ML070820405

From kanterella
Revision as of 12:21, 24 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Pilgrim, Final - Section B Operating Exam (Folder 3)
ML070820405
Person / Time
Site: Pilgrim
Issue date: 02/20/2007
From:
NRC Region 1
To:
Entergy Nuclear Operations
Sykes, Marvin D.
Shared Package
ML060800104 List:
References
Download: ML070820405 (101)


Text

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

PI LGRl M .. --- Task No.: Task Title: Ooeration Of RClC To Inject To The JPM No.: 2007 NRC JPM - RPV RO/SRO S-2 WA

Reference:

A2.01 3.8 13.7 A3.01 3.5 13.5 Examinee:

NRC Examiner: Facility Evaluator: Date:

Method of testing: Simulated Performance: Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

., Initial Conditions: The reactor is operating at 50% CTP and RClC is being returned to service after a system outage to repair instrumentation controls.

PWT requires you to inject with RClC at 400 gpm IAW 2.2.22.5.

ATT 1. --- Task Standard:

RClC will inject into the vessel with the controller in automatic. The procedure should be followed with no failure of critical elements. Required Materials:

NONE General

References:

PNPS 5.3.35.1, Revision 1 PNPS 2.2.22.5, Revision 12 Initiating Cue: Inject with RClC IAW PNPS 2.2.22.5, Att.

1, maintain reactor level +20 to +40. Another operator will monitor the 905 panel. CUE - IF asked injection to vessel is required due to some other work on the check valve 1301 CK -50 was performed when RClC was out of service. RE has been advised that this may affect power and has approved the test. Time Critical Task: NO .. Validation Time: 8 minutes k---- 2007 NRC JPM RO/SRO S-2 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-1 Worksheet i/ SIMULATOR SETUP 1. Initialize simulator to a 50% power IC. 2. Insert the following remote malfunctions:

a. TAB21361 on page gc0652
b. TAB21362 on page gc0652 c. TAB21361 delete when A904-AI-S14-3
d. TAB21362 delete when A904-Al_S85-3
e. H-A904-Al-DSI 46-1 f. H-A904-A1 -DS280-1
g. H-A904-Al-DS146-1 delete when A904-AI-S14-3
h. H-A904-AI-DS280-1 delete when A904-AI-S85-3
3. Pend the following malfunctions:
a. W80712to 1 b. lVV80711 to 1 with a 3 sec delay tied to (a) c. TVV80712 delete
d. lVV8071 I delete tied to (c) This setup will be for JPM S3 also. 2007 NRC JPM RO/SRO S-2 NUREG 1021, Revision 9

Appendix C Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-1 ~~ ~ ~ L.--, (Denote Critical Steps with a check mark) START TIME: RClC Injection - Manual Push Button Checklist (Reference PNPS 2.2.22.5 Attachment

1) Do not operate RCIC System at less than I00 GPM. Momentarily Depress the RClC System Injection Mode push button. Operator depresses the RClC System Injection pushbutton.

Caution: 1, Performance Step: I Standard:

Comment: Performance Step: 2 Verify the MANUAL START SEQUENCE indicating light is ILLUMINATED.

-: Standard: Operator verifies that light is illuminated.

Comment: 1, Performance Step: 3 Verify the following automatic actions occur:

0 MO-1301-61, TURBINE SUPPLY VLV, has OPENED. Standard: Operator determines MO-1401-61 did NOT OPEN.

Places control switch to OPEN. Final configuration is FULL OPEN with RED light ON, GREEN light OFF. Evaluator's Cue: Comment: As CRS, "Continue to take actions as required to inject with RCIC. A WRT will be written to address the valve issue." 2007 NRC JPM RO/SRO S-2 NUREG 1021, Revision 9

Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 -v' Performance Step: 4 MO-1301-49, INJ VLV #2, has OPENED.

Standard: Operator verifies MO-1301-49 by observing valve opening.

Final configuration is full open with RED light ON, GREEN light OFF.

Comment: Performance Step: 5 MO-1301-60, PUMP MIN FLOW VLV, CLOSES when pump discharge flow is greater than or equal to 1 OOGPM. Standard: Operator verifies MO-1301-60 by observing valve closing. Final configuration is full closed with RED light OFF, GREEN light ON. Evaluator's Note: Comment: Valve will initially OPEN and then go CLOSED after sufficient flow has developed.

k.4' Performance Step:

6 AO-1301-34 and AO-1301-35, STEAM LINE DRN VLVs, CLOSE. AO-1301-12 and AO-1301-13, BAROMETRIC CONDR DRN VLVs, CLOSE.

0 Standard: Operator verifies drain valve position by observing the RED indicting lights being OFF and the GREEN indicating lights being ON. Comment: 2007 NRC JPM ROlSRO S-2 NUREG 1021, Revision 9 Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION -e Performance Step: 7 0 MO-1301-62, COOLING WTR SUPPLY VLV, OPENS. P-222, VACUUM PUMP, STARTS. Standard:

Comment: Evaluator Note: Operator determines MO-1301-62 valve did NOT OPEN.

Places control switches to OPEN. Final configuration is MO-1301-62 OPEN and vacuum pump running as verified by observing the RED indicting lights being ON and the GREEN indicating lights being OFF. If the candidate does not follow through with the actions to verify the MO-1301-62 is open, the IF operator will trigger pending steps 2 minutes from the time the MO-1301-61 is opened. Performance Step: 7A IF valve has not been already opened then operator responds to alarm 904L -F1 and GI. Comment: 4 Standard:

2007 NRC JPM RO/SRO S-2 Operator determines MO-1301-62 valve did NOT OPEN. Places control switches to OPEN. Final configuration is MO-1301-62 OPEN and vacuum pump running as verified by observing the RED indicting lights being ON and the GREEN indicating lights being OFF. CUE - Dummy in alarm after 2 minutes if no action has been taken by the operator. NUREG 1021, Revision 9 Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION

    • 4 Performance Step: 8 RClC flow levels OFF and stays at 400 GPM, indicating that FIC-1340-1, INJECTING FLOW CONTROL, has control of turbine speed. Operator determines that system is coming up to rated flow. Standard:

Evaluator's Note: Comment: 'LJ' Terminating Cue: This JPM is complete.

TIME CRITICAL STOP TIME:

STOP TIME: 2007 NRC JPM RO/SRO S-2 NUREG 1021, Revision 9 Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Form ES-C-I Job Performance Measure No.: 2007 NRC JPM RO/SRO S-2 Examinee's Name: Date Petformed: Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

~4' Response:

Result: SAT UNSAT Examiner's Signature: Date:

2007 NRC JPM RO/SRO S-2 NUREG 1021, Revision 9 Appendix C Page 8 of 8 JPM CUE SHEET Form ES-C-1 **i/ INITIAL CONDITIONS: The reactor is operating at 50% CTP and RClC is being returned to service after a system outage to repair instrumentation controls.

PWT requires you to inject with RClC at 400 gpm IAW 2.2.22.5.

ATT 1. INITIATING CUE: 2007 NRC JPM RO/SRO S-2 Inject with RClC IAW PNPS 2.2.22.5, Att. 1, maintain reactor level +20 to +40. Another operator will monitor the 905 panel. NUREG 1021, Revision 9

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: PILGRIM W Task No.: 262-001-04-01 Task Title: Transfer Bus A5 to the UAT From JPM No.: 2007 NRC JPM the Diesel Generator RO/SRO S3 WA

Reference:

A4.04 3.7 13.7 Examinee: Facility Evaluator:

Method of testinq: NRC Examiner:

Date: Simulated Performance: Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Ll Initial Conditions: A degraded grid voltage condition requiring placing A5 and A6 on their associated diesels 20 minutes ago. The condition has since been cleared and A6 has been returned to the UAT. The 'B' EDG has been secured. Task Standard:

Bus A5 is being carried by the UAT with the :'A' EDG output breaker open. The transfer shall be accomplished in accordance with all applicable system precautions and limitations. The procedure shall be followed without failure of any critical elements.

Required Materials:

Syncro Switch Control Handle Key for "A EDG "NORMALTTEST" keylock switch on C3. General

References:

2.4.144, Revision 37 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: You are to return bus A5 to the unit auxiliary transformer in accordance with Attachment 1, step 8 of procedure 2.4.144. Inform me when you have completed this task. 'ij Grid Voltage is stable.

IS0 New England can ensure that 342 will be available at the SUT following a PNPS trip. The reactor shutdown has been terminated. Time Critical Task: NO Validation Time: IO minutes SIMULATOR SETUP 0 Reset the simulator to 50% CTP with the 4160V buses on the UAT. >L.l 0 Start and parallel the "A EDG to A5 and open the UAT feeder to A5. Return the DG test switch to "NORMAL" and the Governor Mode Selector to "ISOCHRONOUS". Acknowledge alarms.

0 Place the A5 auto xfer selector switch to "OFF". Turn off the "A' EDG sync switch. 0 Remove the sync switch from the panel and place it in the horizontal section of C3. 0 Depress the Scoop tube lock-up pushbuttons for both Recircs.

This setup will be used in conjunction with JPM S2 setup. 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 3 of 10 Form ES-C-1 PERFORMANCE INFORMATION

-~ '-4 (Denote Critical Steps with a check mark) START TIME: Performance Step: 1 Evaluator's Note: Evaluator's Note: Evaluator's Note: Review the applicable sections of the procedure. This task is covered in 2.4.144, Attachment I, Step (8). All controls are located on control room panels C3 unless noted. All critical steps must be performed in order written unless otherwise noted. Standard:

Comment: Caution: Operator reviews the applicable section of the procedure. Operator turns to Attachment 1 of 2.4.144 and looks at the procedure.

When transferring the EDG(s) to isochronous mode, changes to the safety bus (A5/A6) frequency may occur and may cause the vital MG set output voltage to change. This output voltage change may cause a step change in recirc scoop tube position.

Performance Step: 2 VERIFY OR MANUALLY INITIATE a Scoop Tube Positioner Lockup on both Recirculation Pump MG Sets A and B. (Refer to PNPS 2.2.84, Attachment 1, step 8.b.) Standard: Operator initiates Scoop Tube Positioner Lockup on Recirculation Pump MG Set A and B using the pushbuttons on Panel C904. Evaluator's Note: Operator verifies lockup on C904 for Recirc MG Sets A and B. They will have been locked up from the transfer of bus A6 back to the UAT. Comment: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 4 of 10 PERFORMANCE INFORMATION Form ES-C-1

..-' Performance Step: 3 TRANSFER the DIESEL GENERATOR "A" test switch to "TEST". 4 Standard: Operator inserts key and rotates "DIESEL GEN "A TEST" switch to the "TEST" position. Evaluator's Note:

Standard:

Operation of test switch requires a key - provide operator with key when requested. DIESEL GEN "A" TEST switch positioned to TEST. Comment: Performance Step: 4 TRANSFER the DIESEL GENERATOR "A GOVERNOR MODE SELECTOR SWITCH to "DROOP". 4 Standard: Operator rotates "DIESEL GEN "A" GOVERNOR MODE SELECTOR SWITCH" to the "DROOP" position.

