ML13008A039
ML13008A039 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 10/23/2012 |
From: | Guerra E M, Helffrich A L Paul C. Rizzo Associates, ABS Consulting, FirstEnergy Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
References | |
L-12-283 | |
Download: ML13008A039 (69) | |
Text
LK - Paul C. Rizzo Associates, Inc.ENGINEERS5
& C'ONSULTANITS Sheet 66 of 191 N U Area Walk-By Checklist (AWC)Status: (W)Room Emer Swgr Room Train A Floor El.713 Bldg.SRVB File Name: 1-67-1-4-25.jpeg
==
Description:==
Gap of 1" between VITBUS 1 and wall judged adequate File Name: 1-68-1-4-25.jpeg
==
Description:==
Light has burn marks on it, appears disused.Considered a non issue.
I Paul C. Rizzo Associates, Inc.ENGINEEMS
& CONSULTA&W5 Sheet 67 of 191 Area Walk-By Checklist (AWC)Status: (D N U Room Emer Swzr Room Train A Floor El.713 Bldg.SRVB File Name: 1-69-1-4-25.jpeg
==
Description:==
View of nearby fire extinguisher File Name: 1-70-l-4-25.jpeg
==
Description:==
DC-SWGR-3 and DC-SWBD-3 are bolted together, M-% V Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANnT Sheet 68 of 191 N U Area Walk-By Checklist (AWC)Status: W Room Emer Swgr Room Train A Floor El.713 Bldg.SRVB l~ile Name: 1-/i-I-4-in.jpeg
==
Description:==
HVAC grill over INV-VITBUS1-3 judged adequately restrained.
rne iName: I-/z-i-q-za.jpeg
==
Description:==
View of nearby fire extinguisher Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 69 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Emer Swgr Room Train A Floor El.713 Bldg.SRVB File Name: 1-75-1-4-25.jpeg
==
Description:==
View of unused cables in cable tray, L Q Paul C. Rizzo Associates, Inc.ENGINEERS
&
Sheet 70 of 191 N U Area Walk-By Checklist (AWC)Status: (W)Room Emer Swgr Room Train B Floor El.713 Bldg.SRVB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.Y N U N/A 1. Does anchorage of equipment in the area appear to be free of X potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y N U N/A 2. Does anchorage of equipment in the area appear to be free of significant X degraded conditions?
Y N U N/A 3. Based on a visual inspection from the floor, do the cable/conduit X raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y N U N/A 4. Does it appear that the area is free of potentially adverse seismic spatial x interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Block wall SB1-6, SB I-7, and SB I-8 are adequate under calculations DSC-0085, DSC-0086 and DSC-0087, respectively.
Block wall SB1-9 adequate under calculation DSC-0088. These calculations are part of a follow-up seismic analysis in support of lE80-11 calculations.
Related equipment on SWEL for this area: 480VUS-1-9-P 4KVS-1DF BAT-CHGI-2-A DC-SWBDI-2 INV-VITBUS 1-4 TRANS- 1-9P Paul C. Rizzo Associates, Inc.ENGINEEMS
&
Sheet 71 of 191 N U Area Walk-By Checklist (AWC)Status: W)Room Emer Swgr Room Train B Floor El.713 Bldg.SRVB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Shower in area judged rugged and not a spray hazard.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Fire signs posted on battery room door. Batteries are well restrained and no potential interaction or falling of objects that could short the battery terminals and cause afire were found. Judged adequate.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Potential falling from severalfire extinguishers in area is judged not a concern.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Comments (Additional pages may be added as necessary)
In general, all cabinets appear to be bolted together if within proximity of another cabinet Y N U N/A x Y N U N/A X Y N U N/A X Y N U x --F Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012
'11r- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTn Area Walk-By Checklist (AWC)Room Emer Swgr Room Train B Floor El. 713 Bide.Sheet 72 of 191 Status: (Y N U Other supporting SRVB r relevant documents and photos (if any): File Name: 1-59-1-4-:
==
Description:==
General 1Name: l-OU-1-4-26.jpeg
==
Description:==
General 2 C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANT" Sheet 73 of 191 N U Area Walk-By Checklist (AWC)Status: (Y Room Emer Swgr Room Train B Floor El.713 Bldg.SRVB File Name: 1-65-1-4-26.jpeg
==
Description:==
Block wall, fire ext, fire danger sign File Name: 1-66-1-4-26.jpeg
==
Description:==
SUB STA 1-9 BUS I P, with un-racked breaker Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 74 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Emer Swgr Room Train B Floor El.713 Bldg.SRVB File Name: 1-67-1-4-26.jpeg
==
Description:==
SUB STA 1-9 BUS 1 P, with un-racked breaker tile Name: i-o9--1a-zLt.jpeg
==
Description:==
View of unrestrained fire extinguisher, and properly secured box.
