05000336/LER-1997-014, Forwards LER 97-014-00 Which Documents an Event That Occurred on 970415.Commitments Made within Ltr,Submitted | Forwards LER 97-014-00 Which Documents an Event That Occurred on 970415.Commitments Made within Ltr,Submitted | |
05000336/LER-1997-015, Forwards LER 97-015-00 Per 10CFR50.73(a)(2)(v).Also Includes Commitments Made in Ltr | Forwards LER 97-015-00 Per 10CFR50.73(a)(2)(v).Also Includes Commitments Made in Ltr | |
05000336/LER-1997-016, Forwards LER 97-016-00 Per 10CFR50.73(a)(2)(i)(B).Also Includes Commitments Made in Ltr | Forwards LER 97-016-00 Per 10CFR50.73(a)(2)(i)(B).Also Includes Commitments Made in Ltr | |
05000336/LER-1997-017, Forwards LER 97-017-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970417.Commitment Made within Ltr,Listed | Forwards LER 97-017-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970417.Commitment Made within Ltr,Listed | |
05000336/LER-1997-018, Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted | Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted | |
05000336/LER-1997-019, Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed | Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed | |
05000336/LER-1997-020, Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1 | Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1 | |
05000336/LER-1997-021, Forwards LER 97-021-00,documenting an Event That Occurred on 970423,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr, Submitted | Forwards LER 97-021-00,documenting an Event That Occurred on 970423,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr, Submitted | |
05000336/LER-1997-022, Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachment | Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachment 1 | |
05000336/LER-1997-023, Updates NRC Staff Re Submittal of Suppl to LER 97-023-00 as Committed to by Facility for Unit 2 in LER 97-023-00.LER 50-336/97-023-00 Contained Listed Commitment for Unit 2 | Updates NRC Staff Re Submittal of Suppl to LER 97-023-00 as Committed to by Facility for Unit 2 in LER 97-023-00.LER 50-336/97-023-00 Contained Listed Commitment for Unit 2 | |
05000336/LER-1997-024, Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl | Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl | |
05000336/LER-1997-025, Forwards LER 97-025-00 Which Documents Event That Occurred at Mnps,Unit 2 on 910828.Submittal Delayed Due to Inadequate Review of Event at Time of Discovery.Commitments Made by Util,Listed | Forwards LER 97-025-00 Which Documents Event That Occurred at Mnps,Unit 2 on 910828.Submittal Delayed Due to Inadequate Review of Event at Time of Discovery.Commitments Made by Util,Listed | |
05000336/LER-1997-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed | Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed | |
05000336/LER-1997-027, Forwards LER 97-027-00,documenting Event That Occurred at Unit 2 on 970802.Commitment,listed | Forwards LER 97-027-00,documenting Event That Occurred at Unit 2 on 970802.Commitment,listed | |
05000336/LER-1997-028, Forwards LER 97-028-00,documenting Condition Discovered at Plant on 970822.List of Commitments Provided | Forwards LER 97-028-00,documenting Condition Discovered at Plant on 970822.List of Commitments Provided | |
05000336/LER-1997-029, Forwards LER 97-029-00,documenting Condition That Was Identified at Plant Unit 2 on 970826.Commitment Made within Ltr,Listed | Forwards LER 97-029-00,documenting Condition That Was Identified at Plant Unit 2 on 970826.Commitment Made within Ltr,Listed | |
05000336/LER-1997-030, Forwards LER 97-030-00,documenting Event That Occurred at Unit 2 on 970830.Util Commitments Listed in Ltr | Forwards LER 97-030-00,documenting Event That Occurred at Unit 2 on 970830.Util Commitments Listed in Ltr | |
05000336/LER-1997-031, Forwards LER 97-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970918.Commitments Made within Ltr Listed | Forwards LER 97-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970918.Commitments Made within Ltr Listed | |
05000336/LER-1997-032, Forwards LER 97-032-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970922.Commitment Made within Ltr,Listed | Forwards LER 97-032-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970922.Commitment Made within Ltr,Listed | |
