Annual Assessment Meeting Cy 2005, Joseph M. Farley Nuclear Plant, April 18, 2006ML061140072 |
Person / Time |
---|
Site: |
Farley ![Southern Nuclear icon.png](/w/images/1/14/Southern_Nuclear_icon.png) |
---|
Issue date: |
04/18/2006 |
---|
From: |
NRC/RGN-II |
---|
To: |
|
---|
Shared Package |
---|
ML061140063 |
List: |
---|
References |
---|
Download: ML061140072 (17) |
|
|
---|
Category:Slides and Viewgraphs
MONTHYEARML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23139A2462023-05-19019 May 2023 Annual Assessment Public Meeting Slides (May 23, 2023) ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21280A0012021-10-31031 October 2021 Pre-Submittal Meeting Presentation from SNC to Discuss a Future LAR Regarding Change TS to Increase Containment Peak Pressure to Address Several NSALs ML21173A0632021-06-24024 June 2021 Pre-Application SNC Presentation Slides - Removal of Encapsulations from Recirculation Suction Valves ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21057A0182021-02-26026 February 2021 Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides) ML21036A1172021-02-0505 February 2021 SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20101K6582020-04-10010 April 2020 Annual Assessment ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19057A4762019-03-0707 March 2019 Presentation Slides Related to Pre-Application Public Meeting Regarding to Technical Specification 3.3.1 and 3.3.2 (L-2019-LRM-0010) ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation NL-18-1412, Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting2018-11-0808 November 2018 Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting ML18290B0942018-10-16016 October 2018 October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b. ML18065A0202018-03-12012 March 2018 March 12, 2018, Public Meeting Presentation ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures ML18065A0222018-03-0606 March 2018 March 12, 2018, Public Meeting - Draft 4b Application ML16260A1162016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides NL-16-0388, September 22, 2016, Public Meeting Presentation Slides2016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14115A4052014-04-25025 April 2014 2013 End of Cycle Farley Public Meeting Summary Memo ML14108A0052014-04-23023 April 2014 April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria. ML14120A2252014-04-23023 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion. ML14108A0042014-04-18018 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion ML13079A1502013-03-20020 March 2013 Summary of Public Meeting with Joseph M. Farley ML13078A2512013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19) ML13078A2552013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 10 ML13078A2542013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 9 ML13078A2532013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 8 ML13078A2522013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 6 ML13078A2452013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 1 (3/19) ML13078A2502013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 4 ML13078A2482013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 3 (3/19) ML13078A2472013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/20) ML13078A2462013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/19) IR 05000348/20110122011-07-15015 July 2011 Summary of Public Meeting with Joseph M. Farley Nuclear Plant, to Discuss Safety Significance of Preliminary White Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000348-11-012 and 05000364-11-012 ML1016705482010-06-0808 June 2010 Farley Nuclear Plant, NRC Screening Criteria Response ML1009805922010-04-0808 April 2010 Summary of Public Meeting to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2009 - December 31, 2009 - Joseph M. Farley Nuclear Plant ML0909210352009-03-19019 March 2009 Annual Assessment Meeting Presentation ML0819603642008-07-10010 July 2008 07/102008-Joseph M. Farley Regulatory Performance Meeting, Results of the NRC 95002 Supplemental Inspection ML0814901062008-05-22022 May 2008 Slides - Joseph M. Farley Nuclear Plant, Annual Public Assessment Meeting, ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0732413392007-09-19019 September 2007 Email from D. Decker, NRR to K. Cotton, NRR Et Al. Final Copy Farley Aitnrc Slides.Ppt ML0732413252007-09-18018 September 2007 Email from K. Cotton, NRR to S. Shaeffer, Rii on Final Farley Aitnrc Slides.Ppt ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0715901212007-05-30030 May 2007 Mrp/Prwog Mitigation Briefing, Industry Update PWROG Farley Zinc Program. ML0633400062006-11-29029 November 2006 SNC Farley Meeting Slides 2024-01-08
[Table view] |
Text
Annual Assessment Meeting CY 2005Joseph M. Farley Nuclear PlantDothan, ALApril 18, 2006 Purpose of Today's Meeting
!A public forum for discussion of plantperformance
!Licensee will be given the opportunityto respond to the information in the assessment letter and discuss new or existing programs to maintain orimprove their performance Agenda!Introduction
!Review of Reactor Oversight Process
!National Summary of Plant Performance
!Discussion of Plant Performance Results
!Licensee Response/Remarks
!Closing Remarks
!NRC available to address public questions Region II OrganizationDirector Division of Reactor SafetyHarold ChristensenDeputy DirectorVictor McCreeCurt Rapp - Sr. PEBob Carrion - PEProject Engineers (PE)Charles Patterson - Sr. RIJames Baptist - RIResident Inspec tor s (RI) Branch ChiefScott Schaffer (Acting)Director Division of Reactor ProjectsJoseph SheaDeputy DirectorCharles CastoRegional AdministratorLoren PliscoDeputy Regional AdministratorDr. Willam Travers NRC Performance Goals P RI MA RY GO ALS!Ensure protection of the public health and safetyand of the environment
!Ensure the secure use and management ofradioactive materials OTH ER GOA LS!Openness in the regulatory process
!Regulatory actions are effective, efficient,realistic, and timely
!Excellence in NRC management to carry outthe NRC's strategic objective Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Examples of Baseline Inspections
!Equipment Alignment ~80 hrs/yr
!Fire Protection ~200 hrs triennially
!Operator Response ~125 hrs/yr
!Emergency Preparedness ~80 hrs/yr
!Rad Release Controls ~110 hrs biennially
!Worker Radiation Protection ~90 hrs/yr
!Corrective Action Program ~250 hrs biennially
!Corrective Action Case Reviews ~60 hrs/yr Performance Thresholds Safety Signific a n ceGreen:Very Low Safety IssueWhite:Low to Moderate Safety Issue Yellow: Substantial Safety IssueRed: High Safety Issue NRC Ins pe c tion Eff ortsGreen:Only Baseline InspectionWhite:May increase NRC oversight Yellow: Increased NRC oversight Red:Increased NRC oversight and other actions Action Matrix ConceptIncreasing Safety SignificanceIncreasing NRC Inspection EffortsIncreasing NRC/Licensee Management Involvement Increasing Regulatory ActionsLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance National Summary of Plant PerformanceStatus at End of CY 2005Licensee Response 84Regulatory Response 12Degraded Cornerstone 4Multiple/Repetitive Degraded Cornerstone 3Unacceptable 0Total 103 2005 Inspection Activities5300 hours0.0613 days <br />1.472 hours <br />0.00876 weeks <br />0.00202 months <br /> of inspection related activities
!Unit 2 Reactor Vessel Head Replacement
!Pressurizer Penetrations
!Emergency Preparedness Exercise
!Triennial Fire Protection
!Radiation Protection
!Biennial Problem Identification & Resolution
!Plant Modifications
!Maintenance Rule Implementation
!Independent Spent Fuel Storage Installation Assessment Results
!All inspection findings were classifiedas very low safety significance (Green)
!All Performance Indicators were GreenPlant performance was within the LicenseeResponse Column of the NRC's Action Matrix Assessment Summary
!Southern Nuclear Operating Companyoperated Farley in a manner thatpreserved public health and safety
!All cornerstone objectives were met
!NRC plans baseline inspections forthe remainder of 2006 2006 Scheduled Inspection Activities
!Biennial Component Design Basis
!Biennial Emergency Preparedness Exercise
!In-service Inspections
!Radiation Protection
!Independent Spent Fuel Storage Facility
!Heat Sink!Reactor Operator Initial Licensing Examinations
!Reactor Operator Requalification ProgramIn addition to Resident Inspector daily inspections Annual Assessment Meeting Licensee Response/Remarks Contacting the NRC
!Report an emergency(301) 816-5100 (call collect)
!Report a safety concern (334) 899-3386, 3387 (Resident Inspectors) (800) 695-7403 Allegation@nrc.gov
!General information or questions www.nrc.govSelect "What We Do" for Public Affairs Reference Sources
!Reactor Oversight Processwww.nrc.govSelect Nuclear Reactors, Operating Reactors,Oversight, Reactor Oversight Process
!Public Electronic Reading Roomwww.nrc.govSelect Electronic Reading Room
!Public Document Room1-800-397-4209 (Toll Free)