Rev 1 to Bfnp Unit 2,Cycle 8 Colr.
ML18038B266
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/24/1995
From: KEYS A L, WELCH K L
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18038B265 List:
References
NUDOCS 9505030334
Download: ML18038B266 (24)


Text

TVA-CPLR-BF2CS Revision 1, Psge 1 Browns Ferry Nuclear Plant Unit 2, Cycle 8 CORE OPERATING LIMITS REPORT (COLR)TENNESSEE VALLEY AUTHORITY Nuclear Fuel Division BWR Fuel Engineering Department Prepared By: Date:~S<&Kenneth.Welch, Engineering'Specialist BWR Fuel Engineering Verified By: A an L.Bruce, Nuclear Engineer BWR Fuel Engineering Date: 3 l>'I4 Approved By: T.A.Keys, anager BWR Fuel Engineering Reviewed By: Date: 5 Zt Reactor Engineering Sup is r Reviewed By: PO C Chairman Date: ,cy5050>p>

050002bp q5pq24 pDR AQQCK o pDR P' (j'l TVA Nuclear F Core Operating Limits Report TVA-COLR-BF2CS Revision 1, Page 2 Revision Log~Revi i n Date 0 10/6/94 Desecri tion Initial Release Affec ed P Change APRM flow biased rod block setpoint;incorporate changes due to Tech Spec Amendment no.232.5,6

TVA Nuclear Ft Core Operating Limits Report TVA-COLR-BF2C8 Revision 1, Page 3 1.INTRODUCTION This Core Operating Limits Report for Browns Ferry Unit 2, Cycle 8 is prepared in accordance with the requirements of Browns Ferry Technical Specification 6.9.1.7.The core operating limits presented here were developed using NRC-approved methods (References 1 and 2).Results from the reload analyses for Browns Ferry Unit 2, Cycle 8 are documented in Reference 3.The cycle 8 loading includes four Westinghouse QUAD+demonstration assemblies.

The locations of these assemblies satisfy the criteria specified in References 4 and 5.Evaluations performed by Westinghouse (Reference 5)show that the results of licensing analyses for the lead PSxSR fuel assembly bound those for the QUAD+demonstration assemblies.

Cycle specific analyses confirm this conclusion.

The following core operating limits are included in this report: a.Average Planar Linear Heat Generation Rate (APLHGR)Limit (Technical Specification 3.5.1)b.Linear Heat Generation Rate (LHGR)Limit (Technical Specification 3.5.J)c.Minimum Critical Power Ratio Operating Limit (OLMCPR)(Technical Specification 3.5.K/4.5.K) d.APRM Flow Biased Rod Block Trip Setting (Technical Specification 2.1.A.l.c, Table 3.2.C, and Specification 3.5.L)e.RBM Upscale (Flow Bias)Trip Setting and Clipped Value (Technical Specification Table 3.2.C)2.APLHGR LIMIT (TECHNICAL SPECIFICATION 3.5.1)The APLHGR limit for each type of fuel as a function of exposure is shown in Tables 1-7.The APLHGR limits for the GE9B bundles (GESXSNB)are for the most limiting lattice at each exposure point.The specific values for each lattice are given in Reference 6.

TVA Nuclear F Core Operating Limits Report TVA-COLR-BF2C8 Revision 1, Page 4 3.LHGR LIMIT (TECHNICAL SPECIFICATION 3.5 J)The LHGR limit for unit 2 cycle 8 is fuel type dependent, as shown below:~FI~T~PSX8R/BPSXSR/QUAD+

GE8X8NB LH R Limi 13.4 kw/ft 14.4 kw/ft a.OLMCPR (TECHNICAL SPECIFICATION 3.5.K/4.5.K) whichever is greater ZA ZB a.The OLMCPR is equal to the fuel type and exposure dependent MCPR limit at rated flow and rated power shown in Figures 1-2 multiplied by the Kf shown in Figure 3, where;Zow ZB Z=00 or Z-Zi=0.90 sec (Specification 3.3.C.1 scram time limit to 20%insertion from fully withdrawn)i Zi=0.710+1.65-(0.053)N 2 n n g Zi Zave n where;n=Number of surveillance rod tests performed to date in cycle (including BOC test).Zi=Scram time to 20%insertion from fully withdrawn of the i fod N=Total number of active rods measured in Specification 4.3.C.1 at BOC b.For the performance of Surveillance Requirement 4,5.K.2.a (prior to initial scram time measurements for the cycle),

TVA Nuclear F Core Operating limits Report TVA-COLR-BF2C8 Revision 1 Page 5 c.For the performance of Surveillance Requirement 4.5.K.2.b,'6 shall be determined in accordance with 4.a above.5.APRM FLOW BIASED ROD BLOCK TRIP SETTING (TECHNICAL SPECIFICATION 2.1.A.1.c, TABLE 3.2.C, AND SPECIFICATION 3.5.L)The APRM Rod Block trip setting shall be: SRB S (0.58W+57%)where: SRB=Rod Block setting in percent of rated thermal power (3293 MWt)W=Loop recirculation fiow rate in percent of rated Note: Under certain conditions, the APRM Rod Block setting must be adjusted by FRP/CMFLPD.

See Technical Specification 3.5.L 6.RBM UPSCALE (FLOW BIAS)TRIP SETTING AND CLIPPED VALUE (TECHNICAL SPECIFICATION TABLE 3.2.C)The RBM Upscale trip setting shall be: 5 (0.66W+43%)where: Trip level setting is in percent of rated thermal power (3293 MWt)W=Loop recirculation fiow rate in percent of rated RBM upscale flow-biased setpoint clipped at 109 percent rated reactor power.

TVA Nuclear F Core Operating Limits Report TVA-COLR-BF2CS Revision 1 Page 6 7.REFEMPlCKS 1.NEDE-24011-P-A-10,"General Electric Standard Application for Reactor Fuel", February 1991.2.NEDE-24011-P-A-10-US,"General Electric Standard Application for Reactor Fuel", March 1991.3.24A5153, Rev.0,"Supplemental Reload Licensing Report for Browns Ferry Nuclear Plant Unit 2 Reload 7 Cycle 8," September 1994.4.Safety Evaluation by the office of Nuclear Reactor Regulation Supporting Amendment No.125 to Facility Operating License No.DPR-52, Tennessee Valley Authority, Browns Ferry Nuclear Power Plant, Unit 2, Docket No.50-260.5.WCAP-10507 dated March 1984,"QUAD+Demonstration Assembly Report," Westinghouse Electric Corportion.

6.24A5153AA, Rev.0,"Lattice-Dependent MAPLHGR Report for Browns Ferry Nuclear Plant Unit 2 Reload 7 Cycle 8", September 1994.7.Safety Evaluation by the office of Nuclear Reactor Regulation Supporting Amendment No.232 to Facility Operating License No.DPR-52, Tennessee Valley Authority, Browns Ferry Nuclear Power Plant, Unit 2, Docket No.50-260.

TVA Nuclear Core Operating L>mits Report TVA-COLR-BF2CS Revision 1, Page 7 Tab1l: 1 APLHGR Limits for Bundle Type GE9B-P8DWB319-9GZ (GE8X8NB)Most Limiting Lattice for Each Exposure Point Average Planar Exposure{QW~D/T}0.0 0.2 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 12.5 15.0 20.0 25.0 35.0 45.0 51.20 APLHGR Limit~kw ft 11.64 11.68 11.77 11.88 12.01 12.12 12.22 12.32 12.49 12.65 12.77 12.86 12.86 12.62 12.06 11.47 10.41'.81 5.91

TVA Nuclear Core Operating Limits Report TVA-COLR-BF2CS Revision 1, Page 8 Table 2 APLHGR Limits'for Bundle Type GE9B-P8DWB325-10GZ (GE8X8NB)Most Limiting Lattice for Each Exposure Point Average PIanar Exposure++AT}0.0 0.2 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 12.5 15.0 20.0 25.0 35.0 45.0 50.27 APLHGR Limit~kwf-10.97 11.00 11.11 11.31 11.54 11.79 11.97 12.10 12.23 12.35 12.46 12.58 12.58 12.35 11.86 11.33 10.12 8.60 5.92

TVA Nuclear F Core Operating Limits Report TVA-COLR-BF2CS Revision 1, Page 9 Table 3 APLHGR Limits for Bundle Type GE9B-P8DWB326-7GZ (GE8X8NB)Most Limiting Lattice for Each Exposure Point Average Planar Exposure$QW~D~0.'0 0.2 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 12.5 15.0 20.0 25.0 35.0 45.0 50.5 51.4 APLHGR Limit~f 11.45 11.47 11.55 11.70 11.87 12.01 12.13 12.22 12.31 12.41 12.51 12.63 12.64 12.41 11.91 11.35 10.15 8.72 5.93 5.87' 0

