ML090630438

From kanterella
Revision as of 20:01, 9 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Inspection/Activity Plan 03/01/2009 - 06/30/2010
ML090630438
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/04/2009
From:
Reactor Projects Region 2 Branch 6
To:
References
Download: ML090630438 (2)


Text

Inspection / Activity PlanPage 1 of 203/04/200909:26:28Report 2203/01/2009

-06/30/2010UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSequoyahPSB1-RP-RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 21, 2 IPAccess Control to Radiologically Significant Areas711210103/30/200904/03/20091, 2 IPALARA Planning and Controls711210203/30/200904/03/20091, 2 IPRadioactive Material Processing and Transportation711220203/30/200904/03/20091, 2 IPPerformance Indicator Verification7115103/30/200904/03/2009 EB3ISI-UNIT 1 INSERVICE INSPECTION 21 IPInservice Inspection Activities - PWR7111108P04/06/200904/10/2009EB3TI172-TI-172 RCS DM BUTT WELDS 11 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17204/06/200904/10/2009PSB1-RP-RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 21, 2 IPAccess Control to Radiologically Significant Areas711210104/13/200904/17/20091, 2 IPALARA Planning and Controls711210204/13/200904/17/20091, 2 IPRadioactive Material Processing and Transportation711220204/13/200904/17/20091, 2 IPPerformance Indicator Verification7115104/13/200904/17/2009PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 61 IPIdentification and Resolution of Problems71152B07/13/200907/17/20091 IPIdentification and Resolution of Problems71152B07/27/200907/31/2009EB3-HS-HEAT SINK 11, 2 IPHeat Sink Performance7111107T08/24/200908/28/2009PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 11, 2 IPAlert and Notification System Testing711140210/19/200910/23/20091, 2 IPEmergency Response Organization Augmentation Testing711140310/19/200910/23/20091, 2 IPEmergency Action Level and Emergency Plan Changes711140410/19/200910/23/20091, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140510/19/200910/23/20091, 2 IPPerformance Indicator Verification7115110/19/200910/23/2009EB3ISI-UNIT 2 INSERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P11/02/200911/06/2009EB3TI172-TI-172 RCS DM BUTT WELDS 12 IPReactor Coolant System Dissimiliar Metal Butt Welds2515/17211/02/200911/06/2009EB3SGISI-UNIT 2 STEAM GENERATOR ISI 12 IPInservice Inspection Activities - PWR7111108P11/09/200911/13/2009OL EXAM-INITIAL EXAM PREP 31 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIESV2328712/07/200912/11/2009PSB1-RP-RP GROUND WATER INITIATIVE 11, 2 IPReview of the Implementation of the Industry Ground Water Protection Voluntary Initiative2515/17312/07/200912/11/2009This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Inspection / Activity PlanPage 2 of 203/04/200909:26:28Report 2203/01/2009

-06/30/2010UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSequoyahOL EXAM-INITIAL EXAM - WEEK 1 31 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIESV2328701/18/201001/22/2010OL EXAM-INITIAL EXAM - WEEK 2 31 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIESV2328701/25/201001/29/2010CDBI-COMPONENT DESIGN BASES INSPECTION 71, 2 IPComponent Design Bases Inspection711112103/01/201003/05/20101, 2 IPComponent Design Bases Inspection711112103/15/201003/19/20101, 2 IPComponent Design Bases Inspection711112103/29/201004/02/20101, 2 IPComponent Design Bases Inspection711112104/12/201004/16/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.