C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAýIS Sheet 75 of 191 Area Walk-By Checklist (AWC)Status: W)N U Room Emer Swgr Room Train B Floor El.713 Bldg.SRVB ruie iName: 1-/U-I-4-Zojpeg
==
Description:==
View of unrestrained fire ext, ladder is properly secured.File Name: 1-71-1-4-26.jpeg
==
Description:==
Emergency shower is rugged, judged not a spray concern L Q Paul C. Rizzo Associates, Inc.ENGINEERS r CONSULTANI'TS Sheet 76 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Emer Swgr Room Train B Floor El.713 Bldg.SRVB File Name: 1-72-1-4-26.jpeg
==
Description:==
Cable tray has long rod support, but is laterally braced and judged a non issue I Q Paul C. Rizzo Associates, Inc.ENGINEERS f CONSULLTAMTS Sheet 77 of 191 N U Area Walk-By Checklist (AWC)Status: W Room INTS Pump Cubicle I(A)Floor El.705 Bldg.INTS Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Surface rust at base plate of some componentsjudged acceptable.
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Light above cabinet PNL 1FPJ is in contact with conduit. Lamp may impact conduit, so impact is credible, but judged not significant Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: VS-D-57A I WR-P-1A Paul C. Rizzo Associates, Inc.ENGINEERS 6I CONSULTAýNS Sheet 78 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room INTS Pump Cubicle I1(A)Floor El.705 Bldg.INTS Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: 9/28/2012 Adam L. Helffrich
C. Rizzo Associates, Inc.ENOWMNEEI
& CONSULTANTS Sheet 79 of 191 N U Area Walk-By Checklist (AWC)Status: (w Room INTS Pump Cubicle I1(A)Floor El.705 Bldg.INTS Other supporting or relevant documents and photos (if any): t, ie Name: 1-MJ-1-4-2/.jpeg
==
Description:==
General vlle Name: l-bU-l-4-2/.jpeg
==
Description:==
General 2 K Paul C. Rizzo Associates, Inc.ENGINEERS
& CONMULTANTS Area Walk-By Checklist (AWC)Room INTS Pump Cubicle 1 (A)Sheet 80 of 191 Status: (Y)N U Floor El.705 Bldg.INTS File Name: 1-65-1-4-27.jpeg
==
Description:==
Light above Cabinet PNL 1FP 1. Judged non-damaging.
Paul C. Rizzo Associates, Inc.ENGINEERS
&. CONSULTANIS Sheet 81 of 191 N U Area Walk-By Checklist (AWC)Status: W)Room INTS Pump Cubicle 2(B)Floor El.705 Bldg.INTS Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Minor surface rust on vertical pump judged a non issue 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: VS-D-57B I VS-F-57B WR-P-1B L ---- Paul C. Rizzo Associates, Inc.ENGIIEEMS
& CONSULTANTh Sheet 82 of 191 Area Walk-By Checklist (AWC)Status: (Y N U Room INTS Pump Cubicle 2(B)Floor El.705 Bldg.INTS Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary scaffold are secured and judged a non issue. Nearby ladders are secure.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x l I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra_ *Date: 9/28/2012 Adam L. Helffrich L D Paul C. Rizzo Associates, Inc.ENGI;NEERS
& CONSULTAN.TS Area Walk-By Checklist (AWC)Room INTS Pump Cubicle 2(B)Sheet 83 of 191 Status: (2)N U Floor El.705 Bldg. INTS Other supporting or relevant documents and photos (if any): File Name: 1-59-1-4-Description:
General File Name: 1-60-1-4-:
==
Description:==
General 2 X Y Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANM Sheet 84 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room INTS Pump Cubicle 2(B)Floor El.705 Bldg.INTS File Name: 1-65-1-4-28.jpeg
==
Description:==
Surface rust on pump I WR P IB not an issue Vile Name: l-b0-1-4-2?;Jpeg
==
Description:==
Temporary scaffold not an issue I[I Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTA.&MS Sheet 85 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room INTS Pump Cubicle 2(B)Floor El.705 Bldg.INTS tile Name: 1-b/-1-4-28.Jpeg
==
Description:==
Ladders are secure I-ile Name: 1-68-I-4-28.jpeg
==
Description:==
General 3 L Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 86 of 191 Area Walk-By Checklist (AWC)Status: Y (a U Room INTS Pump Cubicle 3(C)Floor El.705 Bldg.INTS Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of'judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
Pump 1WR-P-]C has two bolts with significant corrosion.
CR 2012-13969 was generated because of the issue.3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Lightjust above feeder breaker 4B is not considered a significant interaction Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: VS-D-57C I L ---- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAN'T Sheet 87 of 191 0 U Area Walk-By Checklist (AWC)Status: Y Room INTS Pump Cubicle 3(C)Floor El.705 Bldg.INTS Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?A// piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Temporary scaffold judged non damaging to surrounding piping.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary)
Eddie M. Guerra Evaluated by: Date: 9/28/2012 ,a l L.Date: Adam L. Helffrich 9/28/2012
[---- Paul C. Rizzo Associates, Inc.ENGMNEER & CONSULTANMTS Area Walk-By Checklist (AWC)Room INTS Pumo Cubicle 3(C)Sheet 88 of 191 Status: Y U Floor El.705 Bldg. INTS Other supporting or relevant documents and photos (if any): nile Name: I-'9-1-4-29.jpeg
==
Description:==
General 1 rue iName: i-ou-i-4-zL.jpeg
==
Description:==
General 2 L IZQ Paul C. Rizzo Associates, Inc.ENGINEEILS
& CONSULTAN-S Sheet 89 of 191 Area Walk-By Checklist (AWC)Status: Y a U Room INTS Pump Cubicle 3(C)Floor El.705 Bldg.INTS Vile Name: 1-0b-1-4-29jpeg
==
Description:==
View of light above feed breaker. Judged not a concern.Hile Name: 1-bb-1-4-29.jpeg
==
Description:==
Temp scaffold judged non damaging to surrounding piping Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAN-s Sheet 90 of 191 0 U Area Walk-By Checklist (AWC)Status: Y Room INTS Pump Cubicle 3(C)Floor El.705 Bldg.INTS File Name: 1-67-1-4-29.jpeg
==
Description:==
Scaffold deficient tag lile Name: l-OZ-I-4-29.jpeg
==
Description:==
Corroded bolt near pump. Bolt hold nothing I Paul C. Rizzo Associates, Inc.ENGINEERS
& CO NU1TAN"s Sheet 91 of 191 N U Area Walk-By Checklist (AWC)Status: (S)Room LHSI Pump lB Floor El.751 Bldg.SFGB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y N U N/A x Y N U N/A x :U N Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: SI-P-1A rI Q Paul C. Rizzo Associates, Inc.
& CONSULTf .1ST Sheet 92 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room LHSI Pump lB Floor El.751 Bldg.SFGB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I T I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 LCQ Paul C. Rizzo Associates, Inc.ENGINFERS
& CONSULTM,1,S Area Walk-By Checklist (AWC)Room LHSI Pump I B Floor El. 751 Bldg Other supportin Sheet 93 of 191 Status: (2)N U SFGB g or relevant documents and photos (if any): File Name: 1-59-1-4-3 l.jpeg
Description:
General LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 94 of 191 N U Area Walk-By Checklist (AWC)Status: I Room Main Steam Valve Room Floor El.751 Bldg.SFGB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of'judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
A damagedpipe insulation near valve MOV-IMS-105 was judged to be due to servicing of the valve and not a seismic concern. A pipe connected to a containment penetration 89 (valve TV-ISV-I OOA is on this pipe) has a gap of 1/8" to a knee brace mounted on Safeguards Building.
The effect of differential building displacements at this elevation between the two buildings was investigated andfound that the pipe has adequate flexibility to accommodate the demand seismic displacements of the two buildings.
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: MCC-1-E13 MOV-1MS-105 PCV-1MS-101C PNL-1MS-101A PNL-1MS-101B SV-MS- 104B TV-iMS-101C TV-IMS-105A I[Q Paul C. Rizzo Associates, Inc.ENGINEEMS
& CONSULTAN M Sheet 95 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Main Steam Valve Room Floor El.751 Bldg.SFGB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Ladder in lower area is loosely secured thus judged not to be a concern since there are no soft targets in the vicinity.8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U xT---7 Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra" 40 / Date: 9/28/2012 Adam L. Helffrich I Q Paul C. Rizzo Associates, Inc.ENGINEERS
& COMULTAM Area Walk-By Checklist (AWC)Room Main Steam Valve Room Floor El. 751 Bldg.Sheet 96 of 191 Status: (2)N U Other supporting c SFGB ar relevant documents and photos (if any): File Name: 1-60-1-4-32.jpeg
==
Description:==
General 1 LX-- Paul C. Rizzo Associates, Inc.ENGINEERS
- f. CONSULTANTS Area Walk-By Checklist (AWC)Room Main Steam Valve Room Floor El. 751 Bldg.Sheet 97 of 191 Status: (2)N U SFGB File Name: 1-65-1-4-32.jpeg
==
Description:==
Ducting in area adequately supported L 7 Paul C. Rizzo Associates, Inc.ENGINEERS
&
Sheet 98 of 191 N U Area Walk-By Checklist (AWC)Status: (w Room Main Steam Valve Room Floor El.751 Bldg.SFGB File Name: 1-67-1-4-32.jpeg
==
Description:==
General 3 File Name: 1-68-1-4-32.jpeg
==
Description:==
General 4 1-k .Paul C. Rizzo Associates, Inc.Sheet 99 of 191 ENGINEERS
& CONSU LTANtS Area Walk-By Checklist (AWC)Status: ()N U Room Main Steam Valve Room Floor El.751 Bldg.SFGB rue iName: I-,-I-'-3L.Jpeg
==
Description:==
Spalled grout on main steam support, not significant rue iName: l-/u-i-,4-.3.jpeg
==
Description:==
Insulation damage believed to be due to valve servicing MOV 1 MS 105 L Y Paul C. Rizzo Associates, Inc.ENGINEEM & COUILTA1YM Sheet 100 of 191 N U Area Walk-By Checklist (AWC)Status: (D Room Main Steam Valve Room Floor El.751 Bldg.SFGB Pile Name: 1-71-1-4-32jpeg
==
Description:==
Boxes, secure.rue Name: i-/z-l-4-i2.jpeg
==
Description:==
Ladder, loosely secured.
L- ZQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 101 of 191 N U Area Walk-By Checklist (AWC)Status: (W)Room Main Steam Valve Room Floor El.751 Bldg.SFGB File Name: 1-74-1-4-32.jpeg
==
Description:==
Fire line is secure.File Name: 1-75-1-4-32.jpeg
==
Description:==
View of pipe going into containment building with nearby knee brace.located on the floor of Safeguards Building.
Interaction due to differential motion judged not a concern.
I2----Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrT Sheet 102 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Motor Generator Room Floor El.713 Bldg.SRVB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y N U N/A x I Y N U N/A x I Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: REAC-TR-SWGR-1A L Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSU LTANT-S Sheet 103 of 191 Area Walk-By Checklist (AWC)Status: (2)N U Room Motor Generator Room Floor El.713 Bldg.SRVB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Unrestrainedfire extinguishers in area are not considered significant.
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Comments (Additional pages may be added as necessary)
DC hold power supply cabinet, logic cabinet, power cabinet IBD, and power cabinet 2 BD all have after market air conditioning units added to them. AC units appear to be lightweight andjudged not to affect the structural integrity of the cabinets.Y N U N/A X Y N U N/A X Y N U N/A x Y N U x T-T----: ý44Zý'Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: 9/28/2012 Adam L. Helffrich IXQ Paul C. Rizzo Associates, Inc.ENCINEERS
& CONSULAN"M Sheet 104 of 191 N U Area Walk-By Checklist (AWC)Status: w)Room Motor Generator Room Floor El.713 Bldg.SRVB Other supporting or relevant documents and photos (if any): File Name: 1-59-1-4-33.jpeg
==
Description:==
General File Name: 1-b6-1-4-K3
==
Description:==
General 2
-Paul C. Rizzo Associates, Inc.ENGINEERS
& CIONSULtA.\I Sheet 105 of 191 N U Area Walk-By Checklist (AWC)Status: (5)Room Motor Generator Room Floor El.713 Bldg, SRVB lile Name: 1-bS-I-4-3j.jpeg
==
Description:==
View of carts, ladders and fire extinguisher in the area lile Name: l-66-1-4-33.jpeg
==
Description:==
View of AC units modification for several cabinets.
I[Y Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSUtTANMS Sheet 106 of 191 N U Area Walk-By Checklist (AWC)Status: (D Room Normal Switchgear Area Floor El.713 Bldg.SRVB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: TRANS- 1-8N I
[% q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAN-I Sheet 107 of 191 N U Area Walk-By Checklist (AWC)Status: (D Room Normal Switchgear Area Floor El.713 Bldg.SRVB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x --r I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: 9/28/2012 Adam L. Helffrich I Y Paul C. Rizzo Associates, Inc.ENGPIEMR & CONSULTAN-M Sheet 108 of 191 N U Area Walk-By Checklist (AWC)Status: (2)Room Normal Switchgear Area Floor El.713 Bldg.SRVB Other supporting or relevant documents and photos (if any): File Name: 1-59-1-4-34.jpeg
==
Description:==
General rie Name: i-ou-i--i,4.Jpeg
==
Description:==
Top entry conduit with flexible joints judged adequate I L2--- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAN',S Sheet 109 of 191 N U Area Walk-By Checklist (AWC)Status: (W)Room Normal Switchgear Area Floor El.713 Bldg.SRVB Pile Name: 1-66-1-4-34.jpeg
==
Description:==
No connection between cage and transformer, approx 2 in gap, judgzed a non issue.File Name: 1-67-1-4-34.jpeg
==
Description:==
No connection between cage and transformer, approx 2 in gap, judged a non issue.
L[Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANIS Sheet 110 of 191 U Area Walk-By Checklist (AWC)Status: Y Room Pipe Penetration C Floor El.722 Bldg.SFGB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: TV-IBD-IOOA TV-ICV-102 TV-ICV-150B
'Ig Paul C. Rizzo Associates, Inc.ENGINEERS I. CONSULTAYnT Sheet 111 of 191 Area Walk-By Checklist (AWC)Status: Y (8 U Room Pipe Penetration C Floor El.722 Bldg.SFGB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Several potential seismic interactions found (see Photos), all judged not significant, except one. Temporary bullet shield placed by Security poses risk to adjacent Pressure Transmitter.
CR-2012-14020 was generated A follow-up walkdown showed the barrier moved and properly secured 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Several sources of minor corrosion in room (see photos). Only two instances were signi/icant.
CR-2012-13970 and CR-2012-13971 were generated to address corrosion on Component TV-ICC-I 1OF2 and Valve IA C-1150, respectively.
Both valves are currently operable.
Minor cracking on the east wall was judged as surface cracking and not significant.
Comments (Additional pages may be added as necessary)
Y N U N/A x Y N U N/A x Y N U N/A X Y N U T-x-T Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 C. Rizzo Associates, Inc.ENGINEERS
& C-MSULT.AN-Area Walk-By Checklist (AWC)Room Pipe Penetration C Floor El. 722 Bld[Other supportir Sheet 112 of 191 Status: Y a U g.I SFGB ig or relevant documents and photos (if any): File Name: 1-59-1-4-38.jpeg
==
Description:==
General File Name: 1-60-1-4-3
==
Description:==
General 2
[ Q Paul C. Rizzo Associates, Inc.ENCINtERS
& CONSULTANTS Sheet 113 of 191 U Area Walk-By Checklist (AWC)Status: Y Room Pipe Penetration C Floor El.722 Bldg.SFGB File Name: 1-65-1-4-38.jpeg
==
Description:==
Noted minor corrosion in area File Name: 1-66-1-4-38.jpeg
==
Description:==
Noted minor corrosion in area Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 114 of 191 U Area Walk-By Checklist (AWC)Status: Y Room Pipe Penetration C Floor El.722 Bldg.SFGB Vlle Name: 1-67-1-4-38.jpeg
==
Description:==
Noted minor corrosion in area rile Name: i-os-i-4-jz-.jpeg
==
Description:==
Noted minor corrosion in area Paul C. Rizzo Associates, Inc. Sheet 115 of 191 ENGINEERS
&
Area Walk-By Checklist (AWC)Status: Y 8 U Room Pipe Penetration C Floor El.722 Bldg.SFGB Fle Name: 1-bg-1-4-3z&jpeg
==
Description:==
Noted corrosion in area, CR-2012-13971 initiated Hle Name: 1-7/U-1-4-38.jpeg
==
Description:==
Noted corrosion in area, CR-2012-13970 initiated L--Q Paul C. Rizzo Associates, Inc.ENGINEERS
& COSULTANTS Sheet 116 of 191 Area Walk-By Checklist (AWC)Status: Y (S) U Room Pipe Penetration C Floor El.722 Bldg.SFGB File Name: 1-71-1-4-38.jpeg
