ML16053A336

From kanterella
Revision as of 19:14, 16 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Response to Request for Additional Information on NFPA 805 License Amendment Request 271
ML16053A336
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/22/2016
From: McCartney E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2016-0008, TAC MF23 72, TAC MF23 73
Download: ML16053A336 (2)


Text

February 22,2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Request for Additional Information Regarding Point Beach Nuclear Plant NFP A 805 License Amendment Request 271 NRC 2016-0008 10 CFR 50.90

References:

(1) NextEra Energy Point Beach, LLC, letter to NRC, dated June 26, 2013, "License Amendment Request 271, Transition to 10 CFR 50.48(c)-NFPA 805, 'Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants,' 2001 Edition" (ML131820453)

(2) NextEra Energy Point Beach, LLC, letter to NRC, dated September 16, 2013, "License Amendment Request 271, Supplement 1, Transition to 10 CFR 50.48(c) -NFPA 805" (ML13259A273)

(3) NextEra Energy Point Beach, LLC letter to NRC, dated August 26, 2015, "Supplement 2 to License Amendment Request 271 Associated with NFPA 805 (ML 15238A870)

(4) NRC letter to NextEra Energy Point Beach, LLC, dated September 25, 2013, "Point Beach Nuclear Plant, Units 1 and 2 -Acceptance of Licensing Action re: License Amendment Request to Transition to NFPA 805, Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants" (TAC NOS. MF2372 and MF2373)" (ML13267A037)

(5) NRC email to NextEra Energy Point Beach, LLC, dated October 9, 2015, "Request for Additional Information-Point Beach Nuclear Plant, Units 1 and 2-NFPA 805 LAR-MF2372 and MF2373" (ML15348A262)

(6) NRC email to NextEra Energy Point Beach, LLC, dated January 20,2016, "Request for Additional Information-Point Beach Nuclear Plant, Units 1 and 2 -NFP A 805 LAR-MF23 72 and MF23 73" (ML 16022A004)

Pursuant to 10 CFR 50.90, NextEra Energy Point Beach, LLC, (NextEra) requested to amend Renewed Facility Operating Licenses DPR-24 and DPR-27 for Point Beach Nuclear Plant (PBNP), Units 1 and 2 (Reference 1 and supplemented via Reference 2 and 3). The NRC accepted the license amendment request for review as documented in Reference ( 4). NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 The NRC requested additional information in References (5) and (6). Via a follow-up teleconference February 2, 2016, NextEra agreed to provide the NRC with dates that the responses would be provided.

The responses to the requests for information will be provided as follows: -PRA RAI SO 1 (Reference

5) -PRA RAI S02 (Reference
5) -January 20,2016, RAI (Reference
6) 04/08/2016 04/08/2016 04/08/2016 As discussed during February 2, 2016 teleconference, in addition to the RAI response, NextEra will also supplement LAR 271 with changes to attachments C, G, Sand W by 04/08/2016.

This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.

If you have any questions regarding this letter, please contact Mr. Bryan Woyak, Licensing Manager, at (920) 755-7599.

Very truly yours, NextEra Energy Point Beach, LLC Eric McCartney Site Vice President cc: Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW February 22,2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Request for Additional Information Regarding Point Beach Nuclear Plant NFP A 805 License Amendment Request 271 NRC 2016-0008 10 CFR 50.90

References:

(1) NextEra Energy Point Beach, LLC, letter to NRC, dated June 26, 2013, "License Amendment Request 271, Transition to 10 CFR 50.48(c)-NFPA 805, 'Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants,' 2001 Edition" (ML131820453)

(2) NextEra Energy Point Beach, LLC, letter to NRC, dated September 16, 2013, "License Amendment Request 271, Supplement 1, Transition to 10 CFR 50.48(c) -NFPA 805" (ML13259A273)

(3) NextEra Energy Point Beach, LLC letter to NRC, dated August 26, 2015, "Supplement 2 to License Amendment Request 271 Associated with NFPA 805 (ML 15238A870)

(4) NRC letter to NextEra Energy Point Beach, LLC, dated September 25, 2013, "Point Beach Nuclear Plant, Units 1 and 2 -Acceptance of Licensing Action re: License Amendment Request to Transition to NFPA 805, Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants" (TAC NOS. MF2372 and MF2373)" (ML13267A037)

(5) NRC email to NextEra Energy Point Beach, LLC, dated October 9, 2015, "Request for Additional Information-Point Beach Nuclear Plant, Units 1 and 2-NFPA 805 LAR-MF2372 and MF2373" (ML15348A262)

(6) NRC email to NextEra Energy Point Beach, LLC, dated January 20,2016, "Request for Additional Information-Point Beach Nuclear Plant, Units 1 and 2 -NFP A 805 LAR-MF23 72 and MF23 73" (ML 16022A004)

Pursuant to 10 CFR 50.90, NextEra Energy Point Beach, LLC, (NextEra) requested to amend Renewed Facility Operating Licenses DPR-24 and DPR-27 for Point Beach Nuclear Plant (PBNP), Units 1 and 2 (Reference 1 and supplemented via Reference 2 and 3). The NRC accepted the license amendment request for review as documented in Reference ( 4). NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 The NRC requested additional information in References (5) and (6). Via a follow-up teleconference February 2, 2016, NextEra agreed to provide the NRC with dates that the responses would be provided.

The responses to the requests for information will be provided as follows: -PRA RAI SO 1 (Reference

5) -PRA RAI S02 (Reference
5) -January 20,2016, RAI (Reference
6) 04/08/2016 04/08/2016 04/08/2016 As discussed during February 2, 2016 teleconference, in addition to the RAI response, NextEra will also supplement LAR 271 with changes to attachments C, G, Sand W by 04/08/2016.

This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.

If you have any questions regarding this letter, please contact Mr. Bryan Woyak, Licensing Manager, at (920) 755-7599.

Very truly yours, NextEra Energy Point Beach, LLC Eric McCartney Site Vice President cc: Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW