ML071230748
ML071230748 | |
Person / Time | |
---|---|
Site: | Monticello ![]() |
Issue date: | 05/03/2007 |
From: | Valos N A NRC/RGN-III/DRS/OLB |
To: | |
Shared Package | |
ML070660508 | List: |
References | |
50-263/07-301 | |
Download: ML071230748 (4) | |
Text
LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007 MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Technical Specification
3.1.7 Bases
Alarm Response Procedure C.6-005-B-15 Electrical Prints:
NX-7834-67-9 NX-7834-67-10 NX-7834-67-11 NX-7834-67-13 Attached Pictures of IRM Channel #11 Related Question # 5 Revision 0 Revision 3 Revision G Revision H NIA NIA NIA 7, 8 9 Technical Specification
3.5.1 Bases
Technical Specification
3.5.2 Bases
Technical Specification
3.5.3 Bases
Attached Picture of SBGT Controller FIC 2943 11 Revision 2 Revision 0 Revision 0 NIA 13 451 2-CM, Trouble Shooting For 250 VDC Battery System Grounds - Battery No. 13 18 Revision 9 22 REFERENCE HANDOUTS PROVIDED REVISION NUMBER Technical Specification
3.1.7 Amendment
146 Attached Picture of APRM Channel 4 1 NIA Technical Specification
3.5.1 Technical
Specification 3.5.2 Technical Specification 3.5.2 Amendment 146 Page 1 of 3 MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED All of the EOP Flow Charts (with the Entry Conditions blanked out) I 26 Various Attached Picture of RBCCW Pump Switches I N/A Revision 16 N/A A.2-101, Classification of Emergencies I Revision 37 Drywell Spray Limit curve [ Figure N from C.5-1200, PRIMARY CONTAINMENT CONTROL1 31 39 44 50 Attached Picture of Reactor Recirculation System Control Board Meters Ops Man C.4-B.05.01.02.A, Figure 1, Monticello Nuclear Generating Plant Power-Flow Operating Map Ops Man C.4-C, Figure 2, Reactor Depressurization Rate Revision 12 ~~ Revision 29 Ops Man C.5.1-1000, Figure 21, Heat Capacity Temperature Limit Revision 19 Attached Picture of No. 1 Main Transformer Deluge System N/A I 59 Ops Man C.4-6.06.03.A, Figure 1, Turbine Exhaust Pressure Limits Revision 10 I 68 Revision 1 Ops Man B.9.2-06, Figure 2, Reactive Capability vs. Megawatt Load - Turbine Generator 1 N/A Steam Tables N/A NOTE: The following reference handouts are for the SRO-only examination.
I- Various r Revision 1 Emergency Action Level Matrix 83 4 Awl 04.01.05, Reactivity Management Program FP-OP-RM-01 Revision 8 FP-OP-RM-01, Reactivity Management Program I Revision 0 Page 2 of 3 MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED 88 89 93 Technical Specification 3.0 Technical Specification
3.4.7 Technical
Specification
3.7.2 Technical
Specification 3.0 Bases Technical Specification 3.4.7 Bases Technical Specification 3.7.2 Bases Technical Specification 3.4.3 Technical Specification
3.4.3 Bases
4 AWI-04.08.02, 1 OCFR50.72 and 1 OCFR73.71 Immediate Notification NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and 50.73 0289-A, Service Water Effluent Monitor Functional Test FP-G-DOC-04, Procedure Processing QF-0013, Temporary Change Request 4 AW 1-02.02.02, Procedure Reviews and Approval
~ Amendment 146 Revision 0 ~ Amendment 146 Revision 0 Revision 14 Revision 2 Revision 14 Revision 3 Revision 4 Revision 23 Page 3 of 3