West Cable Vault -SE Comer Floor El. 735 Bldg.Sheet 187 of 191 Status: (w)N U SFGB rne rName: 1-oV-I-4-OU.jpeg

==

Description:==

MCC-E II and nearby cable tray q2Cr Paul C. Rizzo Associates, Inc.ENGINEERBS

r. CONSULTAN,1S Sheet 188 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Relay Room Floor El.713 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: PNL-AC 1-BUS- 1E Paul C. Rizzo Associates, Inc.ENGINfEERS

& CONSULITAND Sheet 189 of 191 Area Walk-By Checklist (AWC)Status: W N U Room Relay Room Floor El.713 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 9/28/2012 Eddie M. Guerra_ ¢Date: 9/28/2012 Adam L. Helffrich Paul C. Rizzo Associates, Inc.L4CINEERS

& COMSULTAWI" Sheet 190 of 191 N U Area Walk-By Checklist (AWC)Status: CK)Room Relay Room Floor El.713 Bldg.AXLB Other supporting or relevant documents and photos (if any): rue iName: i-oY-3--q-ou.jpeg

==

Description:==

General 1 File Name: 1-60-5-4-60.jpeg

==

Description:==

General 2 Paul C. Rizzo Associates, Inc. Sheet 191 of 191 ENGINEERS

& CONSULTANII Area Walk-By Checklist (AWC)Status: &N U Room Relay Room Floor El.713 Bldg.AXLB File Name: 1-65-5-4-60.jpeg

