ML13008A044
ML13008A044 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 10/31/2012 |
From: | Guerra E M, Helffrich A L Paul C. Rizzo Associates, ABS Consulting, FirstEnergy Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
References | |
F1, L-12-283 | |
Download: ML13008A044 (79) | |
Text
LCZ' Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 162 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. F]Equipment Description Equip. Class 2. Low Voltage Switchgear BUS FlI, Low Voltage Switchgear Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Component composed of 7 sections.
Inspected two end sections at front and verified two plug welds -3/4" diameter.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Base grout found in good condition.
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Verification based on adequacy per SQUG calc C-CSS-FJ.SQUG calculations show anchorage to be adequate fom previous outlier resolution, page 9 of 28.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N II X I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 7 x Y N U x I I Lc'Y Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 163 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. F1 Equipment Description Equip. Class 2. Low Voltage Switchgear BUS FlI, Low Voltage Switchgear Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X Y N U N/A x Y N U x II Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U X II --Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich UKY Paul C. Rizzo Associates, Inc.Sheet 164 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Fl Equipment Description BUS Fl Equip. Class 2. Low Voltage Switchgear 1, Low Voltage Switchgear Other supporting or relevant documents and photos (if any): Fl general (plate inaccessible)
General view of component Fl anchorage inaccessible U -- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 165 of 379 StatusQN U Seismic Walkdown Checklist (SWC) No Equipment IDNo. F108-1 Equipment Description Equip. Class Oc. Other -sub-component EDG 1-1 INTAKE FILTER Location:
Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage could not be verified since it was fully covered by roof cover.SQUG Calc C-CSS-F108 taken as reference for anchorage condition.
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?No detail provided in calc. Unable to view during inspection.
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y N II x I Y N U N/A__FI I X Y N U N/A x Y N U N/A__F _ x Y N U N/A x Y N U 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?
Outlier specified in calculation C-CSS-FI08 with respect to anchorage capacity Calculation provides an outliner close out note specifying a modification
(#MAOD 95-0029) for additional anchors.
I -%--< Paul C. Rizzo Associates, Inc.Sheet 166 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. F108-1 Equipment Description Equip. Class Oc. Other -sub-component EDG 1-4 INTAKE FILTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Filter cover deemed to be capable of resisting external hazards.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 UldZM Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 167 of 379 StatusQN U Seismic Walkdown Checklist (SWC)U Equipment ID No. F108-1 Equipment Description Equip. Class Oc. Other -sub-component EDG I1-I INTAKE FILTER Other supporting or relevant documents and photos (if any): F 108-1 plate ID F108-1 general ID Plate of component General view of component F 108-i Encasing Anchroage View of Intake encasing anchroage condition.
U --" Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 168 of 379 Statu e" N U Seismic Walkdown Checklist (SWC)Equipment ID No. Fl IA Equipment Description Equip. Class 1. Motor Control Centers MCCFIIA Location:
Bldg.AUXB Floor El. 603 Room 427 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
This is an 11 section MCC, welded to embed channels with an average of at least 5" long, 3/16"fillet welds per section (front and back).2. Is the anchorage free of bent, broken, missing or loose hardware?No degraded conditions found for base stitch welds.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Separation found on base grout at end of cabinet.Identified as an aestetic concern, therefore no significant adverse effect.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Stitch weld detail verified in detail 15 of drawing C-0233 and confirmed to be consistent with walkdown inspection (drawing 1/4" weld 3-6oc). SQUG Calculation C-CSS-FI IA provides qualification of as-installed welded anchorage.
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I L[Y Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANIrS Sheet 169 of 379 Statu('2 N U Seismic Walkdown Checklist (SWC)Equipment IDNo. F! IA Equipment Description Equip. Class 1. Motor Control Centers MCC Fl IA Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Nearby ladder found with poor tie-off, but judged not a potential hazard to this MCC 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Attached top conduits provide adequate top bracing to MCC.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Adjacent panels CDFJ IA-I and CDFI IA-2 have a gap ofr-/4" to this MCC, but the top connection of these panels to the MCC negates any interaction potential.
Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x T I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 L-ND Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 170 of 379 StatusQN U Seismic Walkdown Checklist (SWC) %L Equipment ID No. FI IA Equip. Class 1. Motor Control Centers Equipment Description MCC F1 IA Other suppor ny): r i IA piate ID Plate of component F I IA general General view of component LcQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 171 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FIIA Equipment Description Equip. Class I. Motor Control Centers MCC Fl IA F I I A stitch weld Partial view of anchorage, view is typical of all anchors Fl IA rigid connection to adjoining conduit and MCC A rigid connection is used to fasten the unit to adjoining conduit LCQ Paul C. Rizzo Associates, Inc.Sheet 172 of 379 ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. FlIA Equip. Class 1. Motor Control Centers Equipment Description MCC Fl IA I I FI I A crack in base of grout on comer Separation in base grout. Appears to be aestetic grout only.FI I A poorly secured ladder in area of MCC Ladder loosely tied off.
I-Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 173 of 379 StatuQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FI-2 Equipment Description Equip. Class 0. Other Traveling water screen F !-2 Location:
Bldg.INTK Floor El. 585 Room 50 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y 1. Is the anchorage configuration verification required (i.e., is the item one L___of the 50% of SWEL items requiring such verification)?
Y 2. Is the anchorage free of bent, broken, missing or loose hardware?
L X Y 3. Is the anchorage free of corrosion that is more than mild surface E oxidation?
Slight corrosion identified in bolts due to humid environment.
Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? IX Y 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y 6. Based on the above anchorage evaluations, is the anchorage free of 1X potentially adverse seismic conditions?
Although slight corrosion found on screen mounting base, no significant degraded condition was identified during inspection.
N XJll N U N/A N U N/A N U N/A N U N/A F -T X N z UI~
Paul C. Rizzo Associates, Inc.Sheet 174 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. FI-2 Equipment Description Equip. Class 0. Other Traveling water screen FI-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Rigidly attached lines, no concern of differential displacement.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I 1 : Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x T -I Comments (Additional pages may be added as necessary)
Inside of screen housing was accessible and no degraded condition was identified Motor located on top of screen housing found in adequate condition.
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 I -- Paul C. Rizzo Associates, Inc.Sheet 175 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FI-2 Equipment Description Travelii Equip. Class 0. Other ng water screen FI1-2 Other supporting or relevant documents and photos (if any): i j -4, piadL ID Plate of component r I-L generai General view of component L Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 176 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. FI-2 Equipment Description Equip. Class 0. Other Traveling water screen F 1 -2 F 1-2 anchorage Partial view of anchorage, view is typical of all anchors Fl-I inside Fl-I is opened for inspection because it is more visible than F 1-2 LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 177 of 379 StatusQ7,Y U Seismic Walkdown Checklist (SWC)Equipment IDNo. F12A Equipment Description Equip. Class 1. Motor Control Centers MCC F12A Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y N 1. Is the anchorage configuration verification required (i.e., is the item one [ Xi IiI of the 50% of SWEL items requiring such verification)?
This is an 8 section MCC, but it is in-line with two other MCC sections (MCC F14 and MCC FI5).It was verified that all adjacent sections are bolted together.
Each section of MCC is welded to embed channels at front and back with an average of at least 5" long, 3/16"fillet welds.2. Is the anchorage free of bent, broken, missing or loose hardware?
[No degraded conditions found for base stitch welds.3. Is the anchorage free of corrosion that is more than mild surface E oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? [No cracks identified in sloped grout at mounting base.5. Is the anchorage configuration consistent with plant documentation?
E (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
SQUG Calculation C-CSS-FI2A provides qualification of as-installed welded anchorage.
- 6. Based on the above anchorage evaluations, is the anchorage free of E potentially adverse seismic conditions?
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U~I 2cM Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrS Sheet 178 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. F12A Equipment Description Equip. Class 1. Motor Control Centers MCC F12A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Top entry conduit rigidly supported to back wall.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
This 8 section MCC is adjacent to MCC FI 4 and MCC FJ5. These MCCs were opened and inspected It was verified that these MCCs are bolted together.
