ML061710356

From kanterella
Revision as of 07:33, 27 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Control Room JPMs for the Braidwood Initial Examination - May 2006
ML061710356
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/15/2006
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
References
Download: ML061710356 (46)


Text

SIM-108 1 TASK TITLE:

Emergency Borate During an ATWS from RWST JPM No.: SIM-108 REV: NRC2006301TPO No.: 4D.OA-08 K&A No.: 000029EK3.12 TASK No.: R-FR-018, Respond to an ATWS K&A IMP: 4.4/4.7 TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 5, 6 APPROX COMPLETION TIME 10 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwFR-S.1, Rev. 1A WOG 1C, Response to Nuclear Power Generation/ATWS.

MATERIALS:

1. 1BwFR-S.1, Rev. 1A WOG 1C TASK STANDARDS:
1. Determine emergency boration flowpath from BAST unavailable.
2. Manually align CV system to perform emergency boration of RCS from the RWST prior to completion of step 4 of 1BwFR-S.1.

TASK CONDITIONS:

1. You are an extra NSO.
2. The turbine has tripped without a reactor trip from high power.
3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.

INITIATING CUES:

1. The simulator is frozen and annunciator panel horns are turned off.
2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-

S.1. All other steps of 1BwFR-S.1 are being addressed by other NSOs. All

annunciator horns are silenced.

3. Notify the US when emergency boration flow has been initiated.
4. When you are ready to begin the JPM, the simulator will be placed in run.

Annunciator horns will be left OFF to minimize noise during JPM performance.

SIM-108 2 RECORD START TIME Note: After giving the initiating cue, cue the simulator operator to start the simulator.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwFR-S.1 Step 4 Note: Examinee will use simulator copy of 1BwFR-S.1 for JPM

performance.

Locate and Open 1BwFR-S.1

to Step 4 SAT UNSAT N/A Comments: 2. Check at least one Centrifugal Charging pump

running Determine one CV pump is

running: OBSERVE RUN light

indication and/or

ammeter for 1A CV pump OBSERVE flow indicated

on 1FI-121A, charging

header flow indicator SAT UNSAT N/A Comments: 3. Initiate emergency boration

from BAST Attempt to initiate

emergency boration from

the BAST as follows: Attempt to OPEN

1CV8104 Determine emergency

boration flow cannot

be established from

BAST SAT UNSAT N/A Comments: Note: Alternate path begins here Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow

from either the RWST or BAST (using normal RMCS boration flowpath). If examinee

attempts to establish emergency boration via RMCS, the boric acid transfer pump will not

start. (See JPM step 6 if examinee attempts emergency boration via RMCS)

  • 4 Align CV pump suction to the RWST Perform the following at

1PM05J: OPEN 1CV112D and/or

1CV112E SAT UNSAT N/A Comments: *5 Isolate CV pump suction from the VCT Perform the following at

1PM05J: CLOSE 1CV112B and/or

1CV112C SAT UNSAT N/A Comments:

SIM-108 3 PERFORMANCE STEP STANDARD Circle applicable

  • 6 Maximize Charging flow Perform the following at 1PM05J: Place 1CV121 in

manual and raise

demand o OBSERVE 1FI-121A

increasing o VERIFY letdown

established SAT UNSAT N/A Comments: Examiners note: 1BwFR-S.1 step 4 RNO column allows establishing emergency boration flow

from either the RWST or BAST (using normal RMCS boration flowpath). If examinee

attempts to establish emergency boration via RMCS, the boric acid transfer pump will not

start. See JPM step 4 for emergency boration via RWST steps.

7. Initiate emergency boration from RMCS (N/A if not

performed)

Attempt to initiate

emergency boration from

RMCS as follows: OPEN 1CV110A OPEN 1CV110B Attempt to start boric

acid transfer pump Determine emergency

boration flow cannot

be established from

RMCS SAT UNSAT N/A Comments: 8. Check Pressurizer Pressure <

2335 psig CHECKS Pzr Pressure <

2335 psig as follows: OBSERVES PZR Pressure

indicators o Operate PZR PORV(s) as

necessary until

pressure <2135 psig, then close PZR PORV(s)

SAT UNSAT N/A Comments: 9. Notify Unit Supervisor CUE: Acknowledge reports.

Perform the following:

o Notify the Unit Supervisor emergency

boration flow is

established o Notify Unit Supervisor of 1CV8104 failure to

open SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

SIM-108 4 TASK CONDITIONS:

1. You are an extra NSO.
2. The turbine has tripped without a reactor trip from high power.
3. 1BwFR-S.1. Response to Nuclear Power Generation/ATWS is in progress.

INITIATING CUES:

1. The simulator is frozen and annunciator panel horns are turned off.
2. The US has directed you to perform an Emergency Boration per step 4 of 1BwFR-S.1.

All other steps of 1BwFR-S.1 are being addressed by other NSOs. All annunciator horns

are silenced.

3. Notify the US when emergency boration flow has been initiated.
4. When you are ready to begin the JPM, the simulator will be placed in run.

Annunciator horns will be left OFF to minimize noise during JPM performance.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

Complete items on Simulator Ready for Training Checklist Place simulator in RUN.

Run caep SIM-108 from disk and verify the following actuate:

IMF RP02A IMF RP02B V8104 CLS IOR ZDI1C IMF CV03 IOR ZDIRMIO IN IOR ZDIBKSEL MAN IRF TC03 TRIP Start both AF pumps.

Place simulator in freeze.

Turn off simulator horns.

Verify simulator copy of 1BwFR-S.1 is place kept through step 3.

Verify all other place keeping marks removed.

At examiner's cue, place simulator in run.

If running the JPM repetitively, perform the following:

Open 1CV112B & C Close 1CV112D & E Restore 1CV121 to automatic Verify simulator copy of 1BwFR-S.1 is place kept through step 3.

Verify all other place keeping marks removed.

Place simulator in freeze.

Turn off simulator horns.

C OMMENTS: SIM-108 5 (Final)

SIM-219 1 TASK TITLE:

Establish Automatic Pzr Level Control with Failed 1CV121 JPM No.: SIM-219 REV: NRC2006301TPO No.: 4C.GP-06 K&A No.: 011000A4.04 TASK No.: R-GP-053, Transfer Pzr level control K&A IMP: 3.2/2.9 from manual to automatic.

TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 2, 4 APPROX COMPLETION TIME 8 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwGP 100-1, Rev. 22, Plant Heatup.

MATERIALS:

1. 1BwGP 100-1, Rev. 22, Step 62.

TASK STANDARDS:

1. Determine 1CV121 failed high.
2. Operate 1CV121 in manual to control pressurizer level and RCP seal injection flow prior to completing 1BwGP 100-1, step F.62.

TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The Unit is at full power.
3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
4. Actual pressurizer level and demanded pressurizer level have been matched for

16 minutes.

INITIATING CUES:

1. The US has directed you restore automatic pressurizer level control per the

applicable portions of step F.62 of 1BwGP 100-1.

2. Inform the US when automatic pressurizer level control is established.

SIM-219 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwGP 100-1 step 62 Note: Examinee will use simulator copy of 1BwGP 100-1 for JPM

performance. CUE: All Prerequisites, Precautions, Limitations and

Actions have been met.

Locate and open 1BwGP

100-1 to step F.62 SAT UNSAT N/A Comments: Examiner's note: When examinee places 1FK-121 in automatic, 1CV121 will fail to 100%

open. *2. Place Pressurizer Level control in Automatic Perform the following at

1PM05J to establish

automatic pressurizer

level control:

o ADJUST 1CV121 in

MANUAL to match PZR

actual level with

demanded level o MAINTAIN PZR actual

and demanded level

equal for 10-15

minutes o VERIFY/PLACE 1LK-459, Master Pzr Level

Controller in MANUAL PLACE 1CV121 in AUTO SAT UNSAT N/A Comments: Note: Alternate path begins here

3. Identify 1FK-121 (1CV121) failure Identify 1FK-121 (1CV121)

failure o Annunciator 1-9-D3, CHG LINE FLOW

HIGH/LOW o Identify 1CV121

demand signal rising

to 100% and 1CV121

throttling to full

open SAT UNSAT N/A Comments:

SIM-219 3 PERFORMANCE STEP STANDARD Circle applicable

  • 4. Mitigate the pressurizer level transient caused by an increase in charging flow Perform the following to

mitigate the failure of

1CV121: PLACE 1FK-121 (1CV121)

in MANUAL REDUCE demanded signal

to throttle charging

flow to maintain a

stable pressurizer

level at program value

with no seal injection

low flow annunciators

lit. SAT UNSAT N/A Comments: 5. Inform US of 1CV121 controller failure. CUE: As US, acknowledge failure of 1CV121 and

that you will inform

maintenance Inform US of 1CV121

failure SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

SIM-219 4 TASK CONDITIONS:

1. You are the Unit 1 NSO.
2. The Unit is at full power.
3. One hour ago, Pzr Level Channel 1LT-459 was restored from test.
4. Actual pressurizer level and demanded pressurizer level have been matched for 16 minutes. INITIATING CUES:
1. The US has directed you restore automatic pressurizer level control per the

applicable portions of step F.62 of 1BwGP 100-1.

2. Inform the US when automatic pressurizer level control is established.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

Complete items on Simulator Ready for Training Checklist Place simulator in RUN.

Place 1CV121 in MANUAL Place Master PZR Level Controller to MANUAL Insert IMF CV10 100 Verify 1BwGP 100-1 place keeping marks are removed.

OMMENTS: C (Final) SIM-219 5 SIM-204 1 TASK TITLE:

Raise SI Accumulator Level with 1A SI pump (375 psig in RCS)

JPM Number:

SIM-204 Rev. NRC2006301TPO No.: 4C.SI-02 K&A No.: 006000A1.13 Task No.: R-SI-001, Fill the SI accumulators K&A Imp.: 3.5/3.7 TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES Critical Elements:

(*) 4, 6, 9, 11-13, 16, 21, 22 Approx. Completion Time:

45 minutes Critical Time:

N/A EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwAR 1-5-C1, Rev. 8E2, ACCUM 1C LEVEL HIGH/LOW
2. BwAR 1-5-C2, Rev 6E3, ACCUM 1C PRESS HIGH/LOW
3. BwOP SI-5, Rev. 22, Raising SI Accumulator Level with SI Pumps
4. BwOP SI-9, Rev 11, Lowering SI Accumulator Pressure
5. Tech Spec 3.5.1 MATERIALS:
1. Copy of BwAR 1-5-C1
2. Copy of BwAR 1-5-C2, if needed
3. Copy of BwOP SI-5
4. Copy of BwOP SI-9, if needed TASK STANDARDS:
1. Determine 1A SI train required to be isolated from RCS cold legs during fill of 1C SI Accumulator.
2. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to completion

of BwOP SI-5, step F.8b.5.

3. Restore 1C SI Accumulator Level within Tech. Spec. limit prior to JPM

completion.

TASK CONDITIONS:

1. You are the Unit 1 Extra NSO.
2. RCS heat up is in progress per 1BwGP 100-1.
3. Unit 1 is in Mode 3, RCS temperature is 360°F and RCS pressure is 375 psig.
4. All systems and controls are normal for the present conditions.

INITIATING CUES:

1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.
2. The US has directed you to raise the 1C accumulator level to > 38% but within

the Technical Specification limit by using the 1A SI pump. Other control room

operators are maintaining all other plant conditions. NLOs have been briefed

and are standing by as needed.

3. Inform the US when you have restored 1C SI accumulator level.
4. There a NO personnel in Unit 1 Containment.

SIM-204 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwAR 1-5-C1, ACCUM 1C LEVEL HIGH LOW CUE: When student locates correct procedure, provide copy. CUE: If asked as US, confirm that DEQUIP

has been entered for

1C SI Accumulator

level, LCO 3.4.13 has

been reviewed, and AAR

1BwOS SI-1a is being

reviewed.

Locate and open BwAR 1-5-C1 and perform

the following:

o Monitor 1LI-954 and

955 to determine level

is low. o Monitor SER points

0581 and 2042 to

determine level is

low. Monitor 1PI-964 and

965 to determine

pressure is stable.

o Notify US to enter LCO 3.5.1. SAT UNSAT N/A Comments: 2. Refer to BwOP SI-5, Raising SI Accumulator Level with SI

Pumps. CUE: When examinee locates correct procedure, provide copy. CUE: All Prerequisites, Precautions, Limitations and

Actions are met. CUE: If asked as US, RWST recirc pump and

purification loop are

not running, and RWST

boron is 2300 ppm and

has not been diluted

since last sampled.

Locate and open BwOP SI-

5: SAT UNSAT N/A Comments: Examiner's note: 1SI8806 and 8813 are SVAG valves and are maintained deenergized.

Their position may be verified on the 1PM06J Group 1 or 4 Readiness Lights, 1PM06J SVAG

Valve Status Lights, or locally. The examinee should NOT energize 1SI8806 and/or

1SI8813 per BwOP SI-100 in order to check 1SI8806 and/or 1SI8813 position using the

indicating lights at 1PM06J. Energizing 1SI8806 and/or 1SI8813 is NOT necessary since

the valves are in their correct position and energizing 1SI8806 and/or 1SI8813 would

make BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.

SIM-204 3 PERFORMANCE STEP STANDARD Circle applicable

3. Verify valve alignment. (steps F.1 - F.4) CUE: If asked to verify valves locally, as NLO report all valves are

OPEN. At 1PM06J, perform the

following: VERIFY/OPEN: 1SI8806 1SI8923A o 1SI8923B 1SI8814 1SI8813 o 1SI8920 SAT UNSAT N/A Comments: *4 Align 1A SI Pump to Accumulator fill header. (step F.5)

At 1PM06J, perform the

following: OPEN 1SI8888 SAT UNSAT N/A Comments: 5. Verify SI to Radwaste flowpath isolated. (step F.6)

At 1PM11J, perform the

following: Verify/CLOSE 1SI8964 SAT UNSAT N/A Comments: *6. Align Accumulator for fill. (step F.7)

At 1PM06J, perform the

following: OPEN 1SI8871 SAT UNSAT N/A Comments: 7. Determine applicable plant status for accumulator fill (step F.8)

Determine plant status

for accumulator fill Unit 1 in Mode 3 (RCS

temperature > 350 F, Keff <0.99) RCS pressure 1850 psig Determine BwOP SI-5, step F.8.b applicable

for 1C SI accumulator

fill SAT UNSAT N/A Comments: 8. Initiate LCOAR 1BwOL 3.5.2. (step F.8.b) CUE: As US, acknowledge LCOAR 3.5.2 entry

requirement.

Inform US of need to

enter LCOAR 1BwOL 3.5.2. Determine LCO 3.5.2

entry required prior

to closing 1SI8821A SAT UNSAT N/A Comments:

SIM-204 4 PERFORMANCE STEP STANDARD Circle applicable

  • 9. Isolate 1A SI Pump from Cold Legs. (step F.8.b.1)

At 1PM06J, VERIFY/CLOSE: 1SI8821A SAT UNSAT N/A Comments: Examiner's note: 1SI8802A is SVAG valve and is maintained deenergized; its position may be verified on the 1PM06J Group 1 or 5 Readiness Lights, 1PM06J SVAG Valve Status

Lights, or locally. The examinee should NOT energize 1SI8802A per BwOP SI-100 in order

to check valve position using the indicating lights at 1PM06J. Energizing 1SI8802A is

NOT necessary since it is in their correct position and energizing 1SI8802A would make

BOTH trains of ECCS inoperable and unnecessarily place Unit 1 in Tech Spec 3.5.2.

10. Verify/close 1SI8802A, SI to Hot Legs 1A and 1D Isol vlv. (step F.8.b.2) CUE: If asked to verify 1SI8802A position

locally, as NLO report

1SI8802A is CLOSED.

At 1PM06J, perform the

following: VERIFY/CLOSE 1SI8802A SAT UNSAT N/A Comments: Examiner's note: Student may elect to have an NLO do a prestart check of 1A SI pump

prior to starting. If so, provide the following CUE: CUE: NLO reports that the 1A SI Pump is ready for a start.

  • 11. Start 1A SI pump. (step F.8.b.3)

CUE: If dispatched as NLO to monitor pump start

locally, report

satisfactory start of

1A SI pump shortly

after pump started.

At 1PM06J, perform the

following:

o Announce pump start on plant page Start 1A SI Pump.

o Check 1A SI Pump Run

Light LIT.

o Check 1A SI Pump amps.

SAT UNSAT N/A Comments: *12. Fill 1C Accumulator. (step F.8.b.4)

At 1PM06J, perform the

following: OPEN 1SI8878C o Monitor Accumulator

Level. SAT UNSAT N/A Comments: *13. Stop filling accumulator when level is within Tech

Spec limits. (step F.8.b.5) Note: Per the initiating cue, direction was

given to restore

level to >38% but <

63%. CUE: As US, acknowledge report of 1C SI

Accumulator level

restoration.

At 1PM06J, perform the

following: CLOSE 1SI8878C when Accumulator Level is

>38%, but prior to

exceeding 63%. Inform US 1C SI Accumulator level

restored within Tech

Spec limits.

SAT UNSAT N/A Comments:

SIM-204 5 PERFORMANCE STEP STANDARD Circle applicable

14. Stop 1A SI pump. (step F.8.b.6)

At 1PM06J, perform the following: Stop 1A SI Pump.

o Check 1A SI Pump Stop

Light LIT.

SAT UNSAT N/A Comments: 15. Depressurize SI pump discharge header to less

than 50 psig. (step F.8.b.7 - F.8.b.8)

Depressurize the fill

header to less than 50

psig: At 1PM11J, open

1SI8964 At 1PM06J, monitor 1A

SI pump discharge

header pressure (1PI-

919/923). When pressure is less

than 50 psig, perform

the following at

1PM11J: CLOSE 1SI8964 SAT UNSAT N/A Comments: *16. Restore 1A SI pump to Cold Legs. (step F.8.b.9) CUE: Acknowledge exit LCOAR 1BwOL 3.5.2.

At 1PM06J, perform the

following: OPEN 1SI8821A SAT UNSAT N/A Comments: 17. Isolate SI pump from Accumulator. (step F.11 & F.12)

At 1PM06J, close

Fill/Test line Isolation

valves: 1SI8871 1SI8888 SAT UNSAT N/A Comments: 18. Inform US that it may be necessary to initiate 1BwOS

SI-1A, and to contact

chemistry for Accumulator

samples, and exit LCOAR for

level. (step F.13 & 14)

CUE: US will evaluate the need to perform 1BwOS

SI-1a and will inform

chemistry, and exit

LCOAR. Inform US of the

following potential

requirements: 1BwOS SI-1a Chemistry to sample

the Accumulators for

boron. Exit LCOAR from

Accumulator level.

SAT UNSAT N/A Comments:

SIM-204 6 PERFORMANCE STEP STANDARD Circle applicable Examiner's note: If 1C SI accumulator rises enough to cause annunciator 1-5-B2 to alarm during accumulator fill, examinee will perform JPM steps 19-23 to lower 1C SI

accumulator pressure. If annunciator 1-5-B2 is not in alarm, end JPM here and mark

steps 19-23 N/A.

19. Refer to BwAR 1-5-C2 CUE: When student locates correct procedure, provide copy. CUE: If asked as US, confirm that the LCOAR

(1BwOL 3.5.1) has been

entered, LCO 3.4.13

has been reviewed, and

AAR 1BwOS SI-1a is

being reviewed.

Locate and open BwAR 1-5-C2 and perform

the following:

o Monitor 1PI-964 and

965 to determine

pressure is high.

o Monitor SER points

0578 and 2045 to

determine level is

low. Monitor 1LI-954 and

955 to determine level

is stable.

o Notify US to enter LCO 3.5.1. SAT U Comments: NSAT N/A

20. Refer to BwOP SI-9, Lowering SI accumulator pressure. CUE: After examinee locates copy of procedure, provide a copy and

inform them all

prerequisites, precautions, limitations and

actions are met Perform the following Locate and open BwOP SI-9. Determine step F.1 is

the applicable step.

SAT UNSAT N/A Comments: *21. Lower 1B SI Accumulator pressure CUE: If asked, as US inform examinee that there are no personnel in

Unit 1 containment.

Perform the following to lower 1B SI Accumulator

pressure to 625 psig:

o Verify / Close 1AOV-

SI8880, N 2 Supply Isolation valve o Verify / Close

1SIHCV943, Vent

control valve Open 1AOV-SI8875C, SI

Accumulator 1C Vent

valve. Throttle open

1SIHCV943, Vent

control valve o Monitor 1PI-964/965 SAT UNSAT N/A Comments:

SIM-204 7 PERFORMANCE STEP STANDARD Circle applicable

Perform the following Verify 1C SI accumulator pressure

612-637 psig Close 1AOV-SI8875C o Close 1SIHCV943, Vent

Control valve.

SAT UNSAT N/A Comments: 23. Exit LOCAR 1BwOL 3.5.1 CUE: US acknowledges pressure restored and exits LCOAR.

Inform US that pressure is within the Tech Spec

limit, the alarm cleared, and the LCOAR may be

exited. SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

SIM-204 8 TASK CONDITIONS:

1. You are the Unit 1 Extra NSO.
2. RCS heat up is in progress per 1BwGP 100-1.
3. Unit 1 is in Mode 3, RCS temperature is 360°F and RCS pressure is 375 psig.
4. All systems and controls are normal for the present conditions.

INITIATING CUES:

1. Annunciator 1-5-C1, ACCUM 1C LEVEL HIGH/LOW, has been is lit.
2. The US has directed you to raise the 1C accumulator level to > 38% but within the Technical Specification limit by using the 1A SI pump. Other control room operators

are maintaining all other plant conditions. NLOs have been briefed and are standing

by as needed.

3. Inform the US when you have restored 1C SI accumulator level.
4. There a NO personnel in Unit 1 Containment.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 5, BOL hot shutdown, plant heat up in progress, 340 F, 375 psig.

Complete items on Simulator Ready for Training Checklist.

Place simulator in RUN.

Place 1B CV pump, 1A SI pump, and 1B SI pump in NAT.

Place PZR PORVs in AUTO.

Remove placards from 1SI8808A-D C/S.

Allow the RCS to heat up above 350 F. Modify SIMACC[3] TO 57,280 to lower 1C SI Accumulator level to 30%.

Modify SIMN2ACC[3] TO 1270 to lower 1C SI Accumulator pressure.

Place RCS Heatup Limits graphic display on right hand MCR CRT.

Verify/remove 1A SI pump data from HMI terminal screens.

Replace 1SI8808A-D placards when all examinees have completed JPM.

OMMENTS: C Provide copy of BwAR 1-5-C1, Rev. 8E2 Provide copy of BwAR 1-5-C2, Rev 6E3 Provide copy of BwOP SI-5, Rev. 22 Provide copy of BwOP SI-9, Rev 11 (Final) SIM-204 9 SIM-S403 1 TASK TITLE:

Swap Essential Service Water Pumps JPM No.: SIM-S403 REV: NRC2006301TPO No.: 4C.SX-03 K&A No.: 075000A4.01 TASK No.: R-SX-004, Operate the SX system K&A IMP: 3.2/3.2 TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 4, 6, 8 APPROX COMPLETION TIME:

25 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.

MATERIALS:

1. BwOP SX-7, Rev. 16, Swapping Essential Service Water Pumps.

TASK STANDARDS:

1. Manually open 1SX016B prior to completing BwOP SX-7, step F.2.
2. Start the 1B SX pump prior to securing the 1A SX pump.

TASK CONDITIONS:

1. You are the Assist NSO.
2. Both Units are at 100% power.
3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
4. NLOs have been briefed and are standing by to assist in the field.

INITIATING CUES:

1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump

per BwOP SX-7.

2. Inform the US when you have completed the pump swap.

SIM-S403 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwOP SX-7. CUE: When examinee locates correct procedure, provide copy. CUE: All Prerequisites, Precautions, Limitations and

Actions have been met.

Locate and open BwOP SX-

7. SAT UNSAT N/A Comments: 2. Verify 1B SX pump suction valve open. CUE: If requested, NLO reports that 1SX001B

is open. Perform the following at

1PM06J: Verify/Open 1SX001B.

SAT UNSAT N/A Comments: 3 Verify 1PR03J in service Perform the following at the RM-11 console o Verify 1PR03J cursor

status indicates

normal (green) on grid

1, grid 5, or grid 6.

SAT UNSAT N/A Comments: *4. Verify RCFC 1B and 1D inlet and outlet valves open.

Perform the following at

1PM06J: Place control switch

for 1SX016B to OPEN.

o Verify/Open 1SX027B.

SAT UNSAT N/A Comments: 5. Start 1A and 1B SX pump Aux.

Oil pumps.

Note: Simulator operator to start both Unit 1SX

pump aux. oil pumps

when called.

Direct NLO to locally

start 1A and 1B SX pump

Aux. Oil pumps.

(1SX01PA/B-C) o At 1PM06J verify 1A

and 1B SX pump Aux.

Oil pump run lights

lit. SAT UNSAT N/A Comments:

SIM-S403 3 PERFORMANCE STEP STANDARD Circle applicable

  • 6. Start 1B SX pump. CUE: If contacted as Unit 2 operator, acknowledge upcoming SX pump

swap. CUE: If dispatched as NLO to monitor 1B SX pump

start locally, report

satisfactory start of

1B SX pump shortly

after pump started.

Perform the following at

1PM06J: o Announce pump swap over plant page Start 1B SX pump by taking the control

switch to CLOSE until

pump starts.

SAT UNSAT N/A Comments: 7. Check running SX pumps parameters.

Perform the following at

1PM06J: Check ammeters for 1A and 1B SX pumps Determines 1A and 1B SX pumps amps

approximately equal. Checks 1PI-SX007 and 1PI-SX008 Determines 1A and 1B SX pumps discharge

pressure < 112 psig.

SAT UNSAT N/A Comments: *8. Stop 1A SX pump. CUE: If dispatched as NLO to monitor 1A SX pump

stop locally, report

satisfactory stop of

1A SX pump shortly

after pump stopped.

Perform the following at

1PM06J: Stops 1A SX pump by placing the control

switch to TRIP. Determines step F.7 is NOT applicable (1B SX

pump and 2A SX pump

are running)

SAT UNSAT N/A Comments: 9. Check 1B SX pump local operating conditions. CUE: As NLO, report all local operating

conditions for the

pump and strainer are

normal. CUE: As NLO, report 1A SX pump is not rotating.

Direct NLO to check the

following local operating

conditions: SX pump lube oil

temperature: 50-130 F. SX pump seals not

leaking. SX pump bearing

bracket drain holes

not plugged. Oil flow in bearing

oil return sightglass. 1SX01FB, strainer

control switch for 1B

SX pump in AUTO. 1A SX pump is not

reverse rotating.

SAT UNSAT N/A Comments:

SIM-S403 4 PERFORMANCE STEP STANDARD Circle applicable

11. Stop Aux. Oil pumps.

CUE: As NLO, report 1A & 1B SX pump Aux Oil pumps off as

they are secured.

Perform the following: Direct NLO to Stop

Aux. Oil pumps for 1A

and 1B SX pumps Verify 1A and 1B SX

pumps Aux. Oil pump

run lights OFF at

1PM06J. SAT UNSAT N/A Comments: 12. Startup 1B and 1D RCFC and Shutdown 1A and 1C RCFC.

CUE: All RCFCs are required for containment

cooling. Perform the following at

1PM06J: Verify All RCFCs are already running. Determine all RCFC required for CNMT

cooling SAT UNSAT N/A Comments: 13. Ensure SX Chem Feed system aligned properly. CUE: As NLO, acknowledge request. Direct NLO to perform

BwOP CF-36 as required. (N/A if examinee

determines step not

required)

SAT UNSAT N/A Comments: 14. Inform US SX pump swap complete CUE: Acknowledges report.

Inform US SX pump swap

complete Inform US SX pump swap

complete CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

SIM-S403 5 TASK CONDITIONS:

1. You are the Assist NSO.
2. Both Units are at 100% power.
3. Unit 2 has placed the 2A SX pump in service 5 minutes ago and requests that Unit 1 swap operating SX trains. 1B SX pump has been shutdown for 2 weeks.
4. NLOs have been briefed and are standing by to assist in the field.

INITIATING CUES:

1. The US has directed you to start the 1B SX pump and shutdown the 1A SX pump per BwOP

SX-7. 2. Inform the US when you have completed the pump swap.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

Complete items on Simulator Ready for Training Checklist Place simulator in RUN.

Verify/start 1A SX pump Verify/stop 1B SX pump Close 1SX016B RCFC 1B and 1D inlet isolation valve.

Remove SX Pump Trends from the HMI.

Run caep SIM-S403 from disk and verify the following actuate:

trgset 1 "ZLO1SX01PB(3)==1" trg 1 "IMF SW04 (0 3) 15000" trgset 2 "ZDI1SX01PA(1)==1" trg 2 "DMF SW04" To start/stop SX Pump Aux Oil Pumps, use the following remote functions:

RF SW03 ON / OFF RF SW04 ON / OFF OMMENTS: C Provide copy of BwOP SX-7, Rev. 16 (Final) SIM-S403 6 SIM-608 1 TASK TITLE:

Synchronize 1A EDG to Bus 141 and respond to Gov. Adj. malfunction.

JPM No.: SIM-608 REV: NRC2006301TPO No.: 4C.DG-06 K&A No.: 064000A4.06 TASK No.: R-DG-015, Operate the EDG K&A IMP: 3.9/3.9 TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 3, 4, 6 APPROX. COMPLETION TIME:

18 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP DG-11, Rev. 30, Diesel Generator Startup
2. 1BwOSR 3.8.1.2-1, Rev. 15, Unit One 1A Diesel Generator Operability Surveillance MATERIALS:
1. BwOP DG-11, Rev. 30, Diesel Generator Startup (steps 1-8 completed)
2. BwOP DG-11T1, Rev. 6, Diesel Generator Start/Stop Log (partially completed)
3. 1BwOSR 3.8.1.2-1, Rev. 15 (sections 1.0, 2.0, 4.0 completed.)

TASK STANDARDS:

1. Synchronize 1A Diesel Generator to bus 141
2. Recognize a failure of the Governor Adjust switch
3. Open 1A DG Output Circuit Breaker prior to completion of BwOP DG-11, step

F.9.l. TASK CONDITIONS:

1. You are the extra NSO.
2. All conditions are normal for current mode on Unit 1.
3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11

step F.4, and has been running unloaded for approximately fifteen minutes.

Step 9 is ready to be performed.

4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.

INITIATING CUES:

1. Using the partially completed procedures provided, (CUE: Hand examinee copy of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1) you have been directed by the Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.
2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.

SIM-608 2 RECORD START TIME

Note: Provide the partially completed copies of 1BwOSR 3.8.1.2-1, BwOP DG-11, and BwOP DG-11T1 to the examinee.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to 1BwOSR 3.8.1.2-1, 1A DG Operability Monthly

Surveillance. (Section F.

5.0) Refer to copy of 1BwOSR

3.8.1.2-1 provided Determine it is

necessary to parallel

and load 1A DG using

BwOP DG-11.

SAT UNSAT N/A Comments: 2. Refer to BwOP DG-11 CUE: All Prerequisites, Precautions, Limitations and

Actions are met Refer to BwOP DG-11 Determine step F.9 to

be used to parallel

and load 1A DG SAT UNSAT N/A Comments:

SIM-608 3 PERFORMANCE STEP STANDARD Circle applicable

  • 3. Parallel the 1A Diesel Generator CUE: If asked, this surveillance is NOT being performed in

conjunction with the

24-hour load run of

surveillance 1BwVSR

3.8.1.14-1.

Perform the following at

1PM01J: o VERIFY DG Frequency

~60Hz and Voltage

~4160V o Adjust DG frequency

to 60 Hz using Gov.

Adj. Control.

o Adjust DG voltage

to 4160V using Volt

Adj. Control.

o VERIFY approximately

the same voltage

exists across each

phase o Check voltage on

phases A-B, B-C, and A-C using the

DIESEL GEN.

VOLTMETER SELECT

Switch. Turn Sync Selector

Switch to ON for ACB

1413. Adjust Incoming (DG)

voltage (1EI-AP104B)

slightly higher (0-4.0

volts) than running

voltage (1EI-AP104A)

using the Volt Adj.

Control. Adjust Generator Speed

such that the

synchroscope (1SI-

AP104) is rotating

SLOWLY in the FAST

direction using the

Gov. Adj. Control. When the synchroscope

(1SI-AP104) is

slightly before the 12 o'clock position, CLOSE ACB 1413.

o Verify synchroscope

(1SI-AP104) "Locks in" at 12 o'clock

position.

SAT UNSAT N/A Comments:

SIM-608 4 PERFORMANCE STEP STANDARD Circle applicable Note: Alternate path begins here

  • 4 Attempt to load the 1A Diesel Generator Perform the following at 1PM01J: Attempt to load 1A DG

by going to RAISE on

the Gov Adj. Control Determine 1A DG OUTPUT

KW (1JI-DG002) NOT

rising Examiners note: The following step does not have to be performed prior to tripping ACB

1413. If the examinee trips ACB 1413 prior to turning the Synchroscope off mark this

step as N/A.

5. Turn the Synchroscope OFF.

Perform the following at

1PM01J: o Place the Sync

Selector Switch for DG

1A Feed to 4KV BUS 141

in OFF position.

SAT UNSAT N/A Comments: *6. Open 1A D/G output breaker. CUE: Examinee will be unable to load the 1A

DG. Procedure

guidance (note prior

to step F.9.f) is to

open ACB 1413. CUE: As US, acknowledge report of 1A DG

failure to load.

Perform the following at

1PM01J: OPEN ACB 1413 o Inform US of problem

encountered.

SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME

COMMENTS:

SIM-608 5 TASK CONDITIONS:

1. You are the extra NSO.
2. All conditions are normal for current mode on Unit 1.
3. The 1A Diesel Generator was SLOW started from the control room per BwOP DG-11 step F.4, and has been running unloaded for approximately fifteen minutes. Step 9 is

ready to be performed.

4. 1BwOSR 3.8.1.2-1 is in progress, and complete through step F.4.0.

INITIATING CUES:

1. Using the partially completed procedures provided, you have been directed by the

Unit Supervisor to complete Section F.5.0 of 1BwOSR 3.8.1.2-1.

2. Inform the US when you have completed section F.5.0 of 1BwOSR 3.8.1.2-1.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

Complete items on Simulator Ready for Training Checklist Place simulator in RUN.

Place 1A DG Auto Reclose Circuit Arm switch to SURV TEST Start 1A DG Insert IRF EG06 to clear 1A DG TROUBLE/FAIL TO START annunciator Adjust 1A DG (incoming) voltage lower than running voltage Adjust DG frequency to 60.2 Hz Place synch switch handle in ACB 1414 Run caep SIM-608 from disk and verify the following actuate:

trgset 1 "ZDI1HSDG026(3)==1" trg 1 "IOR ZDI1HSDG019 2" trgset 2 "ZDI1HSDG028(3)==1" trg 2 "IOR ZDI1HSDG022 2" If running the JPM repetitively, perform the following:

Delete Override DOR ZDI1HSDG022 DOR ZDI1HSDG019 Delete Override Reset Trigger 1 and 2 ning voltage.

Adjust DG voltage lower than run Adjust DG frequency to 60.2 Hz. Place synch switch handle in ACB 1414 COMMENTS:

Provide copy of 1BwOSR 3.8.1.2-1, rev 15, with sections 1.0, 2.0, 4.0 completed.

Provide marked up copy of BwOP DG-11, rev 30, with steps F.1, F.4, F.7

and F.8 place-kept and unit and train designators filled in.

Provide copy of BwOP DG-11T, rev 6, with 1A DG start data completed SIM-608 6 (Final)

SIM-801 1 TASK TITLE:

Respond to RCP Thermal Barrier Leak with CC Valve Failure JPM No.: SIM-801 REV: NRC2006301TPO No.: 4D.OA-51 K&A No.: 008000A3.03 TASK No.: R-OA-061, Respond to a loss of CC K&A IMP: 3.0/3.1 to RCP oil/thermal barrier coolers TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 7, 8 APPROX COMPLETION TIME 10 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. 1BwOA PRI-6, Rev. 101, Component Cooling Malfunction
2. BwAR 1-7-E4, Rev. 51E2, RCP THERM BARR CC WTR FLOW HIGH LOW MATERIALS:
1. Copy of BwAR 1-7-E4, Rev. 51E2 TASK STANDARDS:
1. Determine 1B RCP Thermal Barrier is leaking.
2. Isolate RCP thermal barrier leakage by closing 1CC9438 prior to overfilling CC surge tank.
3. Isolate 1B RCP thermal barrier and restore CC cooling to unaffected RCP

thermal barriers.

TASK CONDITIONS:

1. You are the Assist NSO.
2. Unit 1 is at 100% power.
3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.

INITIATING CUES:

1. Perform actions in response to annunciator 1-7-E4.
2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.

SIM-801 2 RECORD START TIME Examiners note: Examinee may take the control switch for 1CC685 to CLOSE at any time (see JPM step 6), when it is noted that the valve did not automatically close on high

flow. Examiners note: Examinee may refer to BwAR 1-7-E4 which directs responses per 1BwOA

Pri-6 (below) and 1BwOA PRI-1. If examinee notes reference to 1BWOA PRI-1, provide CUE:

Another Operator will initiate actions of 1BwOA-PRI-1, you are to perform actions of

1BwOA PRI-6.

Examiners note: RCP thermal barrier leakage will cause a high alarm on 1PR09J, Unit 1

CC Heat Exchanger Radiation Monitor and cause automatic closure of 1CC017, CC Surge Tank

Vent Valve. If examinee begins to address the 1PR09J alarm, provide CUE: Another

Operator will initiate actions in response to 1PR09J alarm.

Examiners note: RCP thermal barrier leakage will cause annunciator 1-9-D3, CHG LINE

FLOW HIGH/LOW. If examinee begins to address annunciator, provide CUE: Another Operator

will perform actions in response to annunciator 1-9-D3.

PERFORMANCE STEP STANDARD Circle applicable

1. Refer to BwAR 1-7-E4 CUE: When examinee locates correct procedure, provide copy.

Locate and open 1BwAR 1-

7-E4 o Refer to SER o Determine RCP thermal

barrier CC water flow

high in alarm SAT UNSAT N/A Comments: 2 Refer to 1BwOA PRI-6, Component Cooling

Malfunction Note: Examinee will use simulator copy of

1BwOA PRI-6 for JPM

performance. CUE: Acknowledge request for emergency plan

evaluation.

Locate and open 1BwOA

PRI-6 Notify Shift Manager

to evaluate for

Emergency Plan

conditions SAT UNSAT N/A Comments: 3. Check surge tank level > 13%

and increasing Perform the following at

1PM06J: Check CC Surge tank

level: 1LIT-670/676 Determine CC surge

tank level > 13% Determine CC Surge

tank level is rising Go to 1BwOA PRI-6, Attachment B, step 1 Determine CC Surge

tank level is rising Go to 1BwOA PRI-6, Attachment B, Step 5 SAT UNSAT N/A Comments:

SIM-801 3 PERFORMANCE STEP STANDARD Circle applicable

4. Check for leakage from RCP Thermal Barrier Perform the following at 1PM05J/1PM06J: Check for leakage from

RCP Thermal Barrier:

o Annunciator 1-7-E4

LIT Determine

annunciator 1 E4 LIT OR o S eal Injection Flows any abnormally high Determine 1B RCP

has abnormally

high seal flows SAT UNSAT N/A Comments: 5. Check seal injection flow between 8 and 13 gpm per

pump Perform the following at

1PM05J: Determine 1B RCP seal

injection flow > 13

gpm Adjust 1CV121 AND

1CV182 to obtain

between 8 and 13 gpm

seal injection flow

per RCP (as possible)

SAT UNSAT N/A Comments: 6. Check 1CC685 Closed Perform the following at

1PM06J: Check 1CC685 Closed Determine 1CC685 is

OPEN Place control switch

for 1CC685 to CLOSE SAT UNSAT N/A Comments:

SIM-801 4 PERFORMANCE STEP STANDARD Circle applicable Note: Alternate path begins here

  • 7. Isolate RCP thermal barrier leakage CUE: As US, acknowledge failure of 1CC685 to close. Perform the following at

1PM06J: Determine 1CC685 did

not close Manually close 1CC9438

  • 8. Restore CC to unaffected RCPs by locally closing RCP

Thermal Barrier CC outlet

valve to isolate affected

RCP CUE: SM desires affected RCP to be isolated. Note: Inform examinee time compression will be

used and provide the

following cue: CUE: As NLO, report 1CC9496B closed.

Perform the following:

Determine 1B RCP is

affected RCP Determine 1CC9569B

closure required Dispatch operator to

enter Unit 1

Containment to locally

close 1CC9496B After 1CC9496B closed, reopen 1CC9438 SAT UNSAT N/A Comments: 9. Check CC surge tank status CUE: As NLO, acknowledge request to restore CC

surge tank level.

Perform the following: Check CC surge tank

level between 50% and

65% o Dispatch NLO to

restore CC surge tank

level between 50% and

65% in necessary SAT UNSAT N/A Comments: 10. Refer to Tech Specs CUE: As US, acknowledge T.S. 3.6.3 entry for

1CC685. Refer to Tech Specs Determine Tech Spec

3.6.3 applies

for

1CC685. SAT UNSAT N/A Comments: 11. Return to procedure and step in effect CUE: Acknowledge report Perform the following:

o Inform US 1BwOA PRI-6

actions complete SAT UNSAT N/A Comments: CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

SIM-801 5 TASK CONDITIONS:

1. You are the Assist NSO.
2. Unit 1 is at 100% power.
3. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.

INITIATING CUES:

1. Perform actions in response to annunciator 1-7-E4.
2. Inform the Unit Supervisor when you have completed actions in response to annunciator 1-7-E4.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 21, 100% power, steady state, equilibrium xenon.

Complete items on Simulator Ready for Training Checklist Place simulator in RUN.

Run caep SIM-801 from disk and verify the following actuate:

IMF CC09 231 IMF CC07B 20 IOR ZDI1CC685 OPEN TRGSET 1 "ZDI1CC9438(1) == 1" TRG 1 "DMF CC09" Verify 1BwOA PRI-6 place keeping marks are removed.

To close 1CC9496B, perform the following:

Insert IRF CC45 0 To drain CC surge tank, perform the following:

Insert IRF CC15 100 (modify RF to 0 when desired level attained)

Insert IRF CC16 100 (modify RF to 0 when desired level attained)

If running the JPM repetitively, perform the following:

MRF CC45 50 Reset trigger 1 Restore RCP seal injection to normal band Restore CC surge tank level to normal band IMF CC09 231 COMMENTS:

Provide copy of BwAR 1-7-E4, rev 51E2 SIM-801 6 (Final)

SIM-901 1 TASK TITLE:

Perform Waste Gas Release Channel Checks JPM No.: SIM-901 REV: NRC2006301TPO No.: 4C.GW-01 K&A No.: 071000A4.25 TASK No.: R-GW-001, Perform gaseous release K&A IMP: 3.2/3.2 TRAINEE:

SRO EVALUATOR:

DATE: The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

JPM TIME: MINUTES CRITICAL ELEMENTS:

(*) 5, 9 APPROX COMPLETION TIME:

30 MINUTES CRITICAL TIME:

NA EVALUATION METHOD:

LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form MATERIALS:
1. BwOP GW-500T1, Rev. 26, Gas Decay Tank Release Form completed through step D.17. TASK STANDARDS:
1. Perform Gas Decay Tank pre-release channel checks in accordance with BwOP GW-

500T1. 2. Operate the RM-11 for setpoint adjustment/testing.

TASK CONDITIONS:

1. You are an extra NSO.
2. Both Units are at full power.
3. 0PR02J, Gas Decay Tank Monitor, is operable.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay

Tank release package, completed through section D.17, and has directed you to

complete steps D.18 through D.21. (Cue: Hand examinee copy of procedure).

All previous sections of the release package have been successfully completed.

2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.

SIM-901 2 RECORD START TIME PERFORMANCE STEP STANDARD Circle applicable

1. Review BwOP GW-500T1 Review BwOP GW-500T1 SAT UNSAT N/A Comments: 2. Select the High Alarm setpoint for 0PA202. (steps D.18 - 19.a)

Perform the following: PLACE the RM-11 console in the SUPERVISOR mode o DEPRESS Grid 3 key KEY in 0202 DEPRESS the SEL key o VERIFY 0PA202 selected DEPRESS CHAN ITEM key KEY in 9 DEPRESS the SEL key SAT UNSAT N/A Comments: Examiners note: The following procedure step is not required to be performed if 0PA202

is NOT in HIGH ALARM.

3. Verify/enter High Alarm setpoint for 0PA202

suggested by Health Physics

is section C.3.c. (step D.19.b) Note: If examinee requests independent

verification of

steps, provide the

following cue. CUE: Verification has been provided.

Perform the following:

o Refer to step C.3.c o VERIFY/ENTER the new

High Alarm setpoint

from step C.3.c

(6.06E-03) o DEPRESS the ENTER key o VERIFY the new ALERT

alarm setpoint is

displayed o OBTAIN VERIFICATION SAT UNSAT N/A Comments:

SIM-901 3 PERFORMANCE STEP STANDARD Circle applicable

4. Select and enter the Alert Alarm setpoint for 0PA202. (step D.19.c)

CUE: Verification has been provided. Perform the following:

o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key KEY in 10 DEPRESS the SEL key o Refer to step C.3.c o VERIFY/ENTER the new Alert Alarm setpoint

3.03E-03 o DEPRESS the ENTER key VERIFY the new ALERT

alarm setpoint is

displayed o OBTAIN VERIFICATION SAT UNSAT N/A Comments:

SIM-901 4 PERFORMANCE STEP STANDARD Circle applicable

  • 5. Perform the following to verify 0RE-PR002B will cause 0GW014 to automatically

close. (steps D.19.d-q) CUE: As local operator report 0GW014 C/S is

in open CUE: As local operator report 0GW014

controller is at

100%. 0PA202 current activity

setting________

0PA202 new Hi Alarm setting_________

CUE: As local operator report 0GW014 Auto

Closed CUE: As local operator report 0GW014 control

switch is in closed CUE: As local operator report 0GW014

controller is at 0%.

CUE: Verification has been provided.

Perform the following: Contact the local

operator to: Verify/Place 0GW014

C/S in OPEN Place 0GW014

controller to 100%

open o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9 o Record the current

activity reading ENTER a new HIGH alarm

setpoint below the

current activity value o RECORD the new HIGH

alarm setpoint that

was entered DEPRESS the ENTER key o ACKNOWLEDGE the alarm

at the RM-11 console o Contact the local

operator to:

o VERIFY 0GW014 AUTO

CLOSED o PLACE 0GW014

control switch in

CLOSED o PLACE 0GW014

controller at 0%

demand o DEPRESS Grid 3 key o KEY in 0202 o DEPRESS the SEL key o VERIFY 0PA202 selected o DEPRESS CHAN ITEM key o KEY in 9 ENTER the HIGH alarm

setpoint determined in

step C.3.c (6.06 E-03) o OBTAIN VERIFICATION SAT UNSAT N/A Comments:

SIM-901 5 PERFORMANCE STEP STANDARD Circle applicable

6. Select the High Alarm setpoint for 0PA202. (step D.20.a)

Perform the following:

o DEPRESS Grid 3 key KEY in 0102 DEPRESS the SEL key o VERIFY 0PB102 selected DEPRESS CHAN ITEM key KEY in 9 DEPRESS the SEL key SAT UNSAT N/A Comments: Examiners note: The following procedure step is not required to be performed if 0PA202 is NOT in HIGH ALARM.

7. Verify/enter High Alarm setpoint for 0PB102

suggested by Health Physics

is section C.3.c. (step D.20.b)

CUE: Verification has been provided.

Perform the following:

o Refer to step C.3.c o VERIFY/ENTER the new

High Alarm setpoint

from step C.3.c

(6.06E-04) o DEPRESS the ENTER key o VERIFY the new ALERT

alarm setpoint is

displayed o OBTAIN VERIFICATION SAT UNSAT N/A Comments: 8. Select and enter the Alert Alarm setpoint for 0PB102. (step D.20.c)

CUE: Verification has been provided. Perform the following:

o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key KEY in 10 DEPRESS the SEL key o Refer to step C.3.c VERIFY/ENTER the new

Alert Alarm setpoint

(6.06E-05) o DEPRESS the ENTER key o VERIFY the new ALERT

alarm setpoint is

displayed o OBTAIN VERIFICATION SAT UNSAT N/A Comments:

SIM-901 6 PERFORMANCE STEP STANDARD Circle applicable

  • 9. Perform the following to verify 0RE-PR002A will cause 0GW014 to automatically

close. (steps D.20.d-q) CUE: As local operator report 0GW014 C/S is

in open CUE: As local operator report 0GW014

controller is at

100%. 0PB102 current activity

setting________

0PB102 new Hi Alarm setting_________

CUE: As local operator report 0GW014 Auto

Closed CUE: As local operator report 0GW014 control

switch is in closed CUE: As local operator report 0GW014

controller is at 0%.

CUE: Verification has been provided.

Perform the following: Contact the local

operator to: Verify/Place 0GW014

C/S in OPEN Place 0GW014

controller to 100%

open o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key KEY in 9 o Record the current

activity reading ENTER a new HIGH alarm

setpoint below the

current activity value o RECORD the new HIGH

alarm setpoint that

was entered DEPRESS the ENTER key o ACKNOWLEDGE the alarm

at the RM-11 console o Contact the local

operator to:

o VERIFY 0GW014 AUTO

CLOSED o PLACE 0GW014

control switch in

CLOSED o PLACE 0GW014

controller at 0%

demand o DEPRESS Grid 3 key o KEY in 0102 o DEPRESS the SEL key o VERIFY 0PB102 selected o DEPRESS CHAN ITEM key o KEY in 9 ENTER the HIGH alarm

setpoint determined in

step C.3.c (6.06 E-04) o OBTAIN VERIFICATION SAT UNSAT N/A Comments:

SIM-901 7 PERFORMANCE STEP STANDARD Circle applicable

10. Place RM-11 in NORMAL MODE PLACE the RM-11 console in the NORMAL

mode SAT UNSAT N/A Comments: 11. Inform US pre-release channel checks complete CUE: Acknowledge report.

Inform US steps D.18

through D.21 are

completed CUE: THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

SIM-901 8 TASK CONDITIONS:

1. You are an extra NSO.
2. Both Units are at full power.
3. 0PR02J, Gas Decay Tank Monitor, is operable.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform a portion of the 0F Gas Decay Tank release package, completed through section D.17, and has directed you to complete

steps D.18 through D.21. All previous sections of the release package have been

successfully completed.

2. Inform the Unit Supervisor when you have completed steps D.18 through D.21.

SIMULATOR SETUP GUIDE:

Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.

Establish the conditions of IC 21, 100% power, steady state, equilibrium

xenon. Complete items on Simulator Ready for Training Checklist.

Place simulator in RUN.

Adjust 0PR02J radiation level as follows:

Record as found values of monitored item RMK0PR02ABKD

______________.

Set monitor item RMK0PR02ABKD = 1.31 E-8 Record as found values of monitored item RMK0PR02BBKD

______________.

Set monitor item RMK0PR02BBKD = 1.31 E-8 Adjust 0PR02J setpoints as follows.

Record 0PA102 High Alarm current setpoint ___________________.

Set 0PA102 High Alarm Setpoint =

6.06 E-04 (channel item #9).

Record 0PB102 Alert Alarm current setpoint ___________________.

Set 0PA102 Alert Alarm Setpoint =

6.06 E-05 (channel item #10).

Record 0PA202 High Alarm current setpoint ___________________.

Set 0PA202 High Alarm Setpoint =

6.06 E-03 (channel item #9).

Record 0PA202 Alert Alarm current setpoint ___________________.

Set 0PA202 Alert Alarm Setpoint =

3.03 E-03 (channel item #10).

Select grid on the RM-11 console AT CONCLUSION OF JPM(S), RESTORE 0PR02J MONITORED ITEMS ALARM SETPOINTS TO ORIGINAL AS FOUND VALUES COMMENTS:

Provide copy of BwOP GW-500T1, Rev. 26 (Final) SIM-901 9