ML091130218
| ML091130218 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/23/2009 |
| From: | Hansell S Operations Branch I |
| To: | Fallacaro V Entergy Nuclear Operations |
| Hansell S | |
| Shared Package | |
| ML082600435 | List: |
| References | |
| TAC U01744 | |
| Download: ML091130218 (5) | |
Text
April 23, 2009 Mr. Vincent Fallacaro Manager, Training and Development Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Entergy at Chiltonville Training Center 46 Sandwich Road Plymouth, MA 02360
Subject:
NRC Operator Licensing Initial Exam Results Pilgrim Nuclear Power Station (Cover letter publicly available; enclosures withheld from public.)
Dear Mr. Fallacaro:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on March 30, 2009, and the walk-through (overall) and/or simulator operating tests administered March 23 - 27, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, nine individuals who took the examination passed.
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).
is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety
Mr. Vincent Fallacaro Manager, Training and Development Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Entergy at Chiltonville Training Center 46 Sandwich Road Plymouth, MA 02360
Subject:
NRC Operator Licensing Initial Exam Results Pilgrim Nuclear Power Station (Cover letter publicly available; enclosures withheld from public.)
Dear Mr. Fallacaro:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on March 30, 2009, and the walk-through (overall) and/or simulator operating tests administered March 23 - 27, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, nine individuals who took the examination passed. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety SUNSI Review Complete: SLH (Reviewer=s Initials)
ADAMS PKG NO.: ML082600435 DOCUMENT NAME: G:\\DRS\\Operations Branch\\DANTONIO\\Exam 09-PIL Mar 09 (U01744)\\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public.
OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JDAntonio/JD SLHansell/SLH DATE 04/22/09 04/22 /09 04/ 23 /09 OFFICIAL RECORD COPY
Docket No. 050-293 License No. DPR-35
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
K. H. Bronson, Site Vice President
Distribution: w/o enclosures:
Master Exam File