At the south end of this MCC, there is a 1.5" gap to panel CDF12A-1, which is judged acceptable to preclude pounding.Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 D O Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 179 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. FI2A Equipment Description Equip. Class 1. Motor Control Centers MCC FI2A Other supporting or relevant documents and photos (if any): r izA piate ID Plate of component F I2A general General view of component UcQ Paul C. Rizzo Associates, Inc.Sheet 180 of 379 ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusVN U Equipment DMNo. F12A Equipment Description Equip. Class 1. Motor Control Centers MCC F12A F12A stitch weld Partial view of anchorage, view is typical of all anchors LU ---Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 181 of 379 StatusQN U Seismic Walkdown Checklist (SWC) ýEquipment ID No. FI2D Equipment Description Equip. Class 1. Motor Control Centers MCC F12D Location:
Bldg.INTK Floor El. 576 Room 52 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y N 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
This a single section MCC welded to embed with an average of 9" of 3/16"fillet welds atfront and back.No degraded condition found around cabinet base.2. Is the anchorage free of bent, broken, missing or loose hardware?
L 3. Is the anchorage free of corrosion that is more than mild surface L.oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? L_No significant cracks identified around cabinet mounting base.5. Is the anchorage configuration consistent with plant documentation?
L_(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Since cabinet could not be opened, configuration is verified based on SQUG calculation C-CSS-FI2D.
This calculation evaluates anchorage based on calculation C-CSS-EI2C which conlcudes anchorage configuration is adequate.6. Based on the above anchorage evaluations, is the anchorage free of L_potentially adverse seismic conditions?
Outlier close out note (C-CSS-FI2D, page 7 of 7) indicates comparison w/ E12C has shown anchorage is adequate.
Anchorage is also checked with section L of drawing C-0412B and confirmed to be consistent with walkdown inspection.
Y N U N/A X Y N U N/A x Y N U N/A x Y N U N/A x Y N U x II I?Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 182 of 379 StatusQN U Seismic Walkdown Checklist (SWC)N10 Equipment ID No. F12D Equipment Description Equip. Class 1. Motor Control Centers ACC F12D Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
K Potential interaction hazard due to near by fire extinguishers without adequate wall fixity. It was agreed that no significant effect expected during seismic event.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, L and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? I 10. Based on the above seismic interaction evaluations, is equipment free E of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U X I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 D --- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 183 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment DMNo. F12D Equipment Description Equip. Class 1. Motor Control Centers MCC F12D Other supporting or relevant documents and photos (if any): F I2D plate ID Plate of component r i LL generai General view of component F I2D anchorage Mounting base detail with embedded channel FI2D fire ext to right Potential interaction hazard from fire extinguisher in the vicinity of component.
L07Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 184 of 379 StatuQN U Seismic Walkdown Checklist (SWC) ýEquipment IDNo. FD1062 Equipment Description Equip. Class 0. Other FIRE DAMPER FD 1062 Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Component attached to ceiling and braced to wall with HSS sections.2. Is the anchorage free of bent, broken, missing or loose hardware?Damper vertical supports connected to upper floor decking between ribs.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Damper found adequately supported against lateral movement.
HSS sections found in adequate condition.
No signs of corrosion observed on support members.El NL Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I <-Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 185 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. FD1062 Equipment Description Equip. Class 0. Other FIRE DAMPER FD 1062 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Electric line connected with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x I I I Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich
[L ý- Paul C. Rizzo Associates, Inc.Sheet 186 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FD1062 Equipment Description FIRE D Equip. Class 0. Other AMPER FD 1062 Other supporting or relevant documents and photos (if any): FD1062 FD1062 anchorage General view of component View of anchorage 1-1% Paul C. Rizzo Associates, Inc.Sheet 187 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FIS 1612 Equipment Description Equip. Class 20. Instrument and Control Panels SFP HX I FIS-1612 Cool Water Outlet Flow Indicating Switch Location:
Bldg.AUXB Floor El. 590'6" Room 312 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Floor mounted rack found in adequate condition anchored with 4-1/2" diam bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
No signs of corrosion found on anchor bolts and bottom-J/2" plate.4. Is the anchorage free of visible cracks in the concrete near the anchors?No visible cracks on grout for bottom plate anchorage.