05000336/LER-1997-033, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) | Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) | |
05000336/LER-1997-034, Forwards LER 97-034-00 Which Documents Condition That Was Identified at Mnps,Units 2 on 971029.Commitments Made within Ltr Listed | Forwards LER 97-034-00 Which Documents Condition That Was Identified at Mnps,Units 2 on 971029.Commitments Made within Ltr Listed | |
05000336/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred at Millstone,Unit 2 on 971111.Listed Commitments Made within Ltr | Forwards LER 97-035-00,documenting Event That Occurred at Millstone,Unit 2 on 971111.Listed Commitments Made within Ltr | |
05000336/LER-1997-036, Forwards LER 97-036-00,which Describes Event That Occurred at Facility on 971117.Commitments Made within Ltr Listed | Forwards LER 97-036-00,which Describes Event That Occurred at Facility on 971117.Commitments Made within Ltr Listed | |
05000336/LER-1997-037, Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl | Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl | |
05000423/LER-1997-001, Submits Commitments Re LER 97-001-00,documenting Condition Determined at Plant on 970104 | Submits Commitments Re LER 97-001-00,documenting Condition Determined at Plant on 970104 | |
05000423/LER-1997-002, Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr | Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr | |
05000423/LER-1997-003, Forwards LER 97-003-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970113,per 10CFR50.73(a)(2)(ii) (B).List of Commitments,Encl | Forwards LER 97-003-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970113,per 10CFR50.73(a)(2)(ii) (B).List of Commitments,Encl | |
05000423/LER-1997-004, Forwards LER 97-004-00 Documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 3 on 970114.Util Commitments Made within Ltr,Listed | Forwards LER 97-004-00 Documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 3 on 970114.Util Commitments Made within Ltr,Listed | |
05000423/LER-1997-005, Corrects Numbering Inconsistency in Commitments Addressing LER 97-005-00 | Corrects Numbering Inconsistency in Commitments Addressing LER 97-005-00 | |
05000423/LER-1997-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1 | Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1 | |
05000423/LER-1997-007, Forwards LER 97-007-00,documenting Condition That Was Determined at Millstone Nuclear Power Station,Unit 3 on 970123.Commitments Made within Ltr,Listed | Forwards LER 97-007-00,documenting Condition That Was Determined at Millstone Nuclear Power Station,Unit 3 on 970123.Commitments Made within Ltr,Listed | |
05000423/LER-1997-009, Forwards Suppl 01 to LER 97-009-00,documenting Addl Conditions to Those Determined Reportable at Millstone Unit 3 on 970123.Commitments Made within Ltr Are Listed in LER 97-009-01.W/o Encl | Forwards Suppl 01 to LER 97-009-00,documenting Addl Conditions to Those Determined Reportable at Millstone Unit 3 on 970123.Commitments Made within Ltr Are Listed in LER 97-009-01.W/o Encl | |
05000423/LER-1997-010, Forwards LER 97-010-00,documenting Condition Determined at Millstone Unit 3 on 970129 Per 10CFR50.73(a)(2)(v). Commitments Attached | Forwards LER 97-010-00,documenting Condition Determined at Millstone Unit 3 on 970129 Per 10CFR50.73(a)(2)(v). Commitments Attached | |
05000423/LER-1997-011, Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions | Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions | |
05000423/LER-1997-012, Forwards Revised Commitments Re Expansion Joint Tie Rod Assemblies,Previously Submitted to NRC in LER 97-012-00 | Forwards Revised Commitments Re Expansion Joint Tie Rod Assemblies,Previously Submitted to NRC in LER 97-012-00 | |
05000423/LER-1997-013, Provides Revised Schedule for Submittal of LARs Identified in LER 97-013-00, Failure to Meet General Design Criteria 57 for Ms Supply Containment Isolation Valves to AFW Pump Turbine. LAR Will Be Submitted by 970630 | Provides Revised Schedule for Submittal of LARs Identified in LER 97-013-00, Failure to Meet General Design Criteria 57 for Ms Supply Containment Isolation Valves to AFW Pump Turbine. LAR Will Be Submitted by 970630 | |