Standard: Diesel Gen "A" Governor Mode Switch positioned to DROOP. -,' Comment: Performance Step: 5 POSITION the UNIT AUX XFMR TO BUS A5 sycroscope switch to "ON". Standard:

Operator inserts and rotates "UNIT AUX XMFR TO BUS A5" synchroscope switch to the "ON" position.

Standard: The UNIT AUX XFMR TO BUS A5 sycroscope switch is "ON". Comment: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION L.-,-f' Performance Step: 6 ADJUST DIESEL GENERATOR "A VOLTAGE REGULATOR SETPOINT ADJUSTER so that "RUNNING" VOLTAGE potential is the same as "INCOMING" VOLTAGE potential.

Standard: Operator rotates "DIESEL GEN "A VOLTAGE REGULATOR SETPOINT ADJUSTER" to the "RAISE" and/or "LOWER" positions as necessary until "INCOMING VOLTAGE" meter is equal to "RUNING VOLTAGE" meter.

Standard: Running and incoming voltage potentials are matched.

Comment: Performance Step: 7 ADJUST DIESEL GENERATOR "A GOVERNOR SPEED CONTROL so that synchroscope rotation is slow in the fast direction. St and a rd : '--' Standard: Operator rotates "DIESEL GEN "A" GOVERNOR SPEED CONTROL" switch to "RAISE" - or - "LOWER until pointer is rotating slowly in the "FAST direction on "Auxiliary SYSTEM SYNCHCHROSCOPE".

"AUXILIARY SYSTEM SYNCHROSCOPE" is rotating slowly in the "FAST" direction.

Comment: Performance Step: 8 WHEN the synchroscope is at five degrees before twelve o'clock, THEN CLOSE the unit auxiliary transformer to safety bus breaker UNIT AUX XFMR TO BUS A5. Operator rotates "UNIT AUX XFMR TO BUS A5" breaker control switch to the "CLOSE" position when "AUXILIARY SYSTEM SYNCHROSCOPE position is approximately "5" degrees before 12 o'clock. Bkr A505 closes and breaker A509 did not trip open.

d Standard:

Standard:

Comment: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 6 of 10 PERFORMANCE INFORMATION Form ES-C-1 '4 Performance Step: 9 Standard: Position the Unit Aux XFMR to Bus A5 synchroscope switch to OFF. Unit Aux XFMR to Bus A-5 Sync switch in OFF.

Comment: Note: Following EDG operation at low loads (c65OkW) for greater than one hour, the EDG should be run at > 50% (1300kW) for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to securing.

In this case, however, the diesel has been on the bus for only 20minutes as is stated in the initial conditions.

Performance Step: 10 UNLOAD the diesel as follows: Standard:

Standard:

Standard:

Standard:

Standard: .I Standard:

0 LOWER reactive load to 0 kVAR using the voltage regulator setpoint adjuster.

LOWER real load to between 50 and 150kW using the governor speed control. OPEN diesel generator output breaker diesel generator "A' to bus A5. 0 Operator rotates "DIESEL GEN "A VOLTAGE REGULATOR SETPOINT ADJUSTER" to the "RAISE" and/or "LOWER" positions as necessary until reactive load is 0 kVAR. DG "A Voltage Regulator Setpoint Adjuster manipulated to achieve 0 kVAR reactive load. Operator rotates "DIESEL GEN "AGOVERNOR SPEED CONTROL" switch to "LOWER until real load is between 50 and 1 50kW. Operator observes UAT amperage increasing Operator rotates "DIESEL GEN "A' TO BUS A5 breaker control switch to the "TRIP" position.

A509 breaker control switch positioned momentarily to TRIP. Comment: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 7 of 10 Form ES-C-I PERFORMANCE INFORMATION Performance Step:

tl Standard:

Standard: Adjust Diesel Generator output voltage to 4200V using DIESEL GEN "A VOLTAGE REGULATOR SETPOINT ADJUSTER. Operator rotates "DIESEL GEN "A" VOLTAGE REGULATOR SETPOINT ADJUSTER to the "RAISE" and/or "LOWER positions as necessary until output voltage is 4200V. Operator adjusts voltage to 4200V. Comment: Performance Step: 12 Standard:

RAISE DG speed to 61 Hz using Diesel Generator "A" governor speed control. Operator rotates "DIESEL GEN "AGOVERNOR SPEED CONTROL to "RAISE and/or "LOWER" positions as necessary until frequency is 61 Hz. Operator adjusts frequency to 61 Hz. Standard:

Comment: Performance Step: 13 TRANSFER DIESEL GEN A GOVERNOR MODE SELECTOR switch to "ISOCH". Standard: Operator rotates "DIESEL GEN "A" GOVERNOR MODE SELECTOR switch to "ISOCH". Standard:

Operator moves the DG "A mode selector switch to "ISOCH".

Comment: Performance Step: 14 Standard:

Standard: TRANSFER the DIESEL GEN "A' TEST switch to "NORM". Operator rotates "DIESEL GEN "A' TEST switch to "NORM". Operator moves the DG "A test switch to "NORM". Comment: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 8 of 10 PERFORMANCE INFORMATION Form ES-C-1 .U' Performance Step: 15 Standard:

Standard:

VERIFY Diesel Generator is running at 60 Hz and approximately 4200V. Operator verifies "DIESEL GEN "A is at 60 Hz and about 4200V. Operator verifies DG "A is at 60 Hz and 4200V. Comment: Performance Step: 16 Standard:

Standard: Operator waits 3 minutes. Allow the Diesel Generator to run for 3 minutes to equalize temperatures.

Operator waits 3 minutes before proceeding. Evaluator's Cue:

Comment: Instructor may cue, "3 minutes elapsed".

"u' Terminating Cue: STOP TIME: This JPM is complete.

TIME CRITICAL STOP TIME: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9

Appendix C Page 9 of 10 Form ES-C-I VERIFICATION OF COMPLETION

'.-' Job Performance Measure No.: 2007 NRC JPM RO/SRO S3 Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

Response:

Result: SAT UNSAT Examiner's Signature:

Date: 2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Page 10 of 10 Form E$-C-1 JPM CUE SHEET ~, .--../' INITIAL CONDITIONS: A degraded grid voltage condition requiring placing A5 and A6 on their associated diesels 20 minutes ago. The condition has since been cleared and A* has been returned to the UAT. The 'B' EDG has been secured. INITIATING CUE: You are to return bus A5 to the unit auxiliary transformer in accordance with Attachment 1, step 8 of procedure 2.4.144. Inform me when you have completed this task. Grid Voltage is stable.

IS0 New England can ensure that 342 will be available at the SUT following a PNPS trip. The reactor shutdown has been terminated.

2007 NRC JPM RO/SRO S3 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

PILGRIM Task No.: 206-04-01-002

.'4 Task Title: Operation Of HPCl For Pressure JPM No.: 2007 NRC JPM Control RO/SRO S4 WA

Reference:

A2.14 3.3 / 3.4 Examinee:

NRC Examiner:

Facility Evaluator:

Date: Method of testinq: Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Lc' Initial Conditions: The reactor has scrammed due to a Loss of Offsite Power. EOP-1 is being used to control RPV parameters.

Task Standard:

HPCl operating in pressure control the vessel with the controller in manual. The procedure should be followed with no failure of critical elements.

Required Materials: NONE General

References:

PNPS 2.2.21.5, Revision 13 Initiating Cue: Place HPCl in service for pressure control using PNPS 2.2.21 5, Attachment

2. Time Critical Task: NO Validation Time:

5 minutes 2007 NRC JPM RO/SRO S4 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-1 Worksheet v SIMULATOR SETUP 1. Initialize simulator to a full power IC. 2. Insert the following malfunctions:

a. ED06 - Loss of SUT and SDT b. TFP87403 - Spurious trip of ACB 104&105 3. Depress the RClC initiation pushbutton
4. Insert HP HPCl controller fails low. 5. Acknowledge all alarms. 2007 NRC JPM RO/SRO S4 NUREG 1021, Revision 9 Appendix C Verify Flow Controller FIC-2340-1, injection Flow Control, is in AUTO and set for 4250 gpm. Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 ii (Denofe Crifical Steps with a check mark) START TIME: Performance Step: 1 Standard:

Comment: Performance Step: 2 Standard:

L" Comment: Performance Step: 3 d Standard:

Comment: Performance Step: 4 d Standard:

Comment: u 2007 NRC JPM RO/SRO S4 I i Start P-223, Gland Seal Condenser Blower. Operator places control switch for P-223 to start and verifies , Gland Seal Condenser Blower is RUNNING by observing the: RED indicating light LIT. I ! I I OPEN MO-2301-15, HPCI/RCIC Test return Valve. i Operator places MO-2301-15 control switch to OPEN. Verifies RED light ON, GREEN light OFF. ! JOG OPEN MO-2301-10, HPCl full flow test valve, for 7 seconds. Operator holds MO-2301-10 control switch to OPEN for sevdn seconds. Verifies RED light and GREEN light ON. I NUREG 1021, Revision 9 Appendix C Page 4 of 7 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 5 Perform the following steps in close sequence:

.( Standard:

0 0 0 OPEN MO-2301-3, Turbine Supply Valve. As MO-2301-3 begins its stroke, start P229, Aux Oil Pump. Operator places MO-2301-3 control switch to OPEN. When MO-2301-3 RED light comes ON, operator immediately places P-229 control switch to START. Comment: Performance Step: 6 Observe that flow increase and stabilizes at 4250 GPM. Operator observes that HPCl flow stabilizes at - 1000 gpm. 4 Standard:

Evaluator's Cue: (as required)

Take action to place HPCl in pressure control maximizing energy removed from the reactor pressure vessel. Comment: Performance Step: 7 Standard: Place the selector switch to the "BAL" position. Controller selector switch placed in Balance position.

Evaluator's Note: This step and the following steps were extracted from section 2.0 of attachment 2 that addresses manual operation of the controller.

This procedure is based on a controlled shift to manual. As a result this step may not be performed.

Comment: 2007 NRC JPM RO/SRO S4 NUREG 1021, Revision 9 Appendix C Page 5 of 7 PERFORMANCE INFORMATION Form ES-C-I Performance Step: 8 Standard: Adjust the potentiometer until the deviation is removed (needle in green band). Operator adjusts the potentiometer until the deviation is in the green band on the controller.

Evaluator's Note: This step was extracted from section 2 of attachment 2 that addresses manual operation of the controller.

This procedure is based on a controlled shift to manual. As a result this step may not be performed.

Comment: Performance Step: 9 Place the selector switch to the "MAN" position.

4 Standard: Controller selector switch placed in MANUAL position.

Comment: Performance Step: 10 Use potentiometer to control turbine speed to obtain desired flow rate. 4 Standard: Operator maintains HPCl Turbine parameters.

Turbine speed >I 000 rpm Turbine speed < trip overspeed setpoint 5000 rpm RestoredMaintain Pressure in desired band - 900 to 1050 psig. Comment: Terminating Cue: STOP TIME: iJ This JPM is complete.

TIME CRITICAL STOP TIME: 2007 NRC JPM RO/SRO S4 NUREG 1021, Revision 9 Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2007 NRC JPM RO/SRO S4 i/ Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

'ij Response:

Result: SAT UNSAT Examiner's Signature:

Date: 2007 NRC JPM RO/SRO S4 NUREG 1021, Revision 9 Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:

The reactor has scrammed due to a Loss of Offsite Power. EOP-1 is being used to control RPV parameters.

i_/ INITIATING CUE:

'e' 2007 NRC JPM RO/SRO S4 Place HPCl in service for pressure control using PNPS 2.2.21 5, Attachment

2. NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: PILGRIM

'4' Task No.: 200-05-01-021 Task Title: Recover RBCCW Loop "B" With an JPM No.: 2007 NRC JPM Elevated Dwell Temperature RO/SRO S5 WA

Reference:

AA1.02 3.8 13.8 Examinee: NRC Examiner:

Facility Evaluator:

Date: Method of testinu:

Si m u I a t ed Perform an ce : Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

LJ' Initial Conditions:

A loss of B14 has occurred resulting in a loss of "B" loop RBCCW pumps. RBCCW could not be cross-tied due to the inability to open a cross connect valve.

0 0 The reactor was scrammed.

0 0 0 EOP-03 has been entered on high drywell temperature.

The fault on 8-14 has been cleared. "B" Loop RBCCW pumps are in PTL in preparation for restoring B14 IAW 2.4.42. Drywell temperature has exceeded 250 degrees. Task Standard:

The RBCCW Loop "B" will be restored without causing condensation-induced water hammer due to elevated drywell temperature.

When indication of a break in the drywell occur, RBCCW Loop "B" will be isolated. Procedure 2.4.42 shall be carried out without failure of any critical elements. Required Materials: NONE General

References:

PNPS 2.4.42, Revision 27 2007 NRC JPM ROISRO S5 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 B14 has been re-energized.

Restore RBCCW Loop "B" IAW PNPS 2.4.42. 'W' Initiating Cue: Time Critical Task: NO Validation Time:

20 minutes 2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-1 Worksheet ij 1. 2. 3. 4. 5. 6. 7. 8. 9. SIMULATOR SETUP Initialize to 100% power IC. Insert a loss of 6-14 (power supply to "6" Loop RBCCW pumps). Place all Loop "B RBCCW Pumps in PTL. Wait for Rx scram. Re-energize 8-14. Stabilize RPV Pressure and Level. Allow Drywell Temperature to rise to greater than 250 degrees. Remove Caution Tags from Drywell Cooler Potentiometers. Insert the following malfunctions: a. KG32 @ 0 - page gc0552 - surge tank make-up closed b. CW15 @loo% - p. gc0552 - RBCCW leak in drywell when MO-4009NB CIS to open (AI-Al-S35-3 or AI-Al-S50-3) 2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 4 of 1 I Form ES-C-1 PERFORMANCE INFORMATION

'-d (Denote Critical Steps with a check mark) START TIME: Notes: This task is covered in 2.4.42, Section 4.2. All critical steps must be performed in order written unless otherwise noted. Performance Step: I Recovery of RBCCW Loop "B" with an elevated drywell temperature

[NRC GL96-061.

Caution: If Drywell temperatures exceed 250°F and the RBCCW Loop "B" pumps are not running, it is possible for boiling to occur in the Drywell Coolers that may result in a condensation-induced water hammer when the RBCCW Pumps are started or the loops are cross-tied, unless the RBCCW nonessential block valves are closed first. [NRC-96-06]

0 IF indications of a major LOCA exist, THEN EXECUTE Step 2. IF NO indications of a major LOCA exist, THEN EXECUTE Step 3. 0 Standard:

Operator enters Step 3 of the procedure.

Evaluator's Note: Comment: Initial Conditions described Non-LOCA conditions.

2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 5 of 11 PERFORMANCE INFORMATION Form ES-C-1

'e. Performance Step: 2 IF ALL of the following conditions exist:

Note: 4 Standard:

0 0 0 THEN RECOVER RBCCW Loop "B" as directed in the following steps: "Drywell Temperature" as stated in this section of PNPS 2.4.42 shall be determined by the direction provided according to PNPS 2.1.27, "Drywell Temperature Indication".

This is the same direction given for Drywell temperature CLOSE the following RBCCW Loop "B" Nonessential Isolation Valves at Panel C1: 0 0 NO indications of a major LOCA inside Primary containment; Drywell temperature has been 2 250°F; RBCCW flow has been lost to the Drywell for 2 6 minutes; MO-4009A, RBCCW Loop "6" Nonessential Loop Inlet Valve MO-4009B, RBCCW Loop "Bl' Nonessential Loop Outlet Valve Operator closes MO-4009A & B. Both valves indicate closed as evidenced by RED light OFF and GREEN light ON. L-., Evaluator Note: Comment: Drywell cooler leak is dependent on the MO-4009NB red light OFF and green light ON Caution: The RBCCW loops shall not be cross-tied when the Suppression Pool temperature is 2 130°F and only one loop of containment cooling is operable.

Performance Step: 3 START one "B" RBCCW loop pump OR CROSS-TIE RBCCW loops in accordance with Attachment

5. 4 Standard: Operator starts one RBCCW pump. RED light ON and GREEN light OFF, and pressure increase on PI-4008 Panel C-I. Comment: 2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 6 of 1 I PERFORMANCE INFORMATION Form ES-C-I 'ij Performance Step: 4 IF Maximized Torus Cooling, Torus Spray, Drywell Spray, OR LPCl Injection with Maximized Cooling mode is required, THEN MAXIMIZE RBCCW Cooling in accordance with PNPS 2.2.19.5 Attachment 1 AND ALIGN the RHR System for the required mode in accordance with PNPS 2.2.1 9.5 Attachment 3, 4, 5, OR 6. Standard: Operator questions CRS as to need to align systems for maximized cooling. Eva1 u at or's Cue: The ECCS operator has placed RBCCW and torus cooling in service using loop "A" systems. Continue restoration of "B" loop RBCCW. Comment: Note: Drywell Cooler Motor Operated Supply Valves MO-4038A MO-4039A MO-4040A MO-4038B M 0-40398 MO-4040B MO-4038C MO-4039C MO-4041 A M04038D MO-4039D MO-4041 B MO-4038E MO-4039E MO-4038F MO-4039F Performance Step: 5 At Panel C7, PLACE all Drywell cooler motor operated supply valves (SEE Note directly above) to approximately the 10% OPEN position.

All 16 Motor operated valves are opened to 10%. 4 Standard: MO-4038A MO-4039A MO-4040A - MO-4038B MO-4039B MO-4040B - MO-4038C MO-4039C MO-4041 A - MO-4038D MO-4039D MO-4041 B - MO-4038E MO-4039E MO-4038F MO-4039F Comment: 2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 7 of 11 PERFORMANCE INFORMATION Form ES-C-1 ;sj .( Performance Step: 6 OPEN the following RBCCW Loop "B" Nonessential Isolation Valves at Panel C1: MO-4009AI RBCCW Loop "B" Nonessential Loop Inlet Valve MO-4009B, RBCCW Loop "B" Nonessential Loop Outlet Valve Standard: MO-4009A and B are opened. RED light ON / GREEN light OFF. Evaluator's NOTE: The leak path in the drywell is present when the operator opens the MO-4009A and B. A short time later, the low surge tank level alarm will annunciate (C1 R- C5) Comment: 2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION L'd Performance Step: 7 St and ard : OPEN all Drywell cooler supply MOVs

[SEE Note above Step 51. All 16 motor operated valves are taken to the full open position. MO-4038A MO-4039A MO-4040A __ MO-4038B MO-4039B MO-4040B - MO-4038C MO-4039C MO-404 1 A - MO-4038D MO-4039D MO-4041 B - MO-4038E MO-4039E MO-4038F MO-4039F Evaluator's NOTE: Comment: If RBCCW surge tank alarm comes in while applicant is around back. Inform them that the alarm is in. 2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 9 of 11 Form ES-C-I PERFORMANCE INFORMATION .e .( Performance Step: 8 IF plant conditions indicate a breach in the Drywell RBCCW cooling piping, THEN ISOLATE the RBCCW flow to the Drywell by closing: 0 MO-4009A, RBCCW Loop "B" Nonessential Loop Inlet Valve MO-4009B, RBCCW Loop "B" Nonessential Loop Outlet Valve Standard: Operator determines that there is a break in RBCCW cooling piping in DNV. Operator places control switch for MO-4009A and MO-4009B to close. Checks RED lights OFF, GREEN lights on for both valves. W' Evaluator's Cue: Role play as required the Rx Bldg operator to say when requested, "makeup to the "B" surge tank is full open and the level indicator reads zero percent."

Role play as required to provide indication that RBCCW loop "B" has been breached if operator request information from field. When MO-4009A / 4009B are closed, cue "this concludes the JPM. The operator can make this determination in several ways, including the following: Operator can use steady pressure indication on RBCCW loop "B" and I or RBCCW loop "B" surge tank alarm andlor request field operator to verify steady surge tank level. Evaluator's Cue: Evaluator's Note: Comment: Terminating Cue: STOP TIME: This JPM is complete.

TIME CRITICAL STOP TIME:

2007 NRC JPM RO/SRO S5 NUREG 1021, Revision 9 Appendix C Page 10 of 11 VERIFICATION OF COMPLETION Form ES-C-1 2007 NRC JPM RO/SRO 55 NUREG 1021, Revision 9 Job Performance Measure No.: 2007 NRC JPM RO/SRO S5 Examinee's Name: Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

'4 Response:

Resu I t : SAT UNSAT Examiner's Signature:

Date:

Appendix C Page I1 of I1 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

0 0 0 The reactor was scrammed.

0 0 0 A loss of B14 has occurred resulting in a loss of "6" loop RBCCW pumps. RBCCW could not be cross-tied due to the inability to open a cross connect valve. .-d EOP-03 has been entered on high drywell temperature.

The fault on 6-14 has been cleared.

"B" Loop RBCCW pumps are in PTL in preparation for restoring B14 IAW 2.4.42. Drywell temperature has exceeded 250 degrees. 0 INITIATING CUE: 2007 NRC JPM ROlSRO S5 614 has been re-energized. Restore RBCCW Loop "B" IAW PNPS 2.4.42. NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-I Facility: PILGRIM

'Lf Task No.: 200-05-01-003 Task Title: Reopen MSlVs Followinq an MSlV JPM No.: 2007 NRC JPM Closure RO/SRO S-6 K/A

Reference:

A2.03 4.0 / 4.2 Examinee:

4. NRC Examiner: Facility Evaluator: Date:

Method of testinq: Si m u I a ted Perform an ce: Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

w' 0 0 The plant is operating at 50% The operator is required to reopen the outboard and inboard "D" MSIVs following MSlV closure Task Standard:

MSlVs shall be opened without causing inadvertent actuations and shall be accomplished in accordance with all system precautions and limitations.

2.2.92 shall be followed without failure of any critical elements. Required Materials:

N/A General

References:

Procedure 2.2.92, Revision 51 Initiating Cue: The "D" outboard MSlV inadvertently closed early on the previous shift due to a broken airline which has since been repaired. You are to reopen the outboard and inboard 'ID" MSlVs IAW PNPS 2.2.92 Section 7.2 beginning at step [5] Time Critical Task:

NO ,, L.J 2007 NRC JPM RO/SRO S-6 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-I Validation Time: 10 minutes i.2, 2007 NRC JPM RO/SRO S-6 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 IC: SIMULATOR SETUP Any 50% IC with all MSlVs open 0 Initialize the simulator.

0 Close Main Steam Line D Outboard and Inboard MSIVs. Open MO-220-3 and jog open MO-220-4. This JPM will be performed in conjunction with JPM S-7 2007 NRC JPM RO/SRO S-6 NUREG 1021, Revision 9 Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1

'4 (Denote Critical Steps with an X mark) START TIME: Performance Step: I Operator determines Main Steam line has been drained through M0-220-3 and MO-220-4 for greater than 15 minutes. Eva1 uator's Note: Comment: Initiating cue states the MSlV closed on the previous shift. Performance Step: 2 Operator CLOSES MO-220-4 AND MO-220-3 0 Operator looks at indicating lights for MO-220-3 and 4. d Standard: .u' Operator observes green indicating lights lit and red lights extinguished for MO-220-3, and MO-220-4 on the PClS status board or apron section of C904. Comment: Performance Step: 3 OPEN MO-220-1 AND MO-220-2 4 Standard:

Comment: 0 Operator looks at indicating lights for MO-220- 1 and 2. Operator observes green indicating lights lit and red lights extinguished for MO-220-1, and MO-220-2 on the PClS status board or apron section of C904. 2007 NRC JPM RO/SRO S-6 NUREG 1021, Revision 9 Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 .-' Performance Step: 4 Slowly jog FULLOPEN MO-220-4, Drain MSL for IO minutes. 0 Operator jogs open and verifies MO-220-4 in the OPEN position.

d Standard:

Operator observes RED light LIT and GREEN light EXTINGUISHED for MO-220-4.

Comment: CUE -the main steam line has been draining for IO minutes Performance Step:

5 Open MSL "D" Outboard MSlV d Standard:

AO-203-2D control switch in OPEN. Operator observes GREEN indicating light OFF, RED indicating light LIT.

Comment: Performance Step:

6 Open MO-220-3.

Wait 10 minutes. -G d Standard:

MO-220-3 control switch placed in OPEN. Operator observes GREEN indicating light OFF, RED indicating light LIT.

Comment: CUE - MO-220-3 has been open for 10 minutes Performance Step: 7 Close MO-220-3 d Standard:

Comment: 2007 NRC JPM RO/SRO S-6 MO-220-3 control switch in CLOSE. Operator observes GREEN indicating light LIT, RED indicating light OFF. NUREG 1021, Revision 9

Appendix C Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 8 OPEN MSL I'D" INBOARD MSlV L/ d Standard:

AO-203-1 D control switch placed in OPEN. Operator observes GREEN indicating light OFF, RED indicating light LIT. Comment: Performance Step: 9 CLOSE the following valves - MO-220 MO-220 MO-220-2 Standard:

~U' Comment: Terminating Cue: STOP TIME: MO-220-4, M)-220-2 and MO-220-1 control switches placed in CLOSE. Operator observes GREEN indicating lights LIT, RED indicating lights OFF. This JPM is complete.

TIME CRITICAL STOP TIME:

2007 NRC JPM RO/SRO S-6 NUREG 1021, Revision 9 Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: 2007 NRC JPM RO/SRO S-6 'W' Examinee's Name: Date Performed:

Facility Eva1 uator: Number of Attempts:

Time to Complete: Question Documentation:

Question: .I --- Response:

Result: SAT UNSAT Examiner's Signature:

Date: 2007 NRC JPM RO/SRO S-6 NUREG 7021, Revision 9 Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

0 The plant is operating at 50% 'ID" Inboard and Outboard MSlVs are closed. INITIATING CUE: The "D" outboard MSlV inadvertently closed early on the previous shift due to a broken airline which has since been repaired.

You are to reopen the outboard and inboard "D" MSlVs IAW PNPS 2.2.92 Section 7.2 beginning at step

[5]. 2007 NRC JPM RO/SRO S-6 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: PILGRIM Task No.: 288-01-01-015 Ll Task Title: Resettinq Secondarv Containment JPM No.: 2007 NRC JPM Followinq An Isolation RO/SRO S7 WA

Reference:

A4.03 3.6 13.5 Examinee : NRC Examiner: Facility Evaluator:

Date: Method of testina: Simulated Performance: Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

u Initial Conditions:

Following an isolation that occurred 15 minutes ago due to a planned transfer of Y2, the operator is required to reset the RBIs and to restore the reactor building ventilation system dampers on C-7. Task Standard: The secondary containment isolation signal is reset and the reactor building normal ventilation system is restored to the normal lineup.

The system shall be operated in accordance with all applicable precautions and limitations.

The procedure shall be followed without failure of critical elements. Required Materials:

Reset Keys for RBIs General

References:

PNPS 2.2.125.1.

Revision 16 Initiating Cue: Reset the Group II and Reactor Building isolations and restore secondary containment ventilation to normal IAW PNPS 2.2.1 25.1. Time Critical Task: NO Validation Time: 15 minutes

'c*: 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP 1. Reset simulator to a 50% CTP IC. 2. Insert an RBIs by taking the RBIs TEST LOGlC/TRlP keylocks to standby. 2007 NRC JPM ROlSRO S7 keylocks to ISOLATE. Return the NUREG 1021, Revision 9 Appendix C Page 3 of 15 PERFORMANCE INFORMATION Form ES-C-1 u (Denote Critical Steps with a check mark) START TIME: NOTE: CAUTION: If a Secondary Containment damper gives a dual indication, this is a symptom of a damper stuck in mid-position. When these dampers are in the mid-position, there is both a red (open) light and a green (closed) light illuminated.

Operator action may be necessary to manually close dampers. (PR94,9358.01)

The NRC requires that all safety related equipment receiving a containment isolation signal remain in the safe position when containment isolation logic is reset. If the below listed components are not aligned as required below, the components will reposition when the isolation logic is reset. CUE Performance Step: 1 STEP 1 is performed in the field. When Secondary Containment isolation signal clears, THEN PLACE OR VERIFY that the following control switches are in the safe position as follows: 0 At Panel C61: 0 PLACE OR VERIFY the control switch for VSF-201A in the OFF position.

PLACE OR VERIFY the control switch for VSF-201 B in the OFF position.

PLACE OR VERIFY the control switch for VSF-202A in the OFF position.

PLACE OR VERIFY the control switch for VSF-202B in the OFF position.

PLACE OR VERIFY the control switch for VSF-203A in the OFF position.

PLACE OR VERIFY the control switch for VSF-2036 in the OFF position.

PLACE OR VERIFY the control switch for VEX-201A in the OFF position.

PLACE OR VERIFY the control switch for VEX-201 B in the OFF position.

PLACE OR VERIFY the control switch for VEX-202A in the OFF position.

0 0 0 0 0 0 0 2007 NRC JPM ROlSRO S7 NUREG 1021, Revision 9 Appendix C Page 4 of 15 PERFORMANCE INFORMATION Form ES-C-I W Standard:

0 PLACE OR VERIFY the control switch for VEX-202B in the OFF position.

PLACE OR VERIFY the control switch for VEX-203A in the OFF position.

PLACE OR VERIFY the control switch for VEX-203B in the OFF position.

PLACE OR VERIFY the control switch for VEX-206 in the STOP position.

0 Operator contacts field operator to place reactor building supply and exhaust fans in the off position (VEX-206 placed in stop). Eva1 u ator's Cue: "All reactor building supply and exhaust fans have been placed in OFF with the exception of VEX-206 which is placed in the STOP position."

Comment: .I Performance Step: 2 At Panel C7 PLACE OR VERIFY the control switch for damper AO-N-97 in the CLOSE position. Control switch for AO-N-97 rotated to the CLOSE position.

'v' Standard:

Comment: OP Performance Step: 3 Standard:

PLACE a6 VERIFY the control switch for damper AO-N-96 in the CLOSE position. Control switch for AO-N-96 rotated to the CLOSE position.

Comment: .I Performance Step: 4 PLACE OR VERIFY the control switch for damper AO-N-91 in the CLOSE position. Control switch for AO-N-91 rotated to the CLOSE position.

Standard:

'-/ Comment: 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 5 of 15 Form ES-C-I PERFORMANCE INFORMATION LJ' J Performance Step: 5 PLACE OR VERIFY the control switch for damper AO-N-90 in the CLOSE position. Control switch for AO-N-90 rotated to the CLOSE position.

Standard:

Comment: .I Performance Step: 6 PLACE OR VERIFY the control switch for damper AO-N-93 in the CLOSE position. Control switch for AO-N-93 rotated to the CLOSE position.

Standard:

Comment: J Performance Step: 7 PLACE OR VERIFY the control switch for damper AO-N-92 in the CLOSE position. Control switch for AO-N-92 rotated to the CLOSE position.

Ll Standard:

Comment: J Performance Step: 8 PLACE OR VERIFY the control switch for damper AO-N-94 in the CLOSE position. Control switch for AO-N-94 rotated to the CLOSE position.