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y Nh Y N U N/A x Y N U N/A X Y N U N/A X Y N U N/A--F -I x Y N U x I I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Anchor spacing to adjacent floor mounted rack is judged adequate.
LIQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 188 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FIS 1612 Equipment Description Equip. Class 20. Instrument and Control Panels SFP HX I FIS-1612 Cool Water Outlet Flow Indicating Switch Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Block walls 3257 and 3267 verified to be to be seismically adequate based on ref VBWI6-BOO1-083, Rev 2 (4/27/88) and VBWJ6-BO01-084, Rev 5 (4/27/88).
- 9. Do attached lines have adequate flexibility to avoid damage?Flexible line and small piping were identified with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich I-% Paul C. Rizzo Associates, Inc.Sheet 189 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FIS 1612 Equipment Description SFP H)Equip. Class 20. Instrument and Control Panels 1 FIS-1612 Cool Water Outlet Flow Indicating Switch Other supporting or relevant documents and photos (if any): Ilg FIS1612 plate ID Plate of component PiliSoiz general General view of component Uc------z Paul C. Rizzo Associates, Inc. Sheet 190 of 379 ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusN U Equipment ID No. FIS 1612 Equipment Description Equip. Class 20. Instrument and Control Panels SFP HX 1 FIS-1612 Cool Water Outlet Flow Indicating Switch FIS1612 anchorage View of anchorage FIS 1612 adjacent masonry wall Potential interaction hazard from masonry wall near unit UOZ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 191 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FTHP3C Equipment Description Equip. Class 18. Instrument (on) Racks FLOW TRANSMITTER FT HP-3C Location:
Bldg.AUXB Floor El. 565 Room 208 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Mounted on tube section 6x6 which is attached to concrete wall with four 1/2" diameter anchors. The lightweight transmitter
(<-20 ibs) is attached to the rack with four 3/8" diameter machine bolts. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?Supporting wall tubes found in good condition.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
No signs of corrosion found on mounting support and piping 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks identified on wall near flow transmitter.
- 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N Y N U N/A x Y N U N/A x Y N U N/A X Y N U N/A-T X Y N U X II LcQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANI'S Sheet 192 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FTHP3C Equipment Description Equip. Class 18. Instrument (on) Racks FLOW TRANSMITTER FT HP3C Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Small piping connected to transmitter found with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No potential interaction identified on the vicinity of component.
Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Pipe lines rigidly attached to containment wall. No adverse effects due to differential motion are expected Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich LKIQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAW'S Sheet 193 of 379 StatusQDN U Seismic Walkdown Equipment ID No.Equipment Descripti Checklist (SWC)FTHP3C Equip. Class 18. Instrument (on) Racks on FLOW TRANSMITTER FT HP3C Other supporting or relevant documents and photos (if any): FTHP3C FTHP3C General ID Plate of component General view of component LKQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 194 of 379 Status: 6)N U Seismic Walkdown Checklist (SWC)Equipment ID No. FV6451 Equipment Description Equip. Class 8B. Solenoid Valves PSOLENOID VALVE AF6451 Location:
Bldg.AUXB Floor El. 565 Room 238 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Installed on a 4" diameter pipe line.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Valve and main pipe line found with no signs of corrosion.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Main pipe line adequatelly supported No excessive unsupported lengths identified Y N I X Y N U N/A-- I- I X Y N U N/A-I x Y N U N/A-I x Y N U N/A-I x Y N U x I I Paul C. Rizzo Associates, Inc.Sheet 195 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FV6451 Equipment Description Equip. Class 8B. Solenoid Valves SOLENOID VALVE AF645 1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No block walls or potential interaction hazard identified in the area.9. Do attached lines have adequate flexibility to avoid damage?Lines connected with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x II Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x II I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich
[O Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrS Sheet 196 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FV6451 Equipment Description SOLEN'Equip. Class 8B. Solenoid Valves IOID VALVE AF6451 Other supporting or relevant documents and photos (if any): FV-6451 Plate ID Plate of component FV-64-5 I Leneral2 General view of component LS1"Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 197 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. FV6452 Equipment Description Equip. Class 8B. Solenoid Valves SOLENOID VALVE AF6452 Location:
Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Mounted on pipe line spannig around I Oft.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Valve and pipe line found with good surface condition and no signs of corrosion.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
ZEIN Y N U N/A Y I U X Y N U N/A Y N U N/A X Y N U N/A X Y N U x II
[L-7Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 198 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FV6452 Equipment Description Equip. Class 8B. Solenoid Valves SOLENOID VALVE AF6452 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibiliy.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich I <_ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 199 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. FV6452 Equipment Description SOLEN Equip. Class 8B. Solenoid Valves OID VALVE AF6452 Other supporting or relevant documents and photos (if any): V V0432 general General view of component I -L- ePaul C. Rizzo Associates, Inc.Sheet 200 of 379 ENGINEERS
& CONSULTANTS Status:Q6N U Seismic Walkdown Checklist (SWC)Equipment IDNo. HIS 5889A Equipment Description A Equip. Class 20. Instrument and Control Panels~FP TURB 1-1 STEAM INLET VALVE inside PNL C5 709 Location:
Bldg.AUXB Floor El. 623 Room 505 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Inside Panel C5 709, which has similar anchorage to Panel C5 702.Back panel doors are adequately attached to panel structure with 4-1/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?None observed 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
None observed 4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LK- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 201 of 379 Status:QN U Seismic Walkdown Checklist (SWC)Equipment ID No. HIS 5889'Equipment Description k Equip. Class 20. Instrument and Control Panels AFP TURB 1-1 STEAM INLET VALVE inside PNL C5709 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I Comments (Additional pages may be added as necessary)
Eddie M. Guerra Evaluated by: Date: 7/25/2012 Adam L. Helffrich Date: 7/25/2012 KY Paul C. Rizzo Associates, Inc.Sheet 202 of 379 ENGINEERS
& CONSULTANTS Status:QN U Seismic Walkdown Checklist (SWC)Equipment ID No. HIS 7528 Equipment Description Equip. Class 20. Instrument and Control Panels SFAS CHANNEL I BLOCK SW inside PNL C5705 Location:
Bldg.AUXB Floor El. 623 Room 505 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Inside Panel C5705, which has similar anchorage to Panel C5702.Back panel doors are adequately attached to panel structure with 4-1/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?None observed 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
None observed 4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N LZI xI I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LC4Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 203 of 379 StatusO N U Seismic Walkdown Checklist (SWC) V Equipment ID No. HIS 7528 Equipment Description Equip. Class 20. Instrument and Control Panels SFAS CHANNEL I BLOCK SW inside PNL C5705 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/20 12 Paul C. Rizzo Associates, Inc.Sheet 204 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. hp2b Equipment Description Equip. Class 8A. Motor-Operated Valves MOTOR OPERATED VALVE HP-2B Location:
Bldg.AUXB Floor El. 565 Room 236 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Valve is horizontally mounted on the pipe. There is an anchor right below the valve.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
MOVfound with good surface finish and no signs of corrosion.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N II X Y N U N/A-F x Y N U N/A x Y N U N/A-I x Y N U N/A-I x Y N U x I I L Z Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANMIS Sheet 205 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. hp2b Equipment Description Equip. Class 8A. Motor-Operated Valves 4OTOR OPERATED VALVE HP-2B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No potential interaction hazards identifedfrom nearby equipment.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity qf block walls in the area verified as walls 2337 and 2347.Block wall hazard identified as Non-Credible.
- 9. Do attached lines have adequate flexibility to avoid damage?Flexible lines inspected andfound with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x 1 1 I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I Comments (Additional pages may be added as necessary)
Pipe enters containment penetration P-20 from Aux. Building.