==

Description:==

Fire extinguisher File Name: 1-66-5-4-60.jpeg

==

Description:==

Fire extinguisher APPENDIX D COMPONENT LIST FOR ANCHORAGE CONFIGURATION CHECK Component ID References 1CC-E-IA Drawings RV-0076A and RV-0076B 1EE-EG-1 Calculation 52233-C-018, page 4/17 1EE-EG-2 Calculation 52233-C-018, page 4/17 1VS-F-55A Vibration Eliminator Calculation for Models 55A-B BAT-1-1 Drawing 8700-1.24-1E and Calculation 52233-C-016 BAT-1-2 Drawing 8700-1.24-1E and Calculation 52233-C-016 BAT-CHG-I-1 Calculation DSC-6698 CH-P-1C Calculations CH-P-lC and 52233-C-007 CH-TK-1A Calculation 52233-C-031 DC-SWBDIAI Calculation 52233-C-014 DC-SWBDI-2 Calculation 52233-C-014 DC-SWBD1-3 Calculation 52233-C-014 DC-SWBD 1-4 Calculation 52233-C-014 EE-P-1A Calculation 52233-C-007 EE-TK-2A Drawing RS-0019Q FW-P-2 Drawing 08700-02.040-0005, Rev. E.Drawing 02.040-001 1B FW-P-3A Drawing 8700-RC-21M Calculation 52233-C-007 INV-VITBUS 1-1 Drawing RE-0038D Calculation 52233-C-017 INV-VITBUS1-3 Drawing RE-0038D Calculation 52233-C-017 INV-VITBUS 1-4 Drawing RE-0038D Calculation 52233-C-017 MCC-1-E1 Calculation 52233-C-001 MCC-1-E12 Calculation 52233-C-001 MCC-I-E13 Calculation 52233-C-002 MCC-1-E6 Calculation 52233-C-001 MCC-1-E7 Calculation 52233-C-001 MCC-1-E8 Calculation 52233-C-001 PNL-1MS-101A PNL-1MS-101A SEWS PNL-1MS-101B PNL-1MS-101B SEWS PNL-DC1-3 Calculation PNL-DC1-3 Calculation 52233-C-015 D-1 Component ID References PNL-DGEA-1 PNL-DGEA-1 SEWS Calculation 52233-C-022 PNL-DIGEN-1 PNL-DIGEN-1 SEWS Calculation 52233-C-025 PNL-DIGEN-2 PNL-DIGEN-2 SEWS Calculation 52233-C-025 REAC-TR-SWGR-1A Calculation 52233-C-003 RK-AUX-RPTST-A RK-AUX-RPTST-A SEWS Calculation 52233-C-023 RK-NUC-INS-1 Calculation 52233-C-023 TRANS-1-8N1 Calculation 52233-C-006 VS-F-57B Calculation 52233-C-010 WR-P-1A Drawing 2C-5011 Calculation 52233-C-008 WR-P-1B Drawing 2C-5011 Calculation 52233-C-008 D-2 APPENDIX E MASONRY BLOCK WALLS VERIFIED UNDER IE BULLETIN 80-11 Elevation Building Wall Seismically Reference Elevation Building Wall_ Analyzed SBI-10 Yes Calculation DSC-0089 I SB 1-11 Yes Calculation DSC-0090 SB 1-12 Yes Calculation DSC-0091 SB1-13 Yes Calculation DSC-0092 SB 1-14 Yes Calculation DSC-0089 2 SB 1-15 Yes Calculation DSC-0093 SB 1-1 Yes Calculation DSC-0080 SERVICE 713'-6" BUILDING SB 1-2 Yes Calculation DSC-0081 SB 1-3 Yes Calculation DSC-0082 SB 1-4 Yes Calculation DSC-0083 SB 1-5 Yes Calculation DSC-0084 SB 1-6 Yes Calculation DSC-0085 SB 1-7 Yes Calculation DSC-0086 SB 1-8 Yes Calculation DSC-0087 SB 1-9 Yes Calculation DSC-0088 722'-6" AUX.BUILDING AB1-1 Yes Calculation DSC-0001 AB 1-3 Yes Calculation DSC-0002 AB 1-4 Yes Calculation DSC-0003 AB 1-5 Yes Calculation DSC-0004 AB 1-6 Yes Calculation DSC-0005 AB 1-7 Yes Calculation DSC-0006 AB 1-8 Yes Calculation DSC-0007 AB 1-9 Yes Calculation DSC-0008 AB 1-10 Yes Calculation DSC-0009 AB 1-11 Yes Calculation DSC-0010 ABI-12 Yes Calculation DSC-001 1 AB 1-13 Yes Calculation DSC-00 12 AB 1-14 Yes Calculation DSC-00 13 ABI-15 Yes Calculation DSC-0014 ABI-16 Yes Calculation DSC-0015 AB 1-17 Yes Calculation DSC-00 16 AB 1-18 Yes Calculation DSC-00 17 ABI-19 Yes Calculation DSC-0018 AB 1-20 Yes Calculation DSC-00 19 AB 1-21 Yes Calculation DSC-1-21 AB 1-22 Yes Calculation DSC-0021 E-1 Elevation Building Wall Seismically Reference Analyzed AB 1-23 Yes Calculation DSC-0022 AB 1 -24 1 Yes Calculation DSC-0023 AB 1-25 No Wall N/A AB 1-26 Yes Calculation DSC-0024 AB 1-27 Yes Calculation DSC-0025 AB 1-28 Yes Calculation DSC-0026 AB 1-29 Yes Calculation DSC-0027 AB 1-30 Yes Calculation DSC-0028 AB 1-31 Yes Calculation DSC-0029 AB 1-32 Yes Calculation DSC-0030 AB1-33 Yes Calculation DSC-0031 AB 1-34 Yes Calculation DSC-0032 CV 1-1 Yes Calculation DSC-0069 CV 1-2 Yes Calculation DSC-0070 CV 1-3 Yes Calculation DSC-0071 CABLE VAULT CV 1-4 Yes Calculation DSC-0072 VAULT CV-5 Yes Calculation DSC-0073 CV1-6 Yes Calculation DSC-0074 CV 1-7 Yes Calculation DSC-0075 SERVICE 725'-6" BUIDN SB2-1 Yes Calculation DSC-0094 BUILDING 735'-6" AB2-1 Yes Calculation DSC-0035 AB2-2A Yes Calculation DSC-0036 AB2-2B Yes Calculation DSC-0037 A132-3 Yes Calculation DSC-0038 AUX.BUII AB2-4 Yes Calculation DSC-0039 BUILDING AB2-5 Yes Calculation DSC-0040 AB2-6 Yes Calculation DSC-0041 AB2-7 Yes Calculation DSC-0042 AFB2-8 Yes Calculation DSC-0043 FUEL FB 1-1 Yes Calculation DSC-0078 BUILDING FB 1-2 Yes Calculation DSC-0079 SERVICE SB3-1 Yes Calculation DSC-0095 I BUILDING SB3-10 Yes Calculation DSC-0 105 SB3-11 Yes Calculation DSC-0105 SB3-12 Yes Calculation DSC-0106 SB13-13 Yes Calculation DSC-0107 SB3-2 Yes Calculation DSC-0096 S133-3 Yes Calculation DSC-0097 E-2 Elevation Building Wall Seismically Reference Analyzed SB3-4 Yes Calculation DSC-0098 SB3-5 Yes Calculation DSC-0099 1 SB3-6 Yes Calculation DSC-0100 SB3-7 Yes Calculation DSC-0101 SB3-8 Yes Calculation DSC-0102 SB13-9 Yes Calculation DSC-0 103 CABLE CV2-1 Yes Calculation DSC-0076 VAULT CV2-2 Yes Calculation DSC-0077 AUX. AB 1-35 Yes Calculation DSC-0033.743-6 BUILDING AB 1-36 Yes Calculation DSC-0034 AB3-1 Yes Calculation DSC-0044 AB3-10 Yes Calculation DSC-0053 AB3-11 Yes Calculation DSC-0053Z AB3-2 Yes Calculation DSC-0045 AB3-3 Yes Calculation DSC-0046 AUX.752'-6" BUILDING AB3-4 Yes Calculation DSC-0047 AB3-5 Yes Calculation DSC-0048 AB3-6 Yes Calculation DSC-0049 AB3-7 Yes Calculation DSC-0050 AB3-8 Yes Calculation DSC-0051 AB3-9 Yes Calculation DSC-0052 AB4-1 Yes Calculation DSC-0054 AB4-10 Yes Calculation DSC-0063 AB4-11 Yes Calculation DSC-0064 AB4-12 Yes Calculation DSC-0065 AB4-13 Yes Calculation DSC-0066 AB4-14 Yes Calculation DSC-0067 AB4-15 Yes Calculation DSC-0068 768AUX'-7 AUX. AB4-2 Yes Calculation DSC-0055 BUILDING AB4-3 Yes Calculation DSC-0056 AB4-4 Yes Calculation DSC-0057 AB4-5 Yes Calculation DSC-0058 AB4-6 Yes Calculation DSC-0059 AB4-7 Yes Calculation DSC-0060 AB4-8 Yes Calculation DSC-0061 AB4-9 Yes Calculation DSC-0062 E-3