Standard:

Comment: 4 Performance Step: 9 PLACE OR VERIFY the control switch for damper AO-N-95 in the CLOSE position. Control switch for AO-N-95 rotated to the CLOSE position.

Standard:

Comment: 'e 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION L./ 4 Performance Step:

IO PLACE OR VERIFY the control switch for damper AO-N-114 in the CLOSE position. Control switch for AO-N-114 rotated to the CLOSE position.

Standard:

Comment: .I Performance Step: I I PLACE OR VERIFY the control switch for damper AO-N-115 in the CLOSE position. Control switch for AO-N-115 rotated to the CLOSE position.

Standard:

Comment: .I Performance Step: 12 PLACE OR VERIFY the control switch for damper AO-N-116 in the CLOSE position. Control switch for AO-N-116 rotated to the CLOSE position.

L/ Standard:

Comment: .I Performance Step: 13 PLACE OR VERIFY the control switch for damper AO-N-117 in the CLOSE position. Control switch for AO-N-I 17 rotated to the CLOSE position.

Standard:

Comment: 4 Performance Step: 14 PLACE OR VERIFY the control switch for damper AO-N-79 in the CLOSE position. Control switch for AO-N-79 rotated to the CLOSE position.

Standard:

Comment: i/' 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 7 of 15 PERFORMANCE INFORMATION Form ES-C-1 '\d' .( Performance Step:

15 PLACE OR VERIFY the control switch for damper AO-N-78 in the CLOSE position. Control switch for AO-N-78 rotated to the CLOSE position.

Standard:

Comment: .( Performance Step: 16 PLACE OR VERIFY the control switch for damper AO-N-81 in the CLOSE position. Control switch for AO-N-81 rotated to the CLOSE position.

Standard:

Comment: .I Performance Step: 17 PLACE OR VERIFY the control switch for damper AO-N-80 in the CLOSE position. Control switch for AO-N-80 rotated to the CLOSE position.

W Standard:

Comment: .( Performance Step: 18 PLACE OR VERIFY the control switch for damper AO-N-83 in the CLOSE position. Control switch for AO-N-83 rotated to the CLOSE position.

Standard:

Comment: 1, Performance Step:

I9 PLACE OR VERIFY the control switch for damper AO-N-82 in the CLOSE position. Control switch for AO-N-82 rotated to the CLOSE position.

Standard:

Comment: %L./ 2007 NRC JPM ROISRO S7 NUREG 1021, Revision 9 Appendix C Page 8 of 15 PERFORMANCE INFORMATION Form ES-C-1 W' d Performance Step: 20 PLACE OR VERIFY the control switch for damper AO-N-101 in the OPEN position.

Standard : Control switch for AO-N-101 rotated to the OPEN position. Damper positioning RED light ON, Damper positioning GREEN light OFF. Comment: Performance Step: 21 PLACE OR VERIFY the control switch for damper AO-N-100 in the OPEN position.

Standard : Control switch for AO-N-100 is already in the OPEN position. Damper positioning RED light ON, Damper positioning GREEN light OFF. Evaluator's Note: Comment: Normal position is OPEN. Performance Step: 22 PLACE OR VERIFY the control switch for damper AO-N-98 in the OPEN position.

Standard: Control switch for AO-N-98 rotated to the OPEN position.

DamRer Dositioning RED light ON, Damper positioning GREEN light OFF. Comment: Performance Step: 23 PLACE OR .'ER the control switch for damper AO-N-38 in Standard:

the OPEN position. Control switch for AO-N-138 rotated to the OPEN position.

Damper positioning RED light ON, Damper positioning GREEN light OFF. Evaluator's Note:

Normal position is OPEN. '---/ Comment: 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Append ixC Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION

\. ---- Performance Step: 24 Standard:

Evaluator's Note: Comment: Performance Step: 25 Standard:

PLACE OR VERIFY the control switch for damper AO-N-137 in the OPEN position. Control switch for AO-N-137 rotated to the OPEN position. Damper positioning RED light ON, Damper positioning GREEN light OFF. Normal position is OPEN. PLACE OR VERIFY the control switch for damper AO-N-99 in the OPEN position. Control switch for AO-N-99 rotated to the OPEN position.

Damper positioning RED light ON, Damper positioning GREEN light OFF. Comment: '-4 Evaluator's Note:

Standby Gas Train Fan B (VEX-ZIOB), which is normally in STANDBY, will start and its Train B outlet damper (AO-N-112) will open during the performance of the next step. PLACE OR VERIFY the control switch for damper AO-N-106 in the OPEN position. .I Performance Step: 26 Standard:

Comment: Control switch for AO-N-106 rotated to the OPEN position "B" SBGT starts.

2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 10 of 15 Form ES-C-I PERFORMANCE INFORMATION

  • W' Performance Step: 27 PLACE OR VERIFY the control switch for damper AO-N-108 in the OPEN position.

Standard : Control switch for AO-N-108 rotated to the OPEN position.

Comment: Performance Step: 28 Standard:

PLACE OR VERIFY the control switch for damper AO-N-112 in the OPEN position. Control switch for AO-N-112 rotated to the OPEN position.

Comment: Performance Step: 29 Standard:

PLACE OR VERIFY the control switch for STANDBY GAS FAN A, VEX-21OA, in the RUN position. Control switch for SBGT Fan VEX-21 OA placed in RUN position.

., *-' Comment: Performance Step: 30 PLACE OR VERIFY the control switch for STANDBY GAS FAN 6, VEX-210B, in the STANDBY position.

Standard: Control switch for SBGT Fan VEX-21 O$is verified to be in the Standby position.

B Comment: 2007 NRC JPM ROlSRO S7 NUREG 1021, Revision 9 Appendix C Page 11 of 15 Form ES-C-I PERFORMANCE INFORMATION l/,. NOTES: 0 Refer to Attachment 2 for the PCAC valves that have an electrical interlock with the RBIs isolation logic. This interlock requires that all the control switches for the PCAC valves affected by RBIs signal be in the CLOSED position before these logics will reset. '4 0 A high dP condition between the Reactor Building and the Torus will override the isolation signal and open AO-5040A and AO-504B in order to protect the Primary Containment from excessive negative pressure.

PLACE OR VERIFY PLACED the following control switches for the PCAC valves as indicated below: Panel C7: Performance Step: 31 AO-5044A CLOSE AO-5040A AUTO/CLOSE AO-5044B CLOSE AO-5040B AUTOlCLOSE AO-5043A CLOSE AO-5035A CLOSE AO-5043B CLOSE AO-50358 CLOSE AO-5042A CLOSE AO-5036A CLOSE AO-5042A CLOSE AO-5036B CLOSE AO-5041A CLOSE AO-5033A CLOSE AO-5041B CLOSE AO-5033B CLOSE AO-5033C CLOSE Standard:

Operator verifies that the following control switches are in the CLOSE position or AUTO/CLOSE position.

AO-5044A CLOSE - AO-5040A AUTO/CLOSE - AO-5044B CLOSE - AO-5040B AUTO/CLOSE - AO-5043A CLOSE - AO-5035A CLOSE - AO-5043B CLOSE - AO-5035B CLOSE - AO-5042A CLOSE - AO-5036A CLOSE - AO-5042BA CLOSE - AO-5036B CLOSE - AO-5041A CLOSE - AO-5033A CLOSE - AO-5041 B CLOSE - AO-5033B CLOSE - AO-5033C CLOSE - Evaluator's Note: All valves were closed. Comment: \.j 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9

~ ~- ~ ~~~ Page 12 of 15 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 32 Standard:

Evaluator's Cue: Evaluator's Notes: Comment: .I Performance Step: 33 Standard:

Comment: 1, Performance Step: 34 Evaluator's Note: Standard:

Evaluator's Cue: Evaluator's Note: Comment: IF applicable, REFER TO PNPS 2.2.1 55 to reset the Refuel Floor Radiation Monitor Trip Units on Panel C910. Operator determines that this step is not necessary and proceeds to the next step. If the operator starts toward the C910 panel, tell him that the refuel floor rad monitors have been reset. Initial conditions stated that the cause of the isolation was transfer of Y2, in addition, if operator looks, rad monitors indicate normal. RESET the Secondary Containment isolation at Panel C905 by using switch "PCIS GROUP 2, 3, 6 ISOL RESET". PClS Group 2, 3, 6 ISOL Reset switch on C905 rotated to BOTH inboard and outboard positions.

OBTAIN the keys from the SM AND RESET Secondary Containment isolation (RBIS) logic by momentarily taking the RBIs TRIP RESET keylock reset switches (2) Channel A and Channel B to "RESET" at Panel C7, then back to "NORMAL".

The isolation is now reset. Channel A RBIs Trip Reset Keylock switch placed in RESET. Channel B RBIs Trip Reset Keylock switch placed in RESET. When the operator identifies the need for keys to reset the RBIS, and where to obtain them, provide the operator with the two keys. No dampers should reposition on C7 panel if previous steps were performed correctly.

If a damper repositions then a previous step was omitted. 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 13 of 15 PERFORMANCE INFORMATION Form ES-C-1 Terminating Cue: This JPM is complete. -J STOP TIME: TIME CRITICAL STOP TIME: 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 14 of 15 Form ES-C-I VERIFICATION OF COMPLETION

'ii Job Performance Measure No.: 2007 NRC JPM RO/SRO S7 Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

Response:

Result: SAT UNSAT Examiner's Signature:

Date: 2007 NRC JPM RO/SRO S7 NUREG 1021, Revision 9 Appendix C Page 15 of 15 Form ES-C-1 JPM CUE SHEET IN IT1 AL CONDITIONS:

Following an isolation that occurred 15 minutes ago due to a planned transfer of Y2, you are required to reset the RBIs and to restore the reactor building ventilation system dampers on C-7. -LJ INITIATING CUE: Reset the- Reactor Building isolations and restore secondary containment ventilation to normal IAW PNPS 2.2.125.1.

QTT 8 2007 NRC JPM ROiSRO S7 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: PILGRIM .d Task No.: 200-05-01

-062 Task Title: Operate the Direct Torus Vent to JPM No.: 2007 NRC JPM RO S8 Maintain Primary Containment Pressure Below the PCPL KIA

Reference:

295024 EA1 .I4 3.4 13.5 Examinee: Facility Evaluator:

NRC Examiner:

Date: Method of testing: Simulated Performance: Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

L"-' Initial Conditions:

0 e e e A leak in the drywell has caused a Rx Scram. EOP-01 and EOP-03 are being used to mitigate the event. Drywell pressure is

>35 psig and rising slowly. The torus is currently being vented via the 2" torus vent valves and the 1" CAD Containment Atmosphere Dilution) valves IAW procedure

5.4.6. Although

the RPV has been depressurized, containment pressure is still rising. Torus level is 136 inches. The reactor building has been evacuated due to the potential for rupturing of duct work. I & C personnel have been briefed and are standing by with the required fuses andlor jumpers in hand" 0 0 e e e Solicit and answer any questions the operator may have. Task Standard: Required Materials:

0 Simulator Key for AO-5025 +L/ General

References:

Procedure 5.4.6 Rev. 39 2007 NRC JPM RO S8 NUREG 1021 , Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Initiating Cue: -u' "[Operator's name], vent the torus via the Direct Torus Vent IAW Procedure 5.4.6, Attachment I, Section [2](c)." Time Critical Task: NO Validation Time: 15 minutes 2007 NRC JPM RO S8 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 1. 2. 3. 4. 5. 6. 7. 8. SIMULATOR SETUP Initialize to a full power IC. Insert Safety Valve fails open. Depressurize the RPV by opening all 4 SRVs. Insert SRV Tailpipe leak as required to raise Torus airspace pressure to >35 psig. Stabilize RPV level between -30 and +40. Place the 2' torus vents in service by placing their control switches in Emergency Open. Open the CAD valves(al1 four). Stabilize plant conditions to provide for a slowly rising containment pressure.

2007 NRC JPM RO S8 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION

'L/ (Denote Critical Steps with a check mark) START TIME: Performance Step:

I Review applicable section of the procedure.

Standard: The procedure steps are reviewed.

Comment: Performance Step:

2 NOTE The following steps will place the Direct Torus Vent in service. Torus air space pressure must be 130 psig in order to break the rupture disc associated with this vent path. Standard : Comment: 2007 NRC JPM RO S8 (c) IF additional venting capacity is required, THEN PREPARE for Direct Torus Vent as follows: (I) PLACE OR VERIFY PLACED the control switch for AO- 5042B, TORUS PURGE EXHAUST ISOL VLV, in the "CLOSE" position. Operator verifies the control switch on Panel C7 in the "CLOSE" position.

NUREG 1021 , Revision 9 Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 3 4 Standard:

Evaluator's Note: .( Performance Step: 4 U' St and a rd : Evaluator's Note:

Simulator Operator: When requested, install the control power fuses using the remote function. Report to the operator when the fuses have been installed.

DEFEAT the isolation signal as necessary for AO-5042BI TORUS PURGE EXHAUST ISOL VLV, in accordance with PNPS 5.3.21, "Bypassing Selected /nter/ocks'r, Attachment

17. Operator requests I&C personnel to defeat the isolation signal for AO-5042B. The isolation signal will need to be defeated due to the high drywell pressure condition. Operator should realize that this is the case. If required, prompt operator to call I&C. Simulator Operator: When requested, defeat the isolation for AO-5042B utilizing the remote function. Report to the operator when the isolation has been defeated.

NOTE The fuse holders for the two 3-amp fuses are designated "UQQI in Panel C7. The fuse block is accessible from the rightmost door in the back of Panel C7. The fuse block can be readily located by the large yellow label plates attached to the fuse plugs. (2) INSTALL two 3-amp fuses for valve AO-5025, DIRECT TORUS VENT VLV, in the back of Panel C7 (fuses can be obtained from the EOP Support JumpedLifted Lead Tool Box or the Control Room "Q" Fuse Box). Operator requests I&C personnel to install fuses for AO-5025. The procedure describes the location of the fuses as follows: The fuse holders for the two 3-amp fuses are designated "UQQ' in Panel C7. The fuse block is accessible from the rightmost door in the back of Panel C7. The fuse block can be readily located by the large yellow label plates attached to the fuse plugs. If required, prompt operator to call I&C to perform this action. Comment: 2007 NRC JPM RO S8 NUREG 1021, Revision 9 Appendix C Page 6 of 10 PERFORMANCE INFORMATION Form ES-C-1 Performance Step:

5 4 Standard: Evaluator's Cue: Performance Step:

6 Standard: Evaluator's Cue:

2007 NRC JPM RO S8 OBTAIN key CR-W in preparation for opening AO-5025, DIRECT TORUS VENT VLV. Operator obtains key. When the operator has identified that he/she needs a key, ask the operator where he/she would obtain the key.

Once the operator has correctly identified where he would obtain the key (CR Annex or the SM's office), hand him/her the required key. NOTIFY the Shift Manager that Direct Torus Venting is about to commence . Operator verbalizes notifying the Shift Manager. Role Play as the Shift Manager and acknowledge the report.

NUREG 1021, Revision 9 Appendix C Page 7 of 10 PERFORMANCE INFORMATION Form ES-C-I NOTE Performance Step:

7 - ii The following steps will secure any existing vent paths and initiate Direct Torus Vent. These steps should be performed in an expeditious manner so as not to delay the establishment of a vent path.

INITIATE Direct Torus Vent as follows: CLOSE OR VERIFY CLOSED the following valves: SV-5083A' TORUS ISOLATION VALVE (C170) SV-5084A' TORUS ISOLATION VALVE (C170) SV-5083B' TORUS ISOLATION VALVE (C171) SV-5084B, TORUS ISOLATION VALVE (C171) AO-5042A, TORUS PURGE EXHAUST ISOL VLV (C7) AO-5041A, TORUS NORMAL EXHAUST ISOL VLV (C7) AO-5041 B, TORUS NORMAL EXHAUST ISOL VLV (C7) .I Standard:

All (7) switches are taken to the closed position.

Evaluator's Note: The procedure contains the following note:

The following steps will secure any existing vent paths and initiate Direct Torus Vent.

These steps should be performed in an expeditious manner so as not to delay the establishment of a vent path.

  • L--f The operator should make continuous progress towards establishing the direct torus vent path. Performance Step: 8 PLACE the fan control switches for SGTS Exhaust Fans VEX-21 OA and VEX-21 OB to "OFF". .I Standard: Control switches for VEX-21 OA and VEX-21 OB are taken to "OFF' position.

Performance Step: 9 VERIFY the following valves have closed:

Standard: AO-N-112, SGTS TRAIN B OUTL DMPR AO-N-108, SGTS TRAIN A OUTL DMPR Operator verifies AO-N-112 and AO-N-I 08 damper valves have closed. \, Comment: --- 2007 NRC JPM RO S8 NUREG 1021, Revision 9 Appendix C Page 8 of 10 PERFORMANCE INFORMATION Form ES-C-1 Performance Step:

10 OPEN AO-5025, DIRECT TORUS VENT VLV.

4 Standard:

Key inserted and control switch for AO-5025, Direct Torus Vent Valve, placed in OPEN position. Operator reports that venting via the direct torus vent is in progress. Performance Step:

11 OPEN AO-5042B, TORUS PURGE EXHAUST ISOL VLV. 4 Standard:

Terminating Cue: STOP TIME: Control switch for AO-5042B torus purge exhaust isolation valve is placed in open position. This JPM is complete.

TIME CRITICAL STOP TIME: 2007 NRC JPM RO S8 NUREG 1021, Revision 9 Appendix C Page 9 of 10 Form ES-C-1 VERI F I CAT1 0 N 0 F CO M P LET1 ON Job Performance Measure No.: 2007 NRC JPM RO S8 .W. Examinee's Name: Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

u' Response:

Result: SAT UNSAT Examiner's Signature:

Date: 2007 NRC JPM RO 58 NUREG 1021, Revision 9 Appendix C Page 10 of 10 Form ES-C-I JPM CUE SHEET

'W' INITIAL CONDITIONS:

e e 0 e e 0 e INITIATING CUE: A leak in the drywell has caused a Rx Scram. EOP-01 and EOP-03 are being used to mitigate the event. Drywell pressure is

>35 psig and rising slowly. The torus is currently being vented via the 2" torus vent valves and the 1" CAD Containment Atmosphere Dilution) valves IAW procedure

5.4.6. Although

the RPV has been depressurized, containment pressure is still rising. Torus level is 136 inches. The reactor building has been evacuated due to the potential for rupturing of duct work. I & C personnel have been briefed and are standing by with the required fuses and jumpers in hand" "[Operator's name], vent the torus via the Direct Torus Vent IAW Procedure 5.4.6, Attachment I, Section [2](c)." 2007 NRC JPM RO S8 NUREG 1021 , Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

PI LGRl M Task No.: 200-05-01-014

%w' Task Title: Reactor Scram and From Outside JPM No.: 2007 NRC JPM the Control Room RO/SRO PI WA

Reference:

AA1.01 3.8 13.9 AA1 .06 4.0 I 4.1 Examinee:

NRC Examiner: Facility Evaluator:

Date: Method of testinq: Simulated Performance:

X Actual Performance: Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

---.---- Initial Conditions: The plant was operating at 50% power. The main control room has been evacuated due to a fire, a scram will be performed from outside the control room, and RFPs 'A and 'C' must be tripped.

Task Standard: A reactor scram from outside of the control room shall be completed without causing inadvertent actuations.

The scram and RFP trips shall be accomplished in accordance with all system precautions and limitations.

PNPS 2.4.143 shall be followed without failure of any critical elements. Required Materials:

"S" key for panel C-511 (CR-50) General

References:

Procedure 2.4.1 43, Revision 36 Initiating Cue: Scram the reactor and trip reactor feed pumps 'A and 'C' from outside the control room using procedure 2.4.143. Inform me when you have completed the task.

Time Critical Task: NO LJ' Validation Time:

15 minutes 2007 NRC JPM RO/SRO PI NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP NIA 2007 NRC JPM RO/SRO PI NUREG 1021, Revision 9 Appendix C Page 3 of 6 PERFORMANCE INFORMATION Form ES-C-1

'4' (Denote Critical Steps with a check mark) START TIME: Performance Step: 1 Standard:

Review the applicable sections of the procedure.

Operator reviews the applicable section of the procedure. Eval uator's Note: Evaluator's Note: This task is covered in 2.4.143 Section 4.O[lO](a), (b), and (c). All manipulations are performed from the RPS panel located on the West wall of the RPS MG set room and at 416OVAC bus AI in the upper switchgear room.

All critical steps must be performed in order unless otherwise noted. Evaluator's Note: Comment: u Performance Step: 2 Standard: Eval uator's Note: .( Standard:

Evaluator's Cue: .I Standard:

Evaluator's Cue: SCRAM the Reactor by opening the following breakers on RPS power panel C511 (23' RPS MG Room): 0 0 Operator locates, unlocks and opens panel C511. Panel C511 is open. Operator locates PRNM Bus A, Bkr A4 on RPS power panel C511 and pushes the handle down to the OFF position.

"PRNM -Bus A, Breaker A4 has snapped into the OFF position." Operator locates PRNM -Bus B, Bkr B4 on RPS power panel C511 and pushes the handle down to the OFF position.

"PRNM -Bus B, Breaker 64 has snapped into the OFF position."

PRNM Bus A, Bkr A4 (red) PRNM Bus B, Bkr 84 (red) Comment: 2007 NRC JPM RO/SRO PI NUREG 1021, Revision 9 Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 3 Standard:

Evaluator's Cue: Standard: Evaluator's Cue:

Comment: Performance Step: 4 Evaluator Note:

4 Standard:

4 Standard:

Standard:

Comment: Terminating Cue: STOP TIME:


,, CLOSE the PRNM breakers on RPS Power Panel C511:

0 Operator locates PRNM -Bus A, Bkr A4 on RPS power panel C511 and pushes the handle up to the ON position.

"PRNM -Bus A, Breaker A4 has snapped into the ON position." Operator locates PRNM -Bus B, Bkr B4 on RPS power panel C511 and pushes the handle up to the ON position. "PRNM -Bus By Breaker B4 has snapped into the ON position."

PRNM -Bus A, Bkr A4 (red) PRNM -Bus 6, Bkr B4 (red) TRIP the Reactor Feed Pumps at their 4160 VAC breakers:

0 RFPA-Bkr152-101, BusAl. 0 RFP C - Bkr 152 - 102, Bus AI If the operator goes to don protective clothing, ask why.

When he says that he has to open the breaker cabinet door to trip the breaker, tell him to simulate the action of opening the breaker door and explain what actions he would be performing inside the cabinet. This is an acceptable path as he can, indeed, trip the RFP breakers from this location.

The preferred method, however, is with the control switch on the breaker front. Operator locates breaker 152-101 on bus AI and locally trips the breaker. Operator locates breaker 152-1 02 at bus AI and locally trips the breaker. Operator reports that the assigned tasks are complete.

This JPM is complete. TIME CRITICAL STOP TIME: 2007 NRC JPM RO/SRO PI NUREG 1021, Revision 9 Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2007 NRC JPM RO/SRO PI --; Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts: Time to Complete: Question Documentation:

Question:

Response:

Result: SAT UNSAT Examiner's Signature:

Date: 2007 NRC JPM RO/SRO PI NUREG 1021, Revision 9 Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET .L' INITIAL CONDITIONS: The plant was operating at 50% power. The main control room has been evacuated due to a fire, a scram will be performed from outside the control room, and RFPs 'A' and 'C' must be tripped.

INITIATING CUE: Scram the reactor and trip reactor feed pumps

'A and 'C' from outside the control room using procedure 2.4.143.

Inform me when you have completed the task. 'L-' 2007 NRC JPM RO/SRO PI NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-I Facility:

PI LGRl M -4. Task No.: 200-05-04-077 Task Title: Defeat MSlV Isolation Siqnals JPM No.: 2007 NRC JPM RO/SRO P2 WA

Reference:

223002 K4.08 3.3 / 3.7 Examinee:

NRC Examiner: Facility Evaluator:

Date: Method of testinq: Simulated Performance:

X Actual Performance: Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. -LJ' Initial Conditions:

0 Containment flooding is in progress.

0 The MSIV's need to be opened to establish a vent path, but there are MSlV isolation signals present. To open the MSIV's, all isolation signals must be bypassed.

0 Task Standard:

MSlV isolation interlocks bypassed with jumpers installed in proper locations in control room panels C915 and C917, and the MSlV isolation signal reset in accordance with Attachment 14 of procedure 5.3.21. The procedure shall be followed without failure of any critical elements. Required Materials:

0 Key CR-X 0 Four (4) Jumpers General

References:

Procedure 5.3.21, Revision 26 Initiating Cue: You are to bypass the MSlV isolation signals IAW Att. 14 of procedure 5.3.21. Inform me when I can have the C905 operator reset the Group I isolation.

2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-I Worksheet Time Critical Task: NO W Validation Time: 15 minutes 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Job Performance Measure Form ES-C-I Worksheet SIMULATOR SETUP N/A 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 4 of 11 PERFORMANCE INFORMATION Form ES-C-1 (Denofe Crifical Steps with a check mark) .I L" START TIME: Performance Step: I Evaluator's Note: Evaluator's Note: Review applicable section of the procedure.

All jumpers are installed in control room panels C915 and C917. All critical steps must be performed in order written unless otherwise noted.

Operator reviews the applicable sections of the procedure. Applicable sections of the procedure have been reviewed.

Standard:

Comment: Performance Step: 2 OBTAIN permission from the SM before placing jumpers or lifting leads. Operator obtains permission from SM to install jumpers per 5.3.21, Attachment

14. Standard:

Permission obtained.

Evaluator's Cue: (As SM) "You have permission to defeat the MSlV isolation signals."

Comment: 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 5 of 11 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 3 OBTAIN the tool kit for jumpers and lifted leads from the SM's office (key CR-X). Operator obtains key from SM's office. 4 Standard:

Key in operator's possession.

Eva1 uator's Note: The Evaluator may check out the key prior to the performance of this JPM and provide it to the Operator when the correct key is identified in the procedure.

Operator obtains correct bag of jumpers from tool box.

4 Standard: Correct bag of jumpers identified.

Eva1 uato r's Note: Evaluator's Cue: Once the box is opened and the correct jumpers are identified, reclose and lock box. "You have the jumpers."

Comment: Performance Step: 4 Evaluator's Note: PLACE jumpers OR LIFT leads of locations identified on specific Attachment for the interlock or isolation signal to be bypassed.

Since this part of the procedure is in a "chart form", the sequence of installing the jumpers can be accomplished in any order since it is not specified.

Standard:

Comment: Operator refers to Attachment

14. 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 6 of 11 PERFORMANCE INFORMATION Form ES-C-1 Performance Step:

5 Place a jumper from location EE-3 to EE-4 at Main control Room panel C917. Operator identifies jumper locations EE-3 and EE-4 at panel C917. Jumper locations EE-3 and EE-4 at panel C917 correctly identified.

Standard:

Standard:

Operator requests second verifier concurrence with location.

Second verification requested.

Evaluator's Cue: "I agree that is the proper location." Operator places jumper at location EE-3 to EE-4.

4 Standard: Jumper installed at location EE-3 to EE-4. Evaluator's Cue:

"The jumper is installed." Operator requests second individual to concur with locations identification.

Second individual is requested to verify location.

"I concur that the jumper is installed at location EE-3 to EE-4". Standard:

Evaluator's Cue: Comment: 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 7 of 11 PERFORMANCE INFORMATION Form ES-C-1 i/' Performance Step:

6 Place a jumper form location DD-22 to DD-23 at Main Control Room panel C915. Operator identifies jumper locations DD-22 and DD-23 at panel C915. Standard:

Standard: Jumper locations DD-22 and DD-23 at panel C915 correctly identified. Operator requests second verifier concurrence with location.

Second verification requested.

Eva1 u at or's Cue: "I agree that is the proper location."

Operator places jumper at location DD-22 to DD-23. 4 Standard: Jumper installed at location DD-22 to DD-23. Operator requests second individual to concur with locations identification.

Second individual is requested to verify location.

"I concur that the jumper is installed at location DD-22 to Standard:

Evaluator's Cue: DD-23. Comment: 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 8 of 11 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 7 Place a jumper from location AA-3 to AA-4 at Main Control Room panel C917. Operator identifies jumper locations AA-3 and AA-4 at panel C917. Jumper locations AA-3 and AA-4 at panel C917 correctly identified. St and a rd : Operator requests second verifier concurrence with location.

Standard:

Second verification requested.

Evaluator's Cue: "I agree that is the proper location." Operator places jumper at location AA-3 to AA-4. .I Standard:

Jumper installed at location AA-3 to AA-4. Evaluator's Cue:

"The jumper is installed." Operator requests second individual to concur with locations identification.

Second individual is requested to verify location.

"I concur that the jumper is installed at location AA-3 to AA-4." Standard:

Evaluator's Cue: Comment: 2007 NRC JPM ROlSRO P2 NUREG 1021, Revision 9

Appendix C Page 9 of 11 PERFORMANCE INFORMATION Form ES-C-1 ;J' Performance Step: 8 Place a jumper from location BB-22 to BB-23 at Main Control Room panel C915. Operator identifies jumper locations BB-22 and BB-23 at panel C917. Standard:

Standard: Evaluator's Cue:

4 Standard: Evaluator's Cue:

Standard:

Eva1 uator's Cue: Jumper locations BB-22 and BB-23 at panel C915 correctly identified. Operator requests second verifier concurrence with location.

Second verification requested.

"I agree that is the proper location. Operator places jumper at location BB-22 to BB-23. Jumper installed at location BB-22 to BB-23.

"The jumper is installed.

Operator requests second individual to concur with locations identification.

Second individual requested to verify location.

"I concur that the jumper is installed at location BB-22 to B B -23. " .-.--., Comment: Performance Step:

9 Standard: Inform the supervisor that the GP 1 isolation logic can be reset. Operator informs supervisor that the GP 1 logic can be reset.

Comment: Terminating Cue: This JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME: 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 10 of I1 VERIFICATION OF COMPLETION , Form ES-C-1 il Job Performance Measure No.: 2007 NRC JPM RO/SRO P2 Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question: .U' Response:

Result: Examiner's Signature:

SAT UNSAT Date: 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9 Appendix C Page 11 of 11 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:

0 Containment flooding is in progress.

'.d The MSIV's need to be opened to establish a vent path, but there are MSlV isolation signals present.

To open the MSIV's, all isolation signals must be bypassed. INITIATING CUE: You are to bypass the MSlV isolation signals IAW Att. 14 of procedure 5.3.21. Inform me when I can have the C905 operator reset the Group I isolation. 2007 NRC JPM RO/SRO P2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: PILGRIM

  • -d Task No.: 201-01-04-012 Task Title: Shift CRD Flow control Valves JPM No.: 2007 NRC JPM ROISRO P3 KIA

Reference:

A2.07 3.2 I 3.1 Examinee:

NRC Examiner: Facility Evaluator:

Date: Method of testinq: Simulated Performance:

X Actual Performance: Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

'd Initial Conditions:

0 The reactor is operating at power 0 The in-service CRD Flow Control Valve, FCV-302-6A has failed CLOSED. Task Standard:

The "B" CRD Flow Control Valve will be placed into service in accordance with procedure 2.2.87. The valve shall be placed in service without causing inadvertent actuations, in accordance with all system precautions and limitations and without failure of any critical elements. Required Materials:

NONE General

References:

PNPS 2.2.87, Revision 114 Initiating Cue:

You are to changeover to the "B" CRD Flow control Valve in accordance with 2.2.87. Inform me when the task is complete. Time Critical Task: NO Validation Time: 12 minutes ~e 2007 NRC JPM RO/SRO P3 NUREG 1021, Revision 9 Appendix C Job Performance Measure Worksheet Form ES-C-1 NfA 2007 NRC JPM RO/SRO P3 SIMULATOR SETUP NUREG 1021, Revision 9 Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION

..u' (Denote Critical Steps with a check mark) START TIME: Notes: This task is covered in 2.2.87, Section 7.7.5, Steps I - 9. All controls are located on the Reactor Building CRD mezzanine. HEARING PROTECTION IS REQUIRED.

All critical steps must be performed in order written unless otherwise noted. Performance Step: 1 Changeover of Flow control Valves Standard: ESTABLISH communications between Control Room and the master control station.

Verifies communications between Control Room and the master control station.

Comment: Performance Step: 2 At Panel C905, PLACE FIC-340-1, CRD FLOW CONTROL, setpoint to 0 GPM (controller may be left on automatic).

Standard: Contacts control room, requests FIC-340-1, CRD FLOW CONTROL, setpoint set to 0 GPM. Eva I u at or Cue : Comment: FIC-340-1, CRD FLOW CONTROL, setpoint is 0 GPM Performance Step: 3 SLOWLY OPEN 301-40A (B), Standby Flow control Valve (A or B) Inlet Valve. Opens 301-40B, Standby Flow control Valve B Inlet Valve.

4 Standard:

Comment: 2007 NRC JPM RO/SRO P3 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-I PERFORMANCE INFORMATION Performance Step: 4 4 Standard:

Comment: Performance Step: 5 Standard: SLOWLY OPENS 301-41A (B), Outlet Valve from standby Flow control Valve.

Opens 301-41 B, Outlet Valve from standby Flow control Valve.

CLOSE 301-41A (B), Outlet Valve from in-service Flow control Valve. Closes 301 -41 A, Outlet Valve from in-service Flow control Valve.

Comment: Performance Step: 6 CLOSE 301-40A (B), Inlet Valve for the previously in-service Flow control Valve. Standard:

Closes 301-40A, Inlet Valve for the previously in-service Flow control Valve.

Comment: Performance Step:

7 On local valve control panel, SWAP Selector Switch 3B-S1, for electrical signal to E/P unit, from valve IN-SERVICE to STANDBY valve position.

4 Standard:

Comment: Swaps Selector Switch 3B-S1, for electrical signal to E/P unit, from valve IN-SERVICE(A) to STANDBY(B) valve position. 2007 NRC JPM RO/SRO P3 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-I PERFORMANCE INFORMATION i/ Performance Step: 8 SWAP valve 3-HO-301-29, CRD Air Diversion Valve to Selected Flow Control Valve, from valve IN-SERVICE position to that of STANDBY valve (FCV-302-6A, Position 1 ; FCV-302-6B, Position 2). d Standard:

Swaps valve 3-H0-301-29, CRD Air Diversion Valve to Selected Flow Control Valve, from valve IN-SERVICE position to that of STANDBY valve FCV-302-6B, Position 2.

Comment: Performance Step:

9 Standard:

NOTIFY Control Room that flow control valves have been "swapped over" locally. Notifies control Room that flow control valves have been swapped over locally. Comment: Terminating Cue: This JPM is complete. STOP TIME:

TIME CRITICAL STOP TIME: 2007 NRC JPM RO/SRO P3 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION "e Job Performance Measure No.: 2007 NRC JPM RO/SRO P3 Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

Response:

Res u I t : SAT UNSAT Exami ne r's Sig nature: Date: 2007 NRC JPM RO/SRO P3 NUREG 1021, Revision 9 Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET

>d INITIAL CONDITIONS:

0 The reactor is operating at power. 0 The in-service CRD Flow Control Valve, FCV-302-6A has failed CLOSED. INITIATING CUE: 2007 NRC JPM ROlSRO P3 You are to changeover to the "B" CRD Flow control Valve in accordance with 2.2.87. Inform me when the task is complete.

NUREG 1021, Revision 9 I Appendix C Job Performance Measure Form ES-C-I Worksheet Facility: PILGRIM

  • d' Task No.: 201-04-01-003 Task Title: React to a Stuck Control Rod During JPM No.: 2007 NRC JPM Reactor StartuD ROlSRO S-I WA

Reference:

A2.01 3.4 13.6 Examinee:

NRC Examiner: Facility Evaluator:

Date: Method of testing: Simulated Performance: Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

'-J Initial Conditions:

The plant is starting up following a forced outage.

The reactor is subcritical.

The operator is required to continue the reactor startup withdrawing control rods and performing CRDM coupling checks. Task Standard: The reactor startup shall continue without causing inadvertent actuations. The reactor startup shall be accomplished in accordance with all system precautions and limitations.

The station startup procedures shall be followed without failure of any critical tasks. Required Materials: Current revision of pull sheets filled in up to current rod pull step. Watercolor pen for marking pull sheets. General

References:

Initiating Cue: Continue reactor startup in accordance with procedure

2.1.4. Notch

override may be used at your discretion. Coupling checks are required.

Time Critical Task: NO Validation Time: 20 minutes i"/- 2007 NRC JPM RO/SRO S-1 NUREG 1021, Revision 9

"d Appendix C Job Performance Measure Worksheet Form ES-C-1 SIMULATOR SETUP A reactor startup sequence has commenced.

The reactor is subcritical in the middle of life. The IC utilized should provide flexibility in control rod movements.

The SRM recorder and the IRM recorders are selected to fast speed. Insert malfunction RD-09, Stuck Rod, on control rod 18- 23. When initial conditions are established, freeze the simulator for turnover to the operator.

2007 NRC JPM RO/SRO S-I NUREG 1021 , Revision 9 Appendix C ~~ ~~~ Page 3 of 8 PERFORMANCE INFORMATION Form ES-C-I .\d' (Denote Critical Sfeps with a check mark) START TIME: Performance Step: I Evaluator's Note: Standard:

Review the applicable sections of Procedure 2.1.4. All critical steps must be performed in order unless otherwise noted. Operator reviews the applicable sections of Procedure 2.1.4. Eva1 uator's Note: This task is covered by PNPS 2.1.4, Section 7. Provide operator with a copy of PNPS 2.1.4, completed through step 7.0 [3]. Standard:

Operator compares pull sheet to rod position indication and current control rod selection.

Evaluator's Note: This information is provided by the pull sheet, Form RE.12. Comment: Performance Step: 2 Evaluator's Note: Withdraw Control Rods in the sequence specified on Form RE 12. BEGINS WITH ROD 18-23 at Position "12" Steps 2.a-2.d are to be evaluated "SAT after being correctly applied to all control rod movements.

4 Standard: Operator determines correct control rod selection form the control rod sequence pull sheet (Form RE 12). Uses OUT NOTCH to move rod.

Evaluator's Note: Nuclear instrument discernable response checks are NOT required.

1 Comment: ROs - cue procedure 2.4.1 I .I, SROs expected. (ATT.1 degraded control rod motion step 4 2007 NRC JPM RO/SRO S-I NUREG 1021, Revision 9

Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 3 Evaluator's Note: Continues notch withdrawal at from "14" to "I 6" and determines that control rod is stuck.

LJ 4 Standard:

SRO Operator notes that rod is stuck and enters appropriate procedure for degraded control rod motion Evaluator's Note: Comment: ROs - cue procedure 2.4.1 I .I, (AlT.1 degraded control rod motion step 4 SROs - DO NOT CUE PROCEDURE. - Critical Step for SRO Performance Step: 4 Per PNPS 2.4.1 1 .I, Att.1 "Degraded Control Rod Motion", step [I] Attempt to move control rod one notch in the direction specified by the procedure in use when the degraded control rod motion was identified Evaluator's Note: 4 Standard:

Attempts to move control rod 18-23 one notch and notes rod doesn't move.

Evaluator's Note: Comment: CUE - If told by applicant that there is no rod motion, tell the applicant to continue in procedure.

Performance Step: 5 Evaluator's Note: PNPS 2.4.1 1 .I, Att.1 steps [2]

and [3] Standard:

Evaluator's Note: These steps do not apply to this situation - Therefore NIA Comment: 2007 NRC JPM RO/SRO S-I NUREG 1021, Revision 9

Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-I Performance Step: 6 PNPS 2.4.1 1 .I Att.1 step [4] If drive motion is assumed to be degraded due to excessive friction, then

... STEP (a) - Increase drive water pressure in approx. 50 psi increments attempting to move the drive after each increment.

CUE - If asked - inform operator that the rod is stuck due to excessive friction.

'W! Evaluator's Cue: Standard: Operator increases drive pressure in 50 psi increments attempting to move drive at each increment. The drive will move when drive pressure is increased to 400 psi. Evaluator's Note: Comment: CUE - If asked - inform operator that the rod is stuck due to excessive friction.

CUE - continue with procedure once control rod is unstuck Performance Step: 7 Evaluator's Note: Once rod has become unstuck and has moved, operator will continue at step 2.4.1 1..1 Att.1 Step (12) - Return the drive water pressure to normal (approx.

250 psi above reactor press.) Standard: Operator restores drive pressure to 250 psi above reactor pressure.

Evaluator's Note: Comment: CUE - If asked, after drive pressure is restored to 250 psi, tell operator to continue with rod withdrawal.

2007 NRC JPM RO/SRO S-1 NUREG 1021, Revision 9 Appendix C

~ ~~~ Page 6 of 8 Form ES-C-I PERFORMANCE INFORMATION Performance Step: 8 position 18 Evaluator's Note: Control rod 18-23 is now at position 16, operator moves rod to .J Standard:

Operator moves control rod 18-23 with OUT NOTCH control, to position "1 8". Evaluator's Note: Comment: Terminating Cue: JPM is complete when the Control Rod is at Position 18. STOP TIME: TIME CRITICAL STOP TIME:

.-' 2007 NRC JPM RO/SRO S-1 NUREG 1021, Revision 9 Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2007 NRC JPM RO/SRO S-I L..l Examinee's Name: Date Performed: Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question:

Response:

Result: SAT UNSAT Examiner's Signature: Date:

2007 NRC JPM RO/SRO S-1 NUREG 1021, Revision 9 Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

The plant is starting up following a forced outage. The reactor is subcritical.

The operator is required to continue the reactor startup withdrawing control rods and performing checks.

'U INITIATING CUE: 2007 NRC JPM RO/SRO S-I Continue reactor startup in accordance with procedure

2.1.4. Notch

override may be used at your discretion. Coupling checks are required.

NUREG 1021, Revision 9