ML060250044

From kanterella
Revision as of 05:29, 29 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Duke Power NFPA-805 Transition Pilot Observation Project Status, Oconee, November 10, 2005
ML060250044
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/10/2005
From:
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
Shared Package
ML060240605 List:
References
Download: ML060250044 (10)


Text

1Duke PowerNFPA-805 TransitionPilot ObservationProject StatusOconee (ONS)November 10, 2005 2AgendaReconstitution Project StatusNFPA-805 Contract StatusNFPA-805 Project StatusFire PRA StatusDuke 3-Site Transition ScheduleOconee Transition ScheduleNFPA-805 Project OrganizationNear Term Tasks 3Reconstitution Project StatusAll three sites have funding approved with contracts in placeONS Unit 2 /Common Reconstitution Analysis is completeMNS currently has AREVA on site performing reconstitution for both units expected completion date of July 2006ONS currently has AREVA performing reconstitution for ONS Unit 3 with expected completion date of September 2006CNS currently has AREVA performing reconstitution for both units with expected completion date of July 2007 4NFPA-805 Contract StatusONS currently has KleinsorgGroup Risk Services, LLC assisting in performing the NFPA-805 TransitionONS recently issued a contract to ERIN Engineering & Research, Inc. to assist in performing the Fire PRA in support of the transition to NFPA-805 5Fire PRA StatusSub-Task 5.1 -Plant Boundary Definition and PartitioningComplete. Need to complete documentation. Will be included in the Fire Ignition Frequency CalculationSub-Task 5.2 -Fire Ignition Frequencies95% complete.Working on Transient Fire Calculation. EPRI/NRC Method is not clear on Categorizing Maintenance Tasks via work orders or hot work.Comments to EPRI on Bus Bar Explosive FiresSub-Task 5.3 -Fire PRA Component SelectionIn Progress. Completed BEMAP (PRA to Basic Event Mapping) for Unit 3, working on other 2 units and mapping to Appendix (ARTRAK) database.Sub-Task 5.4 -Fire PRA Cable SelectionWill start in December. Database design is key. Sub-Task 5.5 -Qualitative ScreeningNot going to perform Qualitative Screening (will quantify all Fire Compartments) 6Fire PRA StatusSub-Task 5.6 -Fire-Induced Risk ModelSub-Task 5.7 -Quantitative ScreeningSub-Task 5.8 -Scoping Fire ModelingSub-Task 5.9 -Detailed Circuit Failure Analysis (combined w/ 5.10)Sub-Task 5.10 -Circuit Failure Mode Likelihood AnalysisSub-Task 5.11 -Detailed Fire ModelingSub-Task 5.12 -Post-Fire Human Reliability AnalysisSub-Task 5.13 -Seismic-Fire Interactions AssessmentSub-Task 5.14 -Fire Risk QuantificationSub-Task 5.15 -Uncertainty and Sensitivity AnalysisSub-Task 5.16 -Fire PRA Documentation 7Duke 3-SiteTransition ScheduleONSMNSCNS20052006200720082009 1st 2nd 3rd4th 1st 2nd 3rd4th 1st 2nd 3rd4th 1st 2nd 3rd4th 1st 2nd 3rdONS NRC AuditMNS NRC AuditCNS NRC Audit(June)MNS - ReconstitutionONS Unit 0/2 ReconstONS Unit 3 Reconstitution (July 05 - Sept 06)ONS Transition to NFPA-805 (March 05 - March 07)ONS Fire PRACNS Transition to NFPA-805CNS Fire PRACNS - ReconstitutionMNS Transition to NFPA-805MNS Fire PRA 8Oconee NFPA-805 Transition Schedule 9NFPA-805 Transition Project OrganizationGeorge Mc AninchProject SponsorBob JohansenMNS Technical LeadDennis HennekeNGO PRA LeadSteve GrahamCable Testing LeadJulius BryantMNS PMDorothea MebaneMNS FPECable Test PMDavid GoforthCNS Technical LeadJames OldhamFire 3-Site LeadMatt HoganCNS FPEJim JonesCNS PMPaul BouldenONS Technical LeadExpert PanelOPS SROSystem EngineerElectrical EngineerDorothea MebaneMNS FPEDennis HennekeNGO PRA LeadSteve AlexanderONS PMHarold LefkowitzONS FPEExpert PanelOPS SROSystem EngineerElectrical EngineerHarold LefkowitzONS FPEDennis HennekeNGO PRA LeadExpert PanelOPS SROSystem EngineerElectrical EngineerMatt HoganCNS FPEDennis HennekeNGO PRA LeadCable Test Contractors as necessaryNFPA-805 Contractorsas necessaryHarry BarrettTransition Technical LeadBrandi WeaverNGO PRA ElectricalReene'GambrellRGC LeadRGC LeadTBDPRA Contractors as necessaryRGC LeadTBD 10Near Term Tasks(Next Six Months)Multiple Spurious Operations Expert PanelArmored Cable Fire Testing (1stQtr 2006)Chapter 3 Non-Fire Area Specific TransitionTransient Analysis Manual Action FeasibilityCAFTA Logic Pilot