The pipe isjudged adequate for Seismic Anchor Motion loads (415' offlex. Length)Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 LcQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 206 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. hp2b Equipment Description Equip. Class 8A. Motor-Operated Valves MOTOR OPERATED VALVE HP-2B nrtinIY nr rp~h1vinnt dnniimfnte 2nnI nhntne (if +/-invlh HP2B Plate ID Plate of component HP2B General General view of component LC4M Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 207 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. hp2c Equipment Description Equip. Class 8A. Motor-Operated Valves MOTOR OPERATED VALVE HP-2C Location:
Bldg.AUXB Floor El. 565 Room 208 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Pipe is adequately supported at -24" on either side of the valve.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N Y N U N/A Y-7 1 U X Y N U N/A Y N U N/A Y N U N/A--T -I X Y N U X II L-:3 <Paul C. Rizzo Associates, Inc.Sheet 208 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. hp2c Equipment Description Equip. Class 8A. Motor-Operated Valves M4OTOR OPERATED VALVE HP-2C Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Attached lines were found with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 1 -01I Paul C. Rizzo Associates, Inc.Sheet 209 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. hp2c Equipment Description MOTO]Equip. Class 8A. Motor-Operated Valves R OPERATED VALVE HP-2C Other supporting or relevant documents and photos (if any): HP2C General General view of component
[cz Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrS Sheet 210 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. HV5314 Equipment Description Equip. Class 0. Other M4OTOR-OPERATED DAMPER HV 5314 Location:
Bldg.AUXB Floor El. 623 Room 515 Manufacturer, Model, Etc.MOTOR-OPERATED DAMPER HV 5314 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
HSS 6x6 rack anchored to floor and wall found in adequate condition.
Damper attached to rack with four 1/2" diameter bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N IZI XL I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 1 -7 1 x Y N U x I I LCIQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrS Sheet 211 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. HV5314 Equipment Description Equip. Class 0. Other MOTOR-OPERATED DAMPER HV 5314 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Flexible lines attached to component found in good condition.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x 1 1 I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helftirich L X Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 212 of 379 StatusQN U Seismic Walkdown Checklist (SWC) j Equipment ID No. HV5314 Equipment Description Equip. Class 0. Other MOTOR-OPERATED DAMPER HV 5314 Other supporting or relevant documents and photos (if any): HV_3 14 Plate ID Plate of component HV5314 General General view of component LcY Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 213 of 379 Status N U Seismic Walkdown Checklist (SWC)Equipment ID No. HV5314 Equipment Description MOTO]Equip. Class 0. Other R-OPERATED DAMPER HV 5314 HV5314 anchorage View of anchorage
[CQ Paul C. Rizzo Associates, Inc.Sheet 214 of 379 ENGINEERS
& CONSULTANTS StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. IA-636 Equipment Description Equip. Class 7. Pneumatic-Operated Valves IA PCV FOR MU66A Location:
Bldg.AUXB Floor El. 565 Room 208 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Small solenoid valve on strut channel, which is attached to concrete wall.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
LI X Y N U N/A x Y N U N/A x Y N U N/A_ I I x Y N U N/A T I x Y N U x I I L czY Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 215 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. IA-636 Equipment Description Equip. Class 7. Pneumatic-Operated Valves IA PCV FOR MU66A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Attached lines were found with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 UC*Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 216 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. IA-636 Equipment Description IA PCV Equip. Class 7. Pneumatic-Operated Valves FOR MU66A Other supporting or relevant documents and photos (if any): IA-636 Plate and General General view of component
[c-Y- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 217 of 379 Status'?)
