Millstone, Unit 3, Withholding from Public Disclosure, AW-05-2060, Pressurizer Spray Line Weld Repair
ML053400090
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/06/2006
From: Nerses V
Plant Licensing Branch III-2
To: Maurer B F
Westinghouse
Nerses V, NRR//DLPM, 415-1484
References
AW-05-2060, TAC MC8609
Download: ML053400090 (4)


Text

March 6, 2006Mr. B. F. Maurer, Acting ManagerRegulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services

P.O. Box 355 Pittsburgh, PA 15230-0355

SUBJECT:

WESTINGHOUSE ELECTRIC COMPANY, LLC, REQUEST FORWITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE AW-05-2060 RELATED TO MILLSTONE POWER STATION, UNIT NO. 3, PRESSURIZER SPRAY LINE WELD REPAIR (TAC NO. MC8609)

Dear Mr. Maurer:

By letter dated October 19, 2005, Westinghouse Electric Company, LLC submitted an affidavitdated October 19, 2005, executed by R. B. Sisk, in which you requested that the informationcontained in the following documents be withheld from public disclosure pursuant to Title 10 of

the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:Westinghouse Drawing 10051C91, Revision 1Westinghouse Drawing 379445B The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons: a) The information reveals the distinguishing aspects of a process (or component,structure, tool, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. b) Its use by a competitor would reduce his expenditure of resources or improve hiscompetitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Westinghouse Drawing 10051C91, Revision 1, marked as proprietary, andWestinghouse Drawing 379445B, marked as proprietary, will be withheld from public disclosurepursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

B.F. Maurer-2-Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand thatthe NRC may have cause to review this determination in the future, for example, if the sc ope ofa Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any publicdisclosure.If you have any questions regarding this matter, I may be reached at 301-415-1484. Sincerely,/RA by EMiller for

/Victor Nerves, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-423 cc: See next page B.F. Maurer-2-Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand thatthe NRC may have cause to review this determination in the future, for example, if the sc ope ofa Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any publicdisclosure.If you have any questions regarding this matter, I may be reached at 301-415-1484. Sincerely,/RA by EMiller for/Victor Nerves, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-423 cc: See next page DISTRIBUTION

PUBLIC LPL1-2 R/F RidsNrrPMVNerses RidsAcrsAcnwMailCenter RidsNrrLACRaynor RidsNrrDorlLplb RidsRgn1MailCenter RidsOgcRpRidsNrrPMGWunderAccession Number: ML053400090OFFICELPL1-2/PMLPL1-2/LANRR/DCI/CVIBLPL1-2/BCNAMEVNerses:cmCRaynorTChanDRobertsDATE3/17/062/17/063/06/063/06/06Official Record Copy Millstone Power Station, Unit No. 3 cc:

Mr. B.F. Maurer, Acting ManagerRegulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services

P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355Lillilan M. Cuoco, EsquireSenior Counsel Dominion Resources Services, Inc.

Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385Edward L. Wilds, Jr., Ph.D.Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406First SelectmenTown of Waterford 15 Rope Ferry Road Waterford, CT 06385Mr. John MarkowiczCo-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385Mr. Evan W. WoollacottCo-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070Senior Resident InspectorMillstone Power Stationc/o U.S. Nuclear Regulatory Commission

P. O. Box 513 Niantic, CT 06357Ms. Nancy Burton147 Cross Highway Redding Ridge, CT 00870Mr. Joseph Roy, Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street

P.O. Box 426 Ludlow, MA 01056Mr. J. Alan PriceSite Vice President Dominion Nuclear Connecticut, Inc.

Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385Mr. Chris FunderburkDirector, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

5000 Dominion Boulevard Glen Allen, VA 23060-6711Mr. David W. DodsonLicensing Supervisor Dominion Nuclear Connecticut, Inc.

Building 475, 5 th FloorRope Ferry Road Waterford, CT 06385