TVA Nuclear Fu Core Operating L ts Report TVA-COLR-BF2CS Revision 1, Page 10 Table 4 APLHGR Limits for Bundle Type BP8DRB301L (BP8X8R)Average Planar Exposure K~SR 0.0 0.2 1.0 2.0 3.0 40 5.0 6.0 7.0 8.0 9.0 10.0 12.5 15.0 20.0 25.0 35.0 43.5 APLHGR Limit~kw f 11.32 11.33 11.40 11.50 11.61 11.73 11.86 11.93 11.98 12.03 12.11 12.19 12.34 12.47 12.58 12.03 10.82 9.17 TVA Nuclear Fu Core Operating L Report TVA-COLR-BF2C8 Revision 1, Page ll Table 5'PLHGR Limits for Bundle Type BP8DRB299 (BP8X8R)Average Planar Exposure gQWD~0.0 0.2 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 12.5 15.0 20.0 25.0 35.0 42.1 APLHGR Limit~f 10.71 10.75 10.86 11.01 11.19 11.35 11.47 11.62 11.78 11.95 12.09 12.20 12.37 12.47 12.37 11.77'0.65 9.36 TVA Nuclear F Core Operating L>mits Report TVA-COLR-BF2C8 Revision 1, Page 12 Table 6 APLHGR Limits for Bundle Type P8DRB284L and Westinghouse QUAD+LTAs (PSX8R)Average Planar Exposure{Q~&5K 0.2 1.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 APLHGR Limit~f 11.2 11.3 11.8 12.0 12.0 11.8 11.2 10.8 10.2 9.5 8.8 TVA Nuclear Fu Core Operating LiMnts Report TVA-COLR-BF2CS Revision 1, Page 13 Table 7 APLHGR Limits for Bundle Type P8DRB265H (P8X8R)Average Planar Exposure t'(~WD$T}0.2 1.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 APLHGR Limit~kw f 11.5 11.6 11.9 12.1 12.1 11.9 11.3 10.7 10.2 9.6 TVA Nuclear Fu~Core Operating Liats Report TVA-COLR-BF2CB Revision 1, Page 14 Figure 1 MCPR Operating Limit for PBXBR/BPBXBR/QUAD+

1.33 1.32 1.31 1.30'E 1.29 g-1.28 1.27 1.26 1.25 1.24 1.23 (EOCS-3080) to EOCS BOCS to (EOCS-3080) 0.0 0.1 OE2 OE3 0.4 0.5 OE6 0.7 0.8 OE9 1.0 Option B Option A E~ERR BOC8 to (EOC8-3080 MWD/ST)(EOC8-3080 MWD/ST)to EOC8 tion A Tau=i 0 1.26*1.30 0 tion B Tau=0.0 1.25 1.27*Use this value at BOC8 prior to performing scram time testing.

TVA Nuclear Fu Core Operating Liats Report TVA-COLR-BF2CS Revision 1, Page 1S E Figure 2 MCPR Operating Limit for GESXSNB It 1.33 1.32 1.31 1.3 g 1.29 g 128 1.27 1.26 BO CS-30&0)toE OCS-3 CS to(E OCS 0&0)1.25 1.24 1.23 0 0.'1 OE2 OE3 OA OE5 OE6 0.7 OE8 0.9 1 Option B Option A~E BOC8 to (EOC8-3080 MWD/ST)(EOC8-3080 MWD/ST)to EOC8 0 tion A Tau=1.0 1.27*1.32 0 tion8 Tau=0.0 1.25 1.29*Use this value at BOC8 prior to performing scram time testing.

TVA Nuclear Fu~Core Operating L~Report TVAWOLR-BF2C8 Revision 1, Page 16 (Final)1.4 Figure 3 GEXL-Plus Kf Curve OLMCPR Flow Corrections 1.3 None 117.0,%n2.0%107.0%102.5%1.0 20 30 40 60 60 70 80 80 100 Total Core Flow (%rated)For 40%(WT (100%, Kf=MAX[1.0, A-0.00441~WT]

WT (40%, Kf=[A-0.00441*WT