Rev 0 to Browns Ferry Nuclear Plant Unit 2,Cycle 9 Colr
ML18038B647
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/14/1996
From: Bruce A, Keys T, Riley E
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18038B646 List:
References
TVA-COLR-BF2C9, TVA-COLR-BF2C9-R, TVA-COLR-BF2C9-R00, NUDOCS 9603290348
Download: ML18038B647 (36)


Text

TVANuclear Fuel ~

3 9 6 3

TVA-COLR-BF2C9 Core Operating Limit~ort Revision 0, Page 1

QA RECORD Browns Ferry Nuclear Plant Unit 2,:Cycle 9 CORE'PERATING LIMITSREPORT (COLR)

TENNESSEE VALLEYAUTHORITY Nuclear Fuel Division BWR Fuel'Engineering Department Prepared By:

Alan L. Bruce, Nuclear Engineer BWR Fuel Engineering Verified By:

Mefei/ /

Date:

7 "//- 5 6 Earl E. Riley, Engine ring'Specialist BWR Fuel Engineering Approved By:

T.'=A. Keys, anager BWR Fuel ngineering Reviewed By:

eactor Engineering Supervisor Reviewed, By:

P R

airman Date:5 )

9603290348 960322 PDR ADDCK 05000260 P

PDR

TVANuclear Fuel.

Core Operating Limit~ort TVA-'COLR-BF2C9 Revision 0; Page:2 Revision j og Revision Date 0

3/14/96

~Desert'ioo Initial Release Affected Pa es All

41 1k~'@If '

TVANuclear Fuel Core Operating L'imit~ort TVA-COLR-BF2C9 Revision,O, Page 3 1.

INTRODUCTION'his Core Operating Limits Report for Browns Ferry Unit 2, Cycle 9 is prepared in accordance with the, requirements, of Browns Ferry Technical Specification 6.9.1.7.

The core operating limits presented here were developed using 'NRC-approved methods (References 1 and 2).

Results from the reload analyses for.Browns Ferry Unit 2, Cycle 9 are documented in Reference 3.

The following core operating limits.are included in this, report:

a.

Average Planar Linear Heat Generation Rate (APLHGR) Limit (Technical Specification 3.5.'I)

b. Linear Heat'Generation Rate (LHGR) Limit (Technical Specification 3.5.Q
c. Minimum Critical Power Ratio Operating Limit(OLMCPR)

(Technical Specification 3.5.K/4.5.K) d.

Average Power Range Monitor'(APRM) Flow Biased Rod Block Trip Setting (Technical Specification 2.1..A. 1'.c, Table 3.2.C, and Specification 3.5.L) e.

Rod Block Monitor (RBM) Upscale (Flow Bias) Trip.Setting and Clipped Value (Technical Specification Table 3.2.C)

2. APLHGR LIMIT(TECHNICALSPECIFICATION 3.5.I)

The APLHGR limit for each. type of fuel as, a function of exposure is shown in

'ables 1 - 8. The APLHGR limits,for the GE9B (GE8X8NB).and the GE11 bundles,

',are for the most limiting lattice at each" exposure point. The specific values for each lattice are given in Reference 4.

0 Si x4'

TVANuclear Fuel Core Operating Limit~ort t

TVA-COLR-BF2C9 Revision 0, Page 4

3. LHGR LIMIT(TECHNICALSPECIFICATION 3.5.J)

The LHGR'limitfor unit 2 cycle 9 is fuel type dependent, as shown below:

Fuel Type

P8X8R/BP8X8R

'GE8X8NB/GE11 LHGR Limit.

13.4 kw/ft 14.4 kw/ft

4. OLMCPR,(TECHNICALSPECIFICATION 3.5.K/4.5.K) a.

The OLMCPR is equal to the:fuel type and exposure dependent MCPR limit at rated flow and rated power shown-in Figures 1 - 3 multiplied by the Kf shown in Figure 4, where; Save ZB Z = 0.0 or Z,

whichever is greater.

Zil ZB Z~. = 0.90 sec (Specification 3.3.C.1 scram time limitto 20%

insertion from fullywithdrawn )

i Zi = 0.710 + 1.65 (0.053)

N 2

n ng Zi Save

= i=1 n

where; n = Number ofsurveillance rod tests performed to date in cycle (including. BOC test).

Zi = Scram. time.to 20% insertion from fullywithdrawn ofthe i rod'

= Total number ofactive rods measured in Specification 4.3.C.l

.at BOC b.. For the performance of Surveillance Requirement 4.5.K.2.a (prior to initial scram time measurements for the. cycle),

Cl iI.

~ l~> i.V*EiVl I

,)

1

TVANuclear, Fuel Core Operating Limit~ort TVA-COLR-BF2C9 Revision 0, Page 5

c. For the performance of Surveillance Requirement 4.5.K.2.b,

'C shall be determined in accordance with 4.a above.

5.', APRM FLOW BIASED ROD BLOCKTRIP SETTING (TECHNICAL SPECIFICATION 2.1.A.I.c, TABLE3.2.C, AND SPECIFICATION 3.5.L)

The APRM Rod Block trip setting shall be:

SRB 5'(0.58W + 57%)

where:

SRB = Rod Block setting. in percent of rated thermal power (3293 MWt)

W = Loop recirculation flow rate in percent of.rated Note:

Under certain conditions, the APRM Rod Block setting must'be adjusted by FRP/CMFLPD.

See Technical Specification 3.5.L.

6. RBM UPSCALE'(FLOW BIAS) TRIP SETTING AND CLIPPED VALUE (TECHNICALSPECIFICATION TABLE'3.2.C)

Tlie RBM Upscale trip setting shall be:

5 (0.66W + 46%)

where:

Trip level setting is'in percent of rated thermal power (3293 MWt)

W = Loop recirculation flow'rate in percent of:rated RBM upscale flow-biased-setpoint clipped at 112 percent rated reactor power.

.0

(~) z 'y g'

TVANuclear Fuel Core Operating Limit~port TVA-COLR-BF2C9 Revision 0, Page.6

7. REFERENCES
1. NEDE-24011-P-A-11, "General Electric Standard Application for Reactor Fuel,"

November 1995.

2. NEDE-24011-P-A-11-US, "General Electric Standard Application.for Reactor Fuel' U.S. Supplement," November 1995.

.3. J11'-02761SRLR', Rev. 2;, "Supplemental Reload Licensing Report for Browns:

Ferry Nuclear. Plant Unit 2 Reload 8. Cycle 9,'," March 1996.

4. J11-02761MAPL, Rev. 0, "Lattice-Dependent MAPL'HGRReport for Browns Ferry Nuclear Plant Unit 2 Reload.8 Cycle 9," January 1996.

4l 38>a l ~a a A'

TVANuclear Fuel Core Operating-Limit port TVA-COLR-BF2C9 Revision 0, Page 7 Table 1

APLHGR Limits for Bundle Type GE9B-P8DWB319-9GZ (GE8X8NB)

Most LimitingLattice for Each Exposure Point

\\

Average Planar Exposure

~GWD/ST 0.00 0;20 1.00 2.00 3.00'.00 5.00 6.00 7.00 8.00 9.00 10.00 12.50 15.00 20.00 25.00 35.00 45.00 51.20 APLHGR Limit

~kw/ft 11.64 11.68 11.77 11.88 12.01 12.12 12.22 12.32 12.49 12.65 12.77 12.86 12.86 12.62 12.06 11.47 10.41 8;81 5.91

Cl

, 4l

~ 14th l N4 1

TVANuclear Fuel Core Operating L'imit ort t

TVA-COLR-BF2C9 Revision 0; 'Page 8 Table 2 APLHGR Limits for Bundle Type GE9B-P8DWB325-10GZ (GE8X8NB).

Most LimitingLattice for Each:Exposure Point Average Planar Exposure

~GWD/ST:

0.00 0.20 1.00 2.00 3.00 4.00

'5.00 6.00 7'.00 8.00 9.00 10.00 12.50 15.00 20.00 25.00'5.00 45.'00 50.27 APLHGR Limit

~kw/ft 10.97 11.00'11.11 1'1.31 11.54 11.79 11.97 12.10 12 23 12.35 12.46 12.58 12.58 12.35 11.86 11.33 10.12'.60 5.'92

0

" 1g~>

ajar AVl

~

TVANuclear Fuel

'Core Operating Limit ort t

TVA-COLR-BF2C9 Revision 0, Page 9 Table 3 APLHGR Limits for Bundle Type GE9B-P8DWB326-7GZ (GE8X8NB)

Most LimitingLattice for Each Exposure Point Average Planar Exposure

~GWD/ST 0.00 0.20 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8;00 9;00 10.00 12;50 15.00 20.00 25;00 35:00 45.00 50.49 APLHGR Limit

~kw/ft 11.45 11.47'1.55 11.70 11.87 12.01'2.13 12.22 12.31 12.41 12.51 12.63 12.64 12;41 11.91 11.35 10.15 8.72 5.93

Cl Si IS<A iA I;,'g ],

TVANuclear. Fuel Core Operating Limit ort t

TVA-COLR-BF2C9 Revision 0, Page 10 Table 4 APLHGR Limits for Bundle Type BP8DRB301L (BP8X8R)

Average Planar Exposure

~GWD/S 0."00 0.20 1'.00, 2.00 3.00 4.00

,5.00

6.00 7.00:

8.00 9.00 10.00 12.50 15.00 20.00 25.'00 35.00:

43.52 APLHGR Limit

~kw/ft 11.32 11.33 11.40 11.50 11.61 11;73 11.86 11.93 11.98 12.03 12.11

'2.19 12.34 12;47 12.58 12.'03 10.82 9.17

0, lfw<

. ~>,"~J

TVA:Nuclear Fuel Core Operating Limits~port l

TVA-COLR-BF2C9 Revision 0, Page 11 Table 5 APLHGR Limits for Bundle Type BPSDRB299 (BP8X8R)

Average Planar Exposure

~GWD/ST 0.00 0.20 1.00 2.00 3.00 4.00 5.00 6.00 7.00/

8.00 9.00 10;00 12.50 15.00'0.00 25.00 35.00

42. 13 APLHGR 'Limit

~kw/ff 10.71 10.75 10.86 11.01 11.19 11.35 11.47 11.62 11'.78 11.95 12.09 12.20 12.37 12.47 12.37 11.77 10.65 9.36

,II rr>i '~~,:/, I

TVANuclear Fuel Core Operating Limit ort t

TVA-COLR-BF2C9

.Revision 0, Page 12 Table 6 APLHGR Limits for Bundle Type PSDRB284L (P8X8R)

Average Planar Exposure

~GWD/ST 0.20

~

1.00 5.00 10.00 15.00 20.00'5.00 30.00 35.00 40.00 45.00 APLHGR Limit

~kw/ft 11.20 11.30 11.80 12.00 12.'00 11.80 11.20 10.80 10.20 9.50 8.80

0

. Oi 1l',,~i r~.yg $

TVANuclear Fuel Core Operating Limit ort t

TVA-COLR-BF2C9 Revision 0, Page 13 Table 7 APLHGR Limits for Bundle Type GE11-P9HUB366-12G4.0 (GE11)

Most LimitingLattice for Each Exposure Point Average Planar Exposure

~GWD/ST 0.00 0.20 1.00 2.00 3.00 4.00 5.00 6.00 7.00

.8.00 9.00 10.00 12.50 15.00 17.50 20.00 25.00 30;00 35.00 40.00 45.00 50.00 55.00 56.17 APLHGR Limit

~kw/ft 9.55 9.62 9.80 10.05 10.32 10.58 10.84 11.11 11.39 11.67 11.81 11.95 11.92

,11.72 11.48 11.20 10.51 9.84 9.19 8.55 7.91 7.26 6.59 6.42

0 II ICtk y/a 4%/.l

TVANuclear Fuel Core Operating Limit ort TVA'-'COLR-BF2C9 Revision 0, Page 14 Table 8 APLHGR Limits for Bundle Type GE11-P9HUB367-14GZ (GE11)

Most LimitingL'attice for Each Exposure Point Average Planar Exposure

~GWD/ST 0.00 0.20 1.00 2.00 3'.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 12;50 15.00 17;50 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.'00 56.17 APLHGR Limit

~kw/ft 9;18 9.27 9.45 9.72'0;00 10.30 10.62 10.95 11.31 11.67 11.81 11.95 11.92 11.72 11.48 11;20 10.51 9.84 9.19 8.55 7.91 7.26 6.59 6.42

ll.>II

~a

~ ~ / I

TVANuclear Fuel Core Operating Limit~ort t

TVA-COLR-BF2C9 Revision 0, Page 15 Figure 1

MCPR Operating Limitfor P8XSR/BP8X8R 1.34 1.31 g

1.29 1.28 1.27 1.26 BOC9 to EOC9 1.25 1.24 0.0 0.1 Option B 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Option A Kx osure Ran e

BOC9 to EOC9 0 tion"A Tau=1.0, 1';29

  • 0 tion B Tau=o.o 1.25

": Use.this value. at,BOC9 prior to performing scram. time testing.

4i If'i wg

.'-/ J,

TVANuclear. Fuel Core Operating Limit ort t

TVA-COLR-BF2C9 Revision 0, Page 16 Figure 2 MCPR Operating Limitfor GESXSNB 1.33 t

1.32 1.31 1.30 1.29 1.28 to EQC9 1.27 1.26 1.25 1.24 '.0 0.1 Option B 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Option A Ex osure Ran e

BOC9 to EOC9 0 tion A Tau=1.0 1.31 4'

tion 8 Tau=o.o 1.28

": Use this value at'BOC9:prior to performing scram time testing.

4>

tf e~ ~<<P f

~ 5

TVA'Nuclear Fuel Core Operating Limi ort t

TVA-COLR-BF2C9 Revision 0, Page 17 Figure 3 MCPR Operating Limitfor GE11

-I 1.32 1.31 BOC9 to EOC9 1.30 m

Q 1.29,

1.28 J

1.27 1.26 1.25 1,24, 0.0, 0.1 Option B 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Ogon A BOC9 to EOC9:

0 tion A Tan=1.0 1.33

  • 0 tion.B Tau=0.0 1.30
  • Use this value at BOC9 prior to performing scram, time testing.

0 4i ff" h

I z /f

~

~

TVANuclear Fuel Core Operating Limit~ort t

TVA-COLR-BF2C9 Revision 0, Page 18 (Final) 1.4 Figure 4 GEXL-Plus Kf Curve OLMCPR Flow Corrections 1.3'17.0%

112.0%

107.0%

102.5 %

1.020 30 40 50 60 70 80 90 100 Total Core Flow (% rated)

For 40% ( WT ( 100%,

Kf = MAX[1.0, A-0.00441*WT]

WT ( 40%,

Kf = [A - 0.00441+WT] + [1.0 + 0.0032+(40- WT)]

WT ) '100%,

Kf =

1.0 where

WT = Percent of Rated Core Flow, and A = constant which depends on the Flow Control Mode and the Scoop Tube Setpoint as noted below.

Flow Control Mode Scop Tube Set oint A

MANUAL 102.5 %

1.3308 MANUAL 107.0 %

MANUAL 112.0 %

1.3528 1.3793 MANUAL 117.0'%.4035 AUTOMATIC N/A 1.4410 Note:

Flow Corrections are given for P8X8R, BP8X8R, and GE8X8NB bundles.

These corrections are conservative when compared to GE11 flow corrections which do not have the additional correction factor. of [1.0+ 0.0032*(40- WT)] below40% flow.