|
---|
Category:License-Operator
MONTHYEARML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17234A6362017-08-22022 August 2017 Requalification Program Inspection - Pilgrim Nuclear Power Station ML18081A9342017-02-0808 February 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17046A1002017-02-0808 February 2017 NRC- Initial Operator Licensing Operating Test Approval - Pilgrim Nuclear Power Station ML17046A0912017-02-0808 February 2017 Initial Operator Licensing Written Examination Approval - Pilgrim Nuclear Power Station ML17118A3052017-02-0303 February 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML15212A6072015-07-30030 July 2015 Requalification Program Inspection ML15148A3382015-05-28028 May 2015 Response to Request for Qualification Review of a Proposed Senior Operator Applicant at Pilgrim Nuclear Power Station ML15043A7112015-02-0505 February 2015 Addendum to Final Operator Exam (Folder 3) ML14094A1652014-04-0202 April 2014 Post Exam Comments, Resolution, and Technical References (Folder 1) ML14141A1882014-03-31031 March 2014 Final Qa/Related Forms (Folder 1) ML14094A1572014-03-25025 March 2014 Final Operating Exam (Sections a, B and C) (Folder 3) ML14094A1642014-03-25025 March 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14094A1612014-03-25025 March 2014 Draft Written Exam (Folder 2) ML14094A1602014-03-25025 March 2014 Draft - Outlines (Folder 2) ML14094A1592014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14094A1582014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14094A1562014-03-25025 March 2014 Written Exam Handouts to Applicants (Folder 3) ML14094A1552014-03-25025 March 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML14094A1532014-03-25025 March 2014 Final Outlines (Folder 3) ML14058A0062014-02-26026 February 2014 Initial Operator Licensing Written Test Approval Pilgrim Nuclear Power Station ML14049A4932014-02-18018 February 2014 Initial Operator Licensing Operating Test Approval ML1202300092012-01-0606 January 2012 Final Qa/Related Forms (Folder 1) ML1202300182011-12-20020 December 2011 Handouts to Applicants-Summary of References (Folder 3) ML1202300142011-12-20020 December 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1202300122011-12-20020 December 2011 Final Outlines (Folder 3) ML1135305992011-12-19019 December 2011 Operator Licensing Written Retake Examination Approval - Pilgrim Nuclear Power Station ML1202300202011-11-27027 November 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1202300222011-11-10010 November 2011 Draft Written (SRO Only)Exam (Folder 2) ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML1202300212011-10-27027 October 2011 Draft - Outlines (Folder 2) ML1118701782011-02-0101 February 2011 Final Qa/Related Forms (Folder 1) ML1118701762011-02-0101 February 2011 Post Exam Comments (Folder 1) ML1110104112011-01-24024 January 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1110104062011-01-24024 January 2011 Final Written Examination with Answer Key (401-5 Format) ML1110104092011-01-24024 January 2011 Handouts to Applicants (Folder 3) ML1110104022011-01-24024 January 2011 Final Outlines (Folder 3) ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204742011-01-0707 January 2011 Draft Written Exam (Draft 2) ML1106204792011-01-0707 January 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML1027800572010-10-0505 October 2010 Senior Reactor and Reactor Operator Initial Examinations - Pilgrim Nuclear Power Station ML1001200182010-01-0808 January 2010 2010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10 ML1001100212010-01-0808 January 2010 December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Pilgrim Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML0924702012009-09-0404 September 2009 Requalification Program Inspection (Pilgrim Nuclear Power Station) ML0913101102009-05-12012 May 2009 Final Qa/Related Forms (Folder 1) ML0911302182009-04-23023 April 2009 NRC Operator Licensing Initial Exam Results, Pilgrim Nuclear Power Station (Cover Letter Publicly Available; Enclosures Withheld from Public) ML0910006432009-03-31031 March 2009 Draft - Outlines (Folder 2) ML0912505492009-03-20020 March 2009 Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) 2019-05-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17046A1002017-02-0808 February 2017 NRC- Initial Operator Licensing Operating Test Approval - Pilgrim Nuclear Power Station ML17046A0912017-02-0808 February 2017 Initial Operator Licensing Written Examination Approval - Pilgrim Nuclear Power Station ML18081A9342017-02-0808 February 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17118A3052017-02-0303 February 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML15212A6072015-07-30030 July 2015 Requalification Program Inspection ML15148A3382015-05-28028 May 2015 Response to Request for Qualification Review of a Proposed Senior Operator Applicant at Pilgrim Nuclear Power Station ML15043A7112015-02-0505 February 2015 Addendum to Final Operator Exam (Folder 3) ML14094A1652014-04-0202 April 2014 Post Exam Comments, Resolution, and Technical References (Folder 1) ML14141A1882014-03-31031 March 2014 Final Qa/Related Forms (Folder 1) ML14094A1562014-03-25025 March 2014 Written Exam Handouts to Applicants (Folder 3) ML14094A1642014-03-25025 March 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14094A1612014-03-25025 March 2014 Draft Written Exam (Folder 2) ML14094A1602014-03-25025 March 2014 Draft - Outlines (Folder 2) ML14094A1592014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14094A1582014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14094A1572014-03-25025 March 2014 Final Operating Exam (Sections a, B and C) (Folder 3) ML14094A1552014-03-25025 March 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML14094A1532014-03-25025 March 2014 Final Outlines (Folder 3) ML14058A0062014-02-26026 February 2014 Initial Operator Licensing Written Test Approval Pilgrim Nuclear Power Station ML14049A4932014-02-18018 February 2014 Initial Operator Licensing Operating Test Approval ML1202300092012-01-0606 January 2012 Final Qa/Related Forms (Folder 1) ML1202300182011-12-20020 December 2011 Handouts to Applicants-Summary of References (Folder 3) ML1202300142011-12-20020 December 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1202300122011-12-20020 December 2011 Final Outlines (Folder 3) ML1135305992011-12-19019 December 2011 Operator Licensing Written Retake Examination Approval - Pilgrim Nuclear Power Station ML1202300202011-11-27027 November 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1202300222011-11-10010 November 2011 Draft Written (SRO Only)Exam (Folder 2) ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML1202300212011-10-27027 October 2011 Draft - Outlines (Folder 2) ML1118701762011-02-0101 February 2011 Post Exam Comments (Folder 1) ML1118701782011-02-0101 February 2011 Final Qa/Related Forms (Folder 1) ML1110104092011-01-24024 January 2011 Handouts to Applicants (Folder 3) ML1110104112011-01-24024 January 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1110104022011-01-24024 January 2011 Final Outlines (Folder 3) ML1110104062011-01-24024 January 2011 Final Written Examination with Answer Key (401-5 Format) ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204792011-01-0707 January 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML1106204742011-01-0707 January 2011 Draft Written Exam (Draft 2) ML1027800572010-10-0505 October 2010 Senior Reactor and Reactor Operator Initial Examinations - Pilgrim Nuclear Power Station ML1001100212010-01-0808 January 2010 December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Pilgrim Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML1001200182010-01-0808 January 2010 2010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10 ML0924702012009-09-0404 September 2009 Requalification Program Inspection (Pilgrim Nuclear Power Station) ML0913101102009-05-12012 May 2009 Final Qa/Related Forms (Folder 1) ML0911302182009-04-23023 April 2009 NRC Operator Licensing Initial Exam Results, Pilgrim Nuclear Power Station (Cover Letter Publicly Available; Enclosures Withheld from Public) ML0910006432009-03-31031 March 2009 Draft - Outlines (Folder 2) ML0912505492009-03-20020 March 2009 Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) ML0912505522009-03-0101 March 2009 Handouts to Applicants (Folder 3) 2019-05-15
[Table view] |
Text
ES-401 BWR Examination Outline Form ES-401-1 Facility: PNPS Date of Exam: TBD SRO-Only Points Tier Group K K Total A2 Total 1 2 1.
0 0 0 4 3 7 Emergency
& 2 0 2 3 0 0 Plant Evaluations Tier 0 0 0 6 4 10 Totals 1 0 0 0 2 3 5 2.
2 0 0 0 0 2 3 Plant Systems Tier 0 0 0 4 4 8 Totals
- 3. Generic Knowledge & Abilities 1 2 3 4 1 2 3 4 7 0 0 0 0 2 1 2 2 Note 1. Ensure that at least two topics from every applicable KIA category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each KIA category shall not be less than two).
- 2. The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by 1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
- 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to section D.1.b of ES-401 , for guidance regarding elimination of inappropriate KIA statements.
- 4. Select topiCS from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
- 5. Absent a plant specific priority, only those KAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
- 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and KIA categories.
7.* The generic (G) KlAs in Tiers 1 and 2 shall be selected from Section 2 of the KIA Catalog. but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KIA's
- 8. On the following pages, enter the KIA numbers, a brief description of each topic, the topics' importance ratings OR) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. If fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2.
Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
- 9. For Tier 3. select topiCS from Section 2 of the KIA Catalog, and enter the KIA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to KlAs that are linked to 10CFR55,43
E8-401 BWR Examination Outline Form E8-401-1 Emergency and Abnormal Plant Evolutions - Tier 1 Group 1 EAPE#/Name Safety Function KIA Topic(s)
AA2.02 - Ability to determine and/or interpret following 295016 Control Room Abandonment I 7 as they apply to CONTROL 4.3 1 ROOM ABANDONMENT:
Reactor water level AA2.08 - Ability to determine and/or interpret the following 295005 Main Turbine as they apply to MAl N Generator Trip 13 2 TURBINE GENERATOR TRIP: Electrical distribution status EA2.03 - Ability to determine and/or interpret the following 295038 High Off-site as they apply to HIGH OFF Release Rate / 9 4.3 3 SITE RELEASE RATE:
2.4.4 - Emergency Procedures I Plan: Ability recognize abnormal 295018 Partial or Total indications for system Loss of CCW / 8 4.7 4 operating parameters which are entry-level conditions for emergency and abnormal res, 2.4,2 - Emergency Procedures I Plan:
295031 Reactor Low Water Knowledge of system set Level 12 4.6 5 pOints, interlocks and automatic actions associated with EOP E:mt conditions.
2.4.20 - Emergency Procedures I Plan:
295006 SCRAM I 1 Knowledge of operational 4.3 6 implications of EOP warnings, cautions, and notes.
EA2.04 - Ability to determine and/or interpret the following as they apply to LOW 295030 Low Suppression SUPPRESSION POOL Pool Water Levell 5 3.7 7 WATER LEVEL: Drywell/
suppression chamber differential pressure: Mark 1&11 KIA Category Totals Group Point Total: 7
ES-401 BWR Examination Outline Form ES-401-1 Emergency and Abnormal Plant Evolutions - Tier 1 Group 2 EAPE#/Name Safety Function KIA Topic(s)
AA2.02 - Ability to determine and/or interpret the following 295008 High Reactor as they apply to HIGH 3.4 8 Water Level / 2 REACTOR WATER LEVEL:
Steam flow/feedflow mismatch 2.2.12 - Equipment Control:
295010 High Drywell Knowledge of surveillance 4.1 9 Pressure /5 ures.
EA2.02 - Ability to determine and/or interpret the following 295032 High Secondary as they apply to HIGH Containment Area SECONDARY 3.5 10 Temperature / 5 CONTAINMENT AREA TEMPERATURE:
KIA Category Totals 000 3
ES-401 BWR Examination Outline Form ES-401-1 Plant Systems - Tier 2 Group 1 System #/Name KIA Topic(s)
A2.19 - Ability to (a) predict the impacts of the following on the REACTOR CORE ISOLATION COOLING SYSTEM (RClC) ; and (b) based on those 217000 RCIC predictions, use 3.6 11 procedures to correct, control, or mitigate the consequences of tl10se abnormal conditions or operations: High suppression pool tem rature A2.02 - Ability to (a) predict the impacts of the following on the AUTOMATIC DEPRESSURIZATION SYSTEM; and (b) based 218000 ADS on those predictions, use 3.6 12 procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Large break LOCA 2.1.20 - Conduct of 300000 Instrument Operations: Ability to Air 4.6 13 interpret and execute ure 2.2.25, APRMs, Knowledge of the bases 215005 APRMs in Technical 4.2 14 Specifications for limiting conditions for operations and saf limits.
2.1.23 - Conduct of Operations: Ability to perform specific system 239002 SRVs and integrated plant 4.4 15 procedures during all modes of plant ration.
KIA Category Totals Group Point Total: 5
ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: Date:
Category KA# Topic RO SRO-Only IR Q# IR Q#
- 1. Conduct of Ability to use plant computers to i 2.1.19 3.8 19 Operations evaluate system or component status.
Ability to explain and apply all system 2.1.32 4.0 25 limits and precautions.
Subtotal ;',;, '< 2
- 2. Equipment Ability to apply technical specifications 2.2.40 20 Control for a system.
Subtotal 15. ;";; , *.,. , .* ,:, ...... 1 2.3.11 Ability to control radiation releases. 4.3 21
- 3. Radiation Knowledge of radiation or Control contamination hazards that may arise 2.3.14 3.8 24 during normal, abnormal, or emergency conditions or activities.
iSubtotal I, . ;', .'., .......
.. , ;.. 2
ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 I
Ability to verify system alarm setpoints
- 4. Emergency !
2.4.50 and operate controls identified in the 4.0 22 Procedures /
alarm response manual.
Plan Knowledge of "fire in the plant" I 2.4027 3.9 23 procedures.
Subtotal : .......*.. 2 Tier 3 Point Total: I" 7
ES-401 Record of Rejected KIA's Form ES-401-4 Random Iy Selected Tier / Group Reason for Rejection KA SRO (#3): EA2.02 - Ability to determine and/or interpret !
the following as they apply to HIGH OFF-SITE RELEASE RATE: Total number of curies releases. Pilgrim utilizes dose and dose rate as the parameters of concern, vice curies, in its procedures associated with high off-site 2950381 EA2.02 releases. It is not possible to develop an operationally valid 1 11 replaced by question addressing number of curies released.
295038 / EA2.03 Randomly selected 295038 EA2.03 - Ability to determine and/or interpret the following as they apply to HIGH OFF SITE RELEASE RATE: Radiation levels.
SRO (#14): 2.4.49 - Emergency Procedures! Plan: Ability to perform without reference to procedures those actions that require immediate operation of system components and controls. Difficult to write an SRO level question for 261000/2.4.49 this KIA.
2.1 1 replaced by 215005/2.2.25 Randomly replaced with 215005 ! 2.2.25, APRlVls, Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.
SRO (#19): Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Chief Examiner determined that the originally proposed question did not satisfy the required attributes of an SRO level question. Facility determined 2.1.5 replaced by 3 that this KIA is more appropriately used to test RO level of 2.1.19 knowledge.
Randomly replaced with genenc KIA 1.19. Ability to use plant computers to evaluate system or component status.
i i
ES-401 Record of Rejected KIA's Form ES-401-4