05000423/LER-1997-014, Forwards LER 97-014-00,documenting Condition Determined at Millstone Unit 3 on 970203.Util Commitments Attached | Forwards LER 97-014-00,documenting Condition Determined at Millstone Unit 3 on 970203.Util Commitments Attached | |
05000423/LER-1997-015, Forwards LER 97-015-00,documenting Condition Determined at Millstone Unit 3 on 970204 Per 10CFR50.73(a)(2)(ii)(B).Utils Commitments Attached | Forwards LER 97-015-00,documenting Condition Determined at Millstone Unit 3 on 970204 Per 10CFR50.73(a)(2)(ii)(B).Utils Commitments Attached | |
05000423/LER-1997-016, Provides List of Commitments Re LER 97-016-00 Per 10CFR50.73(a)(2)(ii)(B) | Provides List of Commitments Re LER 97-016-00 Per 10CFR50.73(a)(2)(ii)(B) | |
05000423/LER-1997-017, Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr | Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr | |
05000423/LER-1997-018, Forwards LER 97-018-00,documenting Condition Determined at Millstone Unit 3 on 970208.Util Commitments Attached | Forwards LER 97-018-00,documenting Condition Determined at Millstone Unit 3 on 970208.Util Commitments Attached | |
05000423/LER-1997-019, Provides Revised Completion Date for Commitment Submitted in LER 97-019-00 Re Failure to Account for Instrument Uncertainty in DWST Level.Commitment Made by Util,Encl | Provides Revised Completion Date for Commitment Submitted in LER 97-019-00 Re Failure to Account for Instrument Uncertainty in DWST Level.Commitment Made by Util,Encl | |
05000423/LER-1997-020, Forwards Revised Schedule for Reconfiguring CCW Side of Containment Air Recirculation Sys to Provide Required Flowrates When Supplied by Reactor Plant Chilled Water Sys or Reactor Plant Ccws,Identified in LER 97-020-00 | Forwards Revised Schedule for Reconfiguring CCW Side of Containment Air Recirculation Sys to Provide Required Flowrates When Supplied by Reactor Plant Chilled Water Sys or Reactor Plant Ccws,Identified in LER 97-020-00 | |
05000423/LER-1997-021, Provides Clarification of Actions Taken in Completing Commitment Previously Submitted in LER 97-021-00, Defective Design of RSS Expansion Joint Tie Rod Assembly | Provides Clarification of Actions Taken in Completing Commitment Previously Submitted in LER 97-021-00, Defective Design of RSS Expansion Joint Tie Rod Assembly | |
05000423/LER-1997-022, Forwards LER 97-022-00,documenting Conditions That Occurred at Millstone Nuclear Power Station,Unit 3 on 970218.Util Commitments Made within Ltr,Listed | Forwards LER 97-022-00,documenting Conditions That Occurred at Millstone Nuclear Power Station,Unit 3 on 970218.Util Commitments Made within Ltr,Listed | |
05000423/LER-1997-023, Forwards LER 97-023-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970320,per 10CFR50.73(a)(2)(i) | Forwards LER 97-023-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970320,per 10CFR50.73(a)(2)(i) | |
05000423/LER-1997-024, Revises Schedule for Commitment Made in LER 97-024-00, Engineeered Safeguards Bldg Monitor Noble Gas Activity Monitor Sensitivity Not Meeting TS Requirements | Revises Schedule for Commitment Made in LER 97-024-00, Engineeered Safeguards Bldg Monitor Noble Gas Activity Monitor Sensitivity Not Meeting TS Requirements | |
05000423/LER-1997-026, Forwards LER 97-026-00,documenting Condition That Occurred on 970325.Util Commitments in Response to Event Contained within Attachment 1 | Forwards LER 97-026-00,documenting Condition That Occurred on 970325.Util Commitments in Response to Event Contained within Attachment 1 | |
05000423/LER-1997-027, Provides Revised Completion Date for Commitment Submitted within LER 97-027-00 Re Corrective Action Not Met for Trending Valve Leakage.Revised Completion Date Is 970501 | Provides Revised Completion Date for Commitment Submitted within LER 97-027-00 Re Corrective Action Not Met for Trending Valve Leakage.Revised Completion Date Is 970501 | |
05000423/LER-1997-028, Forwards LER 97-028-00 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 of Ltr | Forwards LER 97-028-00 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 of Ltr | |