Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19135A66415 May 2019Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations
ML18005A4203 January 2018Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018Generic Fundamentals Examination
ML17234A63622 August 2017Requalification Program Inspection - Pilgrim Nuclear Power Station
ML18081A9348 February 2017Final Qa/Related Forms - Form ES-401-6 (Folder 1)
ML17046A1008 February 2017NRC- Initial Operator Licensing Operating Test Approval - Pilgrim Nuclear Power Station
ML17046A0918 February 2017Initial Operator Licensing Written Examination Approval - Pilgrim Nuclear Power Station
ML17118A3053 February 2017Final Outlines (Folder 3)Locked High Radiation Area
Pressure Boundary Leakage
ML17018A28217 January 2017Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017Generic Fundamentals Examination
ML15212A60730 July 2015Requalification Program Inspection
ML15148A33828 May 2015Response to Request for Qualification Review of a Proposed Senior Operator Applicant at Pilgrim Nuclear Power Station
ML15043A7115 February 2015Addendum to Final Operator Exam (Folder 3)Job Performance Measure
ML14094A1652 April 2014Post Exam Comments, Resolution, and Technical References (Folder 1)Job Performance Measure
ML14141A18831 March 2014Final Qa/Related Forms (Folder 1)
ML14094A15725 March 2014Final Operating Exam (Sections a, B and C) (Folder 3)Offsite Dose Calculation Manual
Met Tower
Temporary Modification
Squib
Job Performance Measure
Pressure and Temperature Limits Report
Scram Discharge Volume
Overtravel
Power change
Downpower
Unidentified leakage
Failure to Scram
ML14094A16425 March 2014Draft Operating Exam (Sections a, B, and C) (Folder 2)Offsite Dose Calculation Manual
Temporary Modification
Squib
Job Performance Measure
Scram Discharge Volume
Overtravel
Power change
Unidentified leakage
Failure to Scram
ML14094A16125 March 2014Draft Written Exam (Folder 2)Shutdown Margin
Ultimate heat sink
Time to boil
Temporary Modification
Squib
Locked High Radiation Area
MELLLA
Operability Determination
Power change
Overexposure
Failure to Scram
Water hammer
ML14094A16025 March 2014Draft - Outlines (Folder 2)Squib
Locked High Radiation Area
Scram Discharge Volume
Overtravel
Power change
Unidentified leakage
Failure to Scram
Water hammer
ML14094A15925 March 2014NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)
ML14094A15825 March 2014NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML14094A15625 March 2014Written Exam Handouts to Applicants (Folder 3)Time to boil
ML14094A15525 March 2014Final Written Examination with Answer Key (401-5 Format) (Folder 2)Time of Discovery
Shutdown Margin
Ultimate heat sink
Mission time
Squib
Locked High Radiation Area
MELLLA
Operability Determination
Power change
Overexposure
Failure to Scram
Water hammer
ML14094A15325 March 2014Final Outlines (Folder 3)Squib
Locked High Radiation Area
Scram Discharge Volume
Overtravel
Power change
Unidentified leakage
Failure to Scram
Water hammer
ML14058A00626 February 2014Initial Operator Licensing Written Test Approval Pilgrim Nuclear Power Station
ML14049A49318 February 2014Initial Operator Licensing Operating Test Approval
ML1202300096 January 2012Final Qa/Related Forms (Folder 1)
ML12023001820 December 2011Handouts to Applicants-Summary of References (Folder 3)
ML12023001420 December 2011Final Written Examination with Answer Key (401-5 Format) (Folder 2)Ultimate heat sink
Abnormal operational transient
Earthquake
Power change
ML12023001220 December 2011Final Outlines (Folder 3)
ML11353059919 December 2011Operator Licensing Written Retake Examination Approval - Pilgrim Nuclear Power Station
ML12023002027 November 2011NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)
ML12023002210 November 2011Draft Written (SRO Only)Exam (Folder 2)Abnormal operational transient
Earthquake
Power change
Failure to Scram
ML11300005327 October 2011Announcement of Generic Fundamentals Examination 2012 Administration DatesGeneric Fundamentals Examination
ML12023002127 October 2011Draft - Outlines (Folder 2)
ML1118701781 February 2011Final Qa/Related Forms (Folder 1)Job Performance Measure
ML1118701761 February 2011Post Exam Comments (Folder 1)
ML11101041124 January 2011Final Operating Exam (Sections a, B, and C) (Folder 3)Grab sample
Squib
Job Performance Measure
Feedwater Heater
Scram Discharge Volume
MELLLA
Overtravel
Pressure Boundary Leakage
Pressure boundary leak
Power change
Coast down
Failure to Scram
Manual Operator Action
Water hammer
ML11101040624 January 2011Final Written Examination with Answer Key (401-5 Format)Reactor Vessel Water Level
Half scram
Squib
Locked High Radiation Area
Power change
ML11101040924 January 2011Handouts to Applicants (Folder 3)
ML11101040224 January 2011Final Outlines (Folder 3)Grab sample
Overtravel
Pressure boundary leak
Power change
Failure to Scram
ML11014034314 January 2011Announcement of Generic Fundamentals Examination (GFE) 2011 Administration DatesGeneric Fundamentals Examination
ML1106204747 January 2011Draft Written Exam (Draft 2)Reactor Vessel Water Level
Half scram
Squib
Feedwater Heater
Power change
Failure to Scram
Overspeed trip
ML1106204797 January 2011Draft Operating Exam (Sections a, B, and C) (Folder 2)Half scram
Grab sample
Squib
Job Performance Measure
Feedwater Heater
Scram Discharge Volume
MELLLA
Overtravel
Pressure Boundary Leakage
Pressure boundary leak
Power change
Coast down
Failure to Scram
Manual Operator Action
Water hammer
ML1027800575 October 2010Senior Reactor and Reactor Operator Initial Examinations - Pilgrim Nuclear Power Station
ML1001200188 January 20102010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10Generic Fundamentals Examination
ML1001100218 January 2010December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Pilgrim Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public)Generic Fundamentals Examination
ML0924702014 September 2009Requalification Program Inspection (Pilgrim Nuclear Power Station)
ML09131011012 May 2009Final Qa/Related Forms (Folder 1)
ML09113021823 April 2009NRC Operator Licensing Initial Exam Results, Pilgrim Nuclear Power Station (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML09100064331 March 2009Draft - Outlines (Folder 2)
ML09125054920 March 2009Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)