==
Description:==
Noted corrosion in area, CR-2012-13970 initiated-ile Name: i-/L-1-4-i..jpeg
==
Description:==
Noted corrosion in area, CR-2012-13970 initiated Paul C. Rizzo Associates, Inc.ENGIfNEERS
& CONSULTANTS Sheet 117 of 191 Area Walk-By Checklist (AWC)Status: Y (8 U Room Pine Penetration C Floor El.722 Bldg.SFGB File Name: 1-75-1-4-38.jpeg
==
Description:==
Wall with potential cracking, east wall, judged not significant Paul C. Rizzo Associates, Inc.NGMINEERS
& CONSULTANWT Sheet 118 of 191 G U Area Walk-By Checklist (AWC)Status: Y Room Pipe Penetration C Floor El.722 Bldg.SFGB File Name: 1-76-1-4-38.jpeg
==
Description:==
Wall with potential cracking, east wall, judged not significant vtle Name: 1-//-1-4-3&z.jpeg
==
Description:==
Wall with potential cracking judged not significant, east wall.
LV Paul C. Rizzo Associates, Inc.E'NGINEEM
& CONSULTANTS Sheet 119 of 191 N U Area Walk-By Checklist (AWC)Status: W Room Prim. Aux. BLDG 722'6 NE Comer Floor El.722 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: TCV-ICH-144 L Y Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 120 of 191 Area Walk-By Checklist (AWC)Status: W) N U Room Prim. Aux. BLDG 722'6 NE Comer Floor El.722 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Unsecured pole and fire extinguisher in the area considered not to cause unacceptable interactions.
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: 9/28/2012 Adam L. Helffrich L Q Paul C. Rizzo Associates, Inc.ENGINEERS
&
Sheet 121 of 191 Area Walk-By Checklist (AWC)Status: &N U Room Prim. Aux. BLDG 722'6 NE Comer Floor El.722 Bldg.AXLB Other supporting or relevant documents and photos (if any): rI e IName: 1-3 Y-!-,-4.jpeg
==
Description:==
General File Name: 1-60-1-4-41 jpeg
Description:
Fire extinguisher in area 1-% M Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANnT Area Walk-By Checklist (AWC)Room Prim. Aux. BLDG 722'6 NE Comer Floor El. 722 Bldg. A)Sheet 122 of 191 Status: (Y)N U (LB File Name: 1-65-1-4-41.jpeg
==
Description:==
Loose pole could impact I Y Paul C. Rizzo Associates, Inc.ENGMNEERS
& CONSULTANTh Sheet 123 of 191 N U Area Walk-By Checklist (AWC)Status: (S)Room Prim. Aux. BLDG 722'6 BIT Cub.Floor El.722 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.Y N U N/A 1. Does anchorage of equipment in the area appear to be free of X potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Y N U N/A 2. Does anchorage of equipment in the area appear to be free of significant X degraded conditions?
Y N U N/A 3. Based on a visual inspection from the floor, do the cable/conduit X raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Y N U N/A 4. Does it appear that the area is free of potentially adverse seismic spatial X interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Tank S1- TK-2 approximately 3 inches fiom wall not considered a credible impact.Block wall ABI-1 is qualified under reference DSC-O001.
This calculation is part of a follow-up seismic analysis in support of lE80-11 calculations.
Related equipment on SWEL for this area: SI-TK-2 L Paul C. Rizzo Associates, Inc.ENGTNEEIRS
& CON'I.TAN-M Sheet 124 of 191 Area Walk-By Checklist (AWC)Status: (Y) N U Room Prim. Aux. BLDG 722'6 BIT Cub.Floor El.722 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Comments (Additional pages may be added as necessary) i J i)Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: Adam L. Helffrich 9/28/2012 r-w--V-1Sheet 125 of 191 Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANUS Area Walk-By Checklist (AWC)Status: (W)N U Room Prim. Aux. BLDG 722'6 BIT Cub.Floor El.722 Bldg.AXLB Other supporting or relevant documents and photos (if any): File Name: 1-i9-1-4-42jpeg
==
Description:==
General 1 File Name: 1-6U-1-4-42.jpeg
==
Description:==
General 2 I Y Paul C. Rizzo Associates, Inc.ENGINERS & CCONMLTANTS Sheet 126 of 191 N U Area Walk-By Checklist (AWC)Status: Y)Room Prim. Aux. BLDG 722'6 BIT Cub.Floor El.722 Bldg.AXLB Hie Name: 1-b.-I-4-42.jpeg
==
Description:==
SI TK 2 approximately 3 inches from block wall.Judged not a concern.
LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAN7S Sheet 127 of 191 N U Area Walk-By Checklist (AWC)Status: (Y Room Prim. Aux. BLDG 722'6 E Cent.Floor El.722 Bldg.AXLB Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
AS TK 6 is unanchored at the base, but it is rod hung. Component is not Cat I and is not considered a credible impact to other components.
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Block walls ABI-JO, ABI-11, AB I-13, andABI-I15 are all qualified under references DCS-0009, DCS-O010, DCS-O012, and DCS-0014 respectively.
These calculations are part of afollow-up seismic analysis in support of 1E80-1 I calculations.
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Related equipment on SWEL for this area: MOV-IRW-103A MOV-IRW-103B MOV-IRW-1 14B MOV-IRW-117 I M Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 128 of 191 Area Walk-By Checklist (AWC)Status: W N U Room Prim. Aux. BLDG 722'6 E Cent.Floor El.722 Bldg.AXLB Interaction Effects 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?All piping are well supported in this area.6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?No ignition sources found in this area.7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
- 8. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 9/28/2012 Eddie M. Guerra Date: 9/28/2012 Adam L. Helffrich V' Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANA" Sheet 129 of 191 Area Walk-By Checklist (AWC)Status: (Y)N U Room Prim. Aux. BLDG 722'6 E Cent.Floor El.722 Bldg.AXLB Other supporting or relevant documents and photos (if any): Vile Name: 1-'9-1-4-43.jpeg
==
Description:==
General 1 Vile Name: I-bU-1-4-43.jpeg
==
Description:==
General 2 I Paul C. Rizzo Associates, Inc.ENGINEMRS
& CONSULTAN"S Area Walk-By Checklist (AWC)Room Prim. Aux. BLDG 722'6 E Cent.Floor El. 722 Bldg.Sheet 130 of 191 Status: (D N U AXLB File Name: 1-66-1-4-43.jpeg
==
Description:==
Block wall East L Paul C. Rizzo Associates, Inc. Sheet 131 of 191.ENGINEERS
& CONSULTAN"T$
Area Walk-By Checklist (AWC)Status: W N U Room Prim. Aux. BLDG 722'6 E Cent.Floor El.722 Bldg.AXLB Vile Name: l-b/-1-4-43.jpeg
==
Description:==
Blocks wall NorthName: l-06-I-4-43.jpeg
==
Description:==
Block walls, South I2'DQ Paul C. Rizzo Associates, Inc.ENGINEERS
& Area Walk-By Checklist (AWC)Room Prim. Aux. BLDG 722'6 E Cent.Floor El. 722 Bldg.Sheet 132 of 191 Status: (Y)N U AXLB Vlhe Name: 1-09-l-4-435.jpeg
==
Description:==
Block wall West V<Y Paul C. Rizzo Associates, Inc.E' NGINE'S & CONSULTAN'TS Sheet 133 of 191 N U Area Walk-By Checklist (AWC)Status: (Y)Room Prim. Aux. BLDG 722'6 E Cent.Floor El.722 Bldg.AXLB File Name: 1-71-1-4-43.jpeg
==
Description:==
Surface corrosion identified on large pipes. Judged not a concern.File Name: 1-7 2-1-4-43.jpeg
==
Description:==
Unanchored tank, but rod hung.No interaction concern. (The tank is not Cat I)
Paul C. Rizzo Associates, Inc.ENGINEERS.&
CONSULTAN" Sheet 134 of 191 N U Area Walk-By Checklist (AWC)Status: T Room Prim. Aux. BLDG 722'6 E Cent.Floor El.722 Bldg.AXLB Plle Name: 1-14-1-4-43.jpeg
==
Description:==
Unanchored tank, but rod hung.is not Cat I)rile Name: i-/3-1-4-i.jpeg
==
Description:==
Unanchored tank, but rod hung.No interaction concern. (The tank is not Cat I)