North Anna, Units 1 & 2, Surry, Units 1 & 2, and Isfsis, Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Rev. 18
ML13224A247
Person / Time
Site: Millstone, Surry, North Anna, 07200055, 07200021  Dominion icon.png
Issue date: 08/06/2013
From: Blasioli P A
Dominion, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
13-126B
Download: ML13224A247 (3)


Text

.1Dominionr' Dominion Resources Services, Inc.Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, \'A 23060 Safeguards Information August 6, 2013 Re: 10 CFR 50.54 10 CFR 72.186 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001 Serial No.: NL&OS/MAE:

Docket Nos.: DOMINION NUCLEAR CONNECTICUT, INC.VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1, 2, AND 3 License Nos.: NORTH ANNA POWER STATION UNITS I AND 2 SURRY POWER STATION UNITS I AND 2 AND ASSOCIATED ISFSIs SUBMITTAL OF SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)SECURITY PROGRAM -REVISION 18 13-126B RO 50-245/336/423 50-338/339 50-280/281 72-2/16/47/55/56 DPR-21/65 NPF-49 NPF-4/7 DPR-32/37 SNM-2501/2507 Pursuant to 10 CFR 50.54(p)(2) and 10 CFR 72.186(b), Revision 18 of Millstone, North Anna and Surry's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program is provided as an enclosure to this letter. This plan became effective August 3, 2013. The changes that were made to the plan did not decrease the safeguards effectiveness of the plan.The enclosed material contains Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Sincerely, Paul A. Blasioli Director Nuclear Protection Services and Emergency Preparedness for Dominion Nuclear Connecticut, Inc.Virginia Electric and Power Company Classified By: Name: Dan Criswell Title: COORD NUCLEAR SECURITY PROGRAMS Organization:

Nuc. Protection Services/

Dominion Effective Date: July 31, 2013 11 Unauthorized Disclosure Of Safeguards Information Will Be ISubiect To Civil And Criminal Sanctions II NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED." Safeguards Information 0 KSSZ(v ncc> ý,

Safeguards Information Serial No. 13-126B Sec., T&Q, and Conting. Plan Submittal Page 2 of 3 Enclosure (Safeguards Information)

Commitments made by this letter: None cc: U. S. Nuclear Regulatory Commission, Region I Attn.: Regional Administrator 2100 Renaissance Blvd.Suite 100 King of Prussia, PA 19406-2713 U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. J. M. Goshen (Without Enclosure)

NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. J. Davis (Without Enclosure)

NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. J. Giebel (Without Enclosure)

NRC Project Manager Millstone Unit 1 U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED." Safeguards Information Safeguards Information Serial No. 13-126B Sec., T&Q, and Conting. Plan Submittal Page 3 of 3 Ms. N. S. Morgan (Without Enclosure)

NRC Project Manager Millstone Units 2 & 3 U. S. Nuclear Regulatory Commission Mail Stop 0-8-C 2A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton (Without Enclosure)

NRC Project Manager Surry U. S. Nuclear Regulatory Commission Mail Stop 0 8G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas (Without Enclosure)

NRC Project Manager North Anna U. S. Nuclear Regulatory Commission Mail Stop 0 8G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. L. A. Kauffman (Without Enclosure)

NRC Inspector 2100 Renaissance Blvd.Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector (Without Enclosure)

Millstone Power Station NRC Senior Resident Inspector (Without Enclosure)

North Anna Power Station NRC Senior Resident Inspector (Without Enclosure)

Surry Power Station NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED." Safeguards Information