|
---|
Category:Letter
MONTHYEARML24318C2732024-11-13013 November 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i) and (II) for Use of Nuclear Decommissioning Trust Funds for Disposal of Major Radioactive Components During Operations ML24316A0032024-11-11011 November 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 – One Cycle Justification ML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24128A2472024-05-0808 May 2024 Project Manager Assignment IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20243012024-02-27027 February 2024 NRC Initial Operator Licensing Examination Approval 05000313/2024301 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 – Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23324A0172023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000368/20213012021-05-17017 May 2021 NRC Examination Report 05000368/2021301 IR 05000313/20183012018-04-0404 April 2018 NRC Examination Report 05000313/2018301 IR 05000368/20173012017-03-22022 March 2017 NRC Examination Report 05000368/2017301 ML16011A1792016-01-11011 January 2016 Notification of NRC Initial Operator Licensing Examination 05000313/2016301 IR 05000368/20153012015-09-24024 September 2015 Er 05000368/2015301; 08/24/2015 - 09/15/2015; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000368/20143022014-09-0404 September 2014 Er 050003682014302; on 07/30/2014 - 08/21/2014; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Retake Examination Report IR 05000368/20143012014-04-17017 April 2014 Er 05000368-14-301, on February 10 - March 19, 2014, Arkansas Nuclear One, Unit 2, Initial Operator Licensing Examination Report IR 05000313/20133012013-03-29029 March 2013 Er 05000313-13-301; February 22 - March 18, 2013; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report ML12054A1172012-02-23023 February 2012 Notification of NRC Initial Operator Licensing Examination 05000368/12-301 IR 05000313/20113022011-10-26026 October 2011 Er 05000313-11-302; August 26 to September 19, 2011; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report IR 05000368/20113012011-03-17017 March 2011 Er 05000368-11-301 on 01/28/2011 - 02/17/2011, Arkansas Nuclear One, Unit 2 IR 05000313/20103012010-04-12012 April 2010 Er 05000313-10-301, on 03/08/2010 to 3/16/2010, Arkansas Nuclear One, Unit 1, Initial Operator Licensing Examination Report IR 05000368/20093022009-10-0505 October 2009 Er 05000368-09-302; on 08/07/2009, Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000313/20093012009-02-20020 February 2009 Er 50-313/09-301, 50-368/09-301 on 01/26/09 - 02/03/09 for Arkansas Nuclear One, Unit 1 ML0828001112008-10-0606 October 2008 2008 -09 - Examination Report ML0824801592008-09-0303 September 2008 Er 05000313-08-301, on 09/08/2008, Arkansas Nuclear One, Unit 1 - NRC Initial Operator Licensing Examination Approval IR 05000368/20083012008-03-14014 March 2008 Er 05000368-08-301, on February 25-28, 2008; Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination Report IR 05000313/20073012007-04-25025 April 2007 Er 05000313-07-301, on 03/5-8/2007, Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000313/20043012004-02-0909 February 2004 Er 05000313-04-301 on 01/12/2004 - 01/15/2004; Arkansas Nuclear One, Unit 1, Initial Operator Licensing Examination IR 05000368/20033012003-08-27027 August 2003 Er 05000368-03-301, on 07/11/03 - 07/18/03; Entergy Operations, Inc., Arkansas Nuclear One, Unit 2; Initial Operator Licensing Examination IR 05000368/20023012002-03-0505 March 2002 IR 05000368/2002-301, on 2/11-15/2002, Entergy Operations, Inc., Arkansas Nuclear One, Unit 2, Initial Examination of Applicants for Operator Licenses. Fifteen of Sixteen Applicants Satisfied the Requirements of 10 CFR Part 55 2021-05-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 March 17, 2011 Christopher J. Schwarz, Site Vice President Arkansas Nuclear One Entergy Operations, Inc. 1448 SR 333 Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 -NRC EXAMINATION REPORT 05000368/2011301
Dear Mr. Schwarz:
On February 3,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Arkansas Nuclear One, Unit 2. The enclosed report documents the examination findings and iicensing decisions.
The preliminary examination findings were discussed on February 3, 2011, with Ms. Sherrie Cotton, Training Manager, and other members of your staff. A telephonic exit meeting was conducted on February 17, 2011, with Mr. Randall Martin, Training Superintendant, who was provided the NRC licensing decisions.
The examination included the evaluation of five applicants for reactor operator licenses, one applicant for instant senior reactor operator license and five applicants for upgrade senior reactor operator licenses.
The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report. No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room).
Sincerely,Mark S. Haire, Chief Operations Branch Division of Reactor Safety Operations, Docket: 50-368 License: NPF-6
Enclosure:
NRC Examination Report 05000368/2011301 Distribution via ListServ for ANa -2 -
Docket: License: Report: Licensee:
Facility:
Location:
Dates: Inspectors:
Approved By: REGULATORY COMMISSION REGION 50-368 NPF-6 05000368/2011301 Entergy Operations, Inc. Arkansas Nuclear One, Unit 2 Junction of Hwy. 64Wand Hwy. 333 South Russellville, Arkansas January 28 -February 17, 2011 G. Apger, Operations Engineer B. Larson, Senior Operations Engineer S. Steely, Operations Engineer Mark S. Haire, Chief Operations Branch Division of Reactor Safety 1 Enclosure SUMMARY OF FiNDiNGS ER05000368!2011301; January 28 -February 17, 2011; Arkansas Nuclear One, Unit Initia! Operator Licensing Examination Report. NRC examiners evaluated the competency of five applicants for reactor operator licenses, one applicant for instant senior reactor operator license and five applicants for upgrade senior reactor operator licenses at Arkansas Nuclear One, Unit 2. The licensee developed the examinations using NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on January 28, 2011. NRC examiners administered the operating tests on January 31 -February 3, 2011. The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. A. NRC-Identified and Self-Revealing Findings No findings were identified.
B. Licensee-Identified Violations None. 2 Enclosure REPORT DETAiLS (OA) 40A5 Other Activities (Initial Operator License Examination)
.1 License Applications
.2 a. Scope b. a. NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements.
The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications.
This audit focused on the applicant's experience and job training, including control manipulations that provided significant reactivity changes. Findings No findings were identified.
Examination Development Scope NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1 021. The NRC examination team conducted an onsite validation of the operating tests. b. Findings NRC examiners provided outline, draft examination and post-validation comments to the licensee.
The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined that the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination . . 3 Operator Knowledge and Performance a. Scope On January 28, 2011, the licensee proctored the administration of the written examinations to all eleven applicants.
The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on February 7, 2011. The NRC examination team administered the various portions of the operating tests to all eleven applicants on January 31 -February 3, 2011. 3 Enclosure b. findings \tvere identified.
All of the applicants passed the written examination and all parts of the operating test. The final written examinations, final operating test and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment.
At the request of the facility licensee, public release of the final written examination will be delayed for two years. There were no post-examination comments as indicated in the licensee submittal.
.4 Simulation Facility Performance
.5 a. Scope b. a. The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
Findings No findings were identified.
Examination Security Scope The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021.
Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings No findings were identified.
The licensee identified possible exam security issues with respect to installed cameras in certain areas of the plant and initiated Condition Report CR-ANO-C-02836.
The chief examiner was notified prior to any in-plant job performance measure development or validation activities.
The licensee developed an interim guidance document that ensured cameras would not compromise in-plant examination activities for this examination, and a Condition Report was initiated for Entergy to develop a fleet-wide procedure to address this issue. The licensee also evaluated whether or not compromises could have occurred at both units during the last two years of examination activities, including requalification.
No compromises were identified.
4 Enclosure 40A6 The chief examiner presented the preliminary'
examination results to Ms. Sherrie Cotton, Training Manager, Mr. Charles O'Dell, Assistant Operations Manager, and other members of the staff on February 3, 2011. A telephonic exit was conducted on February 17, 2011, between Messrs. Gabriel Apger, Chief Examiner, and Randall Martin, Training Superintendant.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION 5 Enclosure KEY Licensee Personnel C. Simpson, Training Superintendant S. Coffman, Licensing NRC Personnel A. Sanchez, Senior Resident Inspector OF ADAMS DOCUMENTS REFERENCED Accession No. ML 110740405
-FINAL WRITTEN EXAMS (Will be released to the public on January 25, 2013) Accession No. ML110740414
-FINAL OPERATING TEST Accession No. ML 110740415
-POST EXAM ANALYSIS 1 Attachment