Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18092B498 | 28 February 1986 | Number 1,Generator Operating Guide. | |
ML18092B499 | 20 March 1987 | Artificial Island Stability Limitation Operating Restrictions. | High winds |
ML18130A403 | 16 December 1981 | Nuclear Environ Qualification of Module Case & Electric & Electronic Components of Pc Boards & Plug-In Modules of Remote Multiplexer Units,Models MC170AD-Q2 & MC370AD-Q2 for Validyne Engineering Corp. | |
ML18139B838 | 8 April 1982 | Emergency Operations Facility. | |
ML18141A045 | 18 May 1983 | Administrative Procedure Adm 98, Emergency Usage Procedures Writers Guide. | Boric Acid Health Physics Network Post Accident Monitoring Design basis earthquake Earthquake |
ML18141A530 | 1 March 1984 | Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 | Backfit |
ML18142A092 | 31 October 1982 | Rev B to Nuclear Environ Qualification of Remote Multiplexer Unit Models MC170AD-Q2 & MC370AD-Q2 & Associated Pc Boards & Plug-In Modules. | |
ML18142A093 | 2 October 1981 | Rev 0 to Procedure 466, Insp Record Checklist. | |
ML18142A094 | 19 November 1980 | Rev 4 to Procedure 9833, Design Spec for HD310 High Speed Data Acquisition Sys. | |
ML18142A095 | 8 December 1981 | Rev 13 to Procedure 9834, Qualification Spec for Remote Multiplexer Units & Associated Signal Conditioner Modules. | Safe Shutdown Earthquake Earthquake |
ML18142A096 | 5 November 1984 | Procedure 466, Remote Multiplexer Integrated Functional Test Procedure. | Safe Shutdown |
ML18142A097 | 15 January 1981 | Rev B to Acceptance Test Procedure ATP442 MC170AD-Q2 (Less Plug-In Cards). | |
ML18142A098 | 29 October 1981 | Rev a to Acceptance Test Procedure ATP464, MC370AD-Q2 (Less Plug-In Cards). | |
ML18142A099 | 10 December 1980 | Acceptance Test Procedure ATP445, AB295-Q2 Analog Board Assembly. | |
ML18142A100 | 15 January 1981 | Rev a to Acceptance Test Procedure Atp 447, AD296-Q2-1,-2 Digital Pcba. | Reverse polarity |
ML18142A101 | 26 February 1981 | Rev a to Acceptance Test Procedure Atp 451, PS294-Q2. | |
ML18142A102 | 28 May 1981 | Rev a to Acceptance Test Procedure ATP454, PS171-Q2 Power Supply for MC170. | |
ML18142A103 | 26 March 1981 | Rev a to Acceptance Test Procedure ATP440, CM249-Q2 Carrier Modulator. | |
ML18142A106 | 28 May 1981 | Rev a to Acceptance Test Procedure ATP450, BA332-Q2 Buffer Amplifier. | |
ML18142A107 | 30 June 1981 | Rev C to Acceptance Test Procedure Atp 452, DI325-Q2 Digital Encoder,Four Input. | |
ML18142A108 | 14 April 1981 | Rev a to Acceptance Test Procedure ATP444-1, PT174-1-Q2 Thermometer Signal Conditioner. | |
ML18142A109 | 13 April 1981 | Rev B to Acceptance Test Procedure ATP444-2, PT174-2-Q2 Resistance Thermometer Signal Conditioner. | |
ML18142A110 | 13 April 1981 | Acceptance Test Procedure Atp 453, TC292-Q2 Thermocouple Conditioner. | |
ML18142A111 | 28 May 1981 | Rev a to Acceptance Test Procedure ATP449, PC202-Q2 Buffer Amplifier. | |
ML18142A112 | 17