N U Seismic Walkdown Checklist (SWC)Equipment IDNo. ICSIIA Equipment Description Equip. Class 7. Pneumatic-Operated Valves ICS I I A Atmosphere vent valve Location:
Bldg.AUXB Floor El. 643 Room 602 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Top and bottom of valve found to be restrained No degraded condition found 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A T I x Y N U x I I I % Paul C. Rizzo Associates, Inc.Sheet 218 of 379 ENGINEERS
& CONSULTAWIS StatusQN U Seismic Walkdown Checklist (SWC) 11 Equipment ID No. ICS11A Equipment Description Equip. Class 7. Pneumatic-Operated Valves ICSI I A Atmosphere vent valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Flexible lines found with adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I 1 I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 219 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. ICSI IA Equipment Description ICS I A1 Equip. Class 7. Pneumatic-Operated Valves Atmosphere vent valve Other supporting or relevant documents and photos (if any): ICSI IA Plate ID Plate of component IIý! IA kjenerai General view of component PY Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 220 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. ICS11A Equipment Description ICS 11A Equip. Class 7. Pneumatic-Operated Valves Atmosphere vent valve ICSI lA brace2 Brace support for component IUN I IA trace Brace support for component UCIQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 221 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. ICSI 1A Equipment Description ICS II A Equip. Class 7. Pneumatic-Operated Valves Atmosphere vent valve ICSI I A anchor View of anchorage I -Paul C. Rizzo Associates, Inc.Sheet 222 of 379 ENGINEERS
& CONSULTANTS StatusCY-.4 U Seismic Walkdown Checklist (SWC)Equipment ID No. K5-1 Equipment Description Equip. Class 17. Engine Generators Diesel Generator Location:
Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?Equipment found to be stitch welded to base.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage detail found to be consistent with the presented in SQUG calc C-CSS-K5-1.
16 -1 1/4" cast-in place bolts spaced around 5ft each.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N X I IiIZ Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I L Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 223 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. K5-1 Equipment Description Equip. Class 17. Engine Generators Diesel Generator Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Associated block walls identified as: 308D, 309D, 310D, 311 D, 338D See Appendix Cfrom report for references.
Identified as seismically adequate.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U X II I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 U'zQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 224 of 379 StatuQ N U Seismic Walkdown Checklist (SWC) -.Equipment ID No. K5-2 Equipment Description Equip. Class 17. Engine Generators Diesel Generator Location:
Bldg.AUXB Floor El. 585 Room 319 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?Equipment found to be stitch welded to base.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage detail found to be consistent with the presented in SQUG calc C-CSS-K5-2.
16 -1 1/4" cast-in place bolts spaced around 5ft each.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I < Paul C. Rizzo Associates, Inc.Sheet 225 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. K5-2 Equipment Description Equip. Class 17. Engine Generators Diesel Generator Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Block wall 304D verified to be to be seismically adequate based on ref VBW12-BO01-064, Rev 8 (8/26/87).
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U X II Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U X II I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Ulw? Paul C. Rizzo Associates, Inc.Sheet 226 of 379 ENGINEERS
& CONSULTANTS StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. K5-2 Equipment Description Diesel Equip. Class 17. Engine Generators Generator Other supporting or relevant documents and photos (if any): K5-2 plate ID Plate of component K5-2 general General view of component 2C Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 227 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. K5-2 Equipment Description Diesel Equip. Class 17. Engine Generators Generator K5-2 anchor bolt Partial view of anchorage, view is typical of all anchors L % <Paul C. Rizzo Associates, Inc.Sheet 228 of 379 ENGINEERS
& CONSULTANTS StatusON U Seismic Walkdown Checklist (SWC)Equipment IDNo. L311 Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL 1 MODULE L311I Location:
Bldg.AUXB Floor El. 623 Room 502 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Inside of panel C5762C While anchorage of the panel is external to the panel, they are covered by a trip protection covering that could not be removed Anchorage condition based on SQUG calc C-CSS-C5762C.
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y N II x Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I x Y N U 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?
C-CSS-C5762C calculations indicate that MOD95-0032 resolves anchorage concerns and cabinet bolting issues. It was verified that the adjacent panels are connected at the top.Anchorage adequacy deemed seismically adequate.Based on good condition of panel and SQUG SEWS, anchorage is judged to be in adequate condition.
IQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 229 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. L311 Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL I MODULE L3 11 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U X II I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x TýComments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich LC7'Q Paul C. Rizzo Associates, Inc.Sheet 230 of 379 ENGINEERS
& CONSULTANTrS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. L311 Equipment Description LOGIC Equip. Class 20a. Inst. in control panel/cabinet CHANNEL 1 MODULE L311 Other supporting or relevant documents and photos (if any): LJII General view of component
--- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 231 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. L311 Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL I MODULE L311i L311-511 cabinet General View of Cabinet housing components Lomeo"- a , ýL II -: I I caomets ooITea iogemner inoetween Cabinets are bolted together in the middle UC0Q Paul C. Rizzo Associates, Inc.Sheet 232 of 379 ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. L311 Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL 1 MODULE L311 L311-511 cabinets welded together on left Cabinets are welded together on the left side L311-511 cabinets welded together on right Cabinets are welded together on the right side QOQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 233 of 379 StatusQl\N U Seismic Walkdown Checklist (SWC)Equipment IDNo. L51I Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL I MODULE L5 11 Location:
Bldg.AUXB Floor El. 623 Room 502 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one I of the 50% of SWEL items requiring such verification)?
Inside of panel C5762C. While anchorage of the panel is external to the panel, they are covered by a trip protection covering that could not be removed Anchorage condition based on SQUG calc C-CSS-C5 762C 2. Is the anchorage free of bent, broken, missing or loose hardware?
L_3. Is the anchorage free of corrosion that is more than mild surface L_oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? __.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y N Y N U N/A x Y N U N/A X Y N U N/A x Y N U N/A X Y N U 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?
C-CSS-C5762C calculations indicate that A1OD95-0032 resolves anchorage concerns and cabinet bolting issues. It was verified that the adjacent panels are connected at the top.Anchorage adequacy deemed seismically adequate.Based on good condition of panel and SQUG SEWS, anchorage is judged to be in adequate condition.
U0Z Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 234 of 379 StatusQN U Seismic Walkdown Checklist (SWC) NO Equipment IDNo. L511 Equipment Description I Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL 1 MODULE L51 1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x T I I Comments (Additional pages may be added as necessary)
J Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich P O Z Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 235 of 379 StatusQDN U Seismic Walkdown Checklist (SWC)Equipment ID No. L511 Equipment Description LOGIC Equip. Class 20a. Inst. in control panel/cabinet CHANNEL 1 MODULE L511 Other supporting or relevant documents and photos (if any): LMI1 General view of component
-w- <Paul C. Rizzo Associates, Inc.Sheet 236 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC) VI Equipment ID No. L511 Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL 1 MODULE L5 11 L311-511 cabinet General View of Cabinet housing components L311-51 Icabinets bolted together inbetween Cabinets are bolted together in the middle
[U-Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 237 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. L511 Equipment Description Equip. Class 20a. Inst. in control panel/cabinet LOGIC CHANNEL I MODULE L511 L311-511 cabinets welded together on left Cabinets are welded together on the left side Li1 1-. II welded togetner on rignt Cabinets are welded together on the right side Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 238 of 379 StatusQ)N U Seismic Walkdown Checklist (SWC)Equipment ID No. LI-1525A Equipment Description Equip. Class 20. Instrument and Control Panels BWST LEVEL INDICATOR INSIDE PNL C5716 Location:
Bldg.AUXB Floor El. 623 Room 502 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Anchorage could not be verified due to mastic covering bottom of panel.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N II X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 7 x Y N U x I I L czM Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 239 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)V)Equipment ID No. LI-1525A Equipment Description Equip. Class 20. Instrument and Control Panels BWST LEVEL INDICATOR INSIDE PNL C5716 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Block walls in room 502found to be seismically adequate per 80-11 documentation.
Refer to Appendix Cfor list of walls associated to component.
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 DCQ Paul C. Rizzo Associates, Inc.Sheet 240 of 379 ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. LI-1525A Equipment Description BWST I StatusQN U Equip. Class 20. Instrument and Control Panels LEVEL INDICATOR INSIDE PNL C5716 Other supporting or relevant documents and photos (if any): LI I525A Plate and General Overall view of component and anchorage