Extension of Commitment to Complete Follow-Up Actions for Generic Letter 2003-01: Control Room Habitability (TAC No. MB9796)
ML070040187
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/27/2006
From: Bezilla M B
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-03-001, TAC MB9796
Download: ML070040187 (2)


Text

FENOC_F5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President

-Nuclear Fax: 419-321-7582 Docket No. 50-346 License Number NPF-3 Serial Number 3303 December 27, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Extension of Commitment to Complete Follow-Up Actions for Generic Letter 2003-01: "Control Room Habitability" (TAC No. MB9796)Ladies and Gentlemen:

By letter dated March 31, 2006, (Serial Number 3240), the FirstEnergy Nuclear Operating Company (FENOC) submitted a final response to NRC Generic Letter 2003-01 for the Davis-Besse Nuclear Power Station (DBNPS). In its response, FENOC committed to revise Calculations and Licensing Bases Analyses as necessary by December 31, 2006. In order to provide additional time necessary to formalize calculations and prepare associated change documentation, FENOC is revising the completion date for this commitment to May 1, 2007.As described in previously submitted final response to GL 2003-01 for DBNPS, preliminary assessments concluded that the Control Room Habitability Systems continue to meet the applicable regulatory requirements.

The affected commitment and revised due date are identified in Attachment 1.If there are any questions or if additional information is required, please contact Mr. Henry L. Hegrat, Supervisor

-FENOC Fleet Licensing, at (330) 315-6944.Very truly yours, TSC Attachment 1 cc: Regional Administrator, NRC Region III NRC/NRR Project Manager NRC Senior Resident Inspector Utility Radiological Safety Board Docket Number 50-346 License Number NPF-3 Serial Number 3303 Attachment 1 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document.

Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments.

If there are any questions or if additional information is required, please contact Mr. Henry L. Hegrat, Supervisor

-FENOC Fleet Licensing, at (330) 315-6944.COMMITMENT DUE DATE As described in previously submitted May 1, 2007 Attachment 1 to FENOC letter Serial Number 3240 (TAC No. MB 9796)Calculations and Licensing Bases Analyses will be revised as necessary.