ML120230018
Jump to navigation
Jump to search
| ML120230018 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/20/2011 |
| From: | Todd Fish Operations Branch I |
| To: | Entergy Nuclear Operations |
| Jackson D | |
| Shared Package | |
| ML112730061 | List: |
| References | |
| TAC U01865, 50-293/11-302 50-293/11-302 | |
| Download: ML120230018 (1) | |
Text
Summary of References
- 1. EP-IP-100.1 EMERGENCY ACTION LEVELS, Attachment 9.1
- 2. Single and Dual Loop Power to Flow Maps
- 3. Last page ONLY of Tech Spec TABLE 3.2.B and associated note page.
- 4. Tech Spec 3.5.C, NO bases
- 5. Tech Spec 3.5.B.1, NO bases
- 6. Tech Spec 3.5.B.2, NO bases
- 7. EOP-02 power and pressure legs
- 8. TS 3.3.B.1, NO bases
- 9. TS 3.3.0, NO bases
- 10. TS 3.3.H, NO bases
- 11. EP-IP 400, Attachment 1, Sheets 2 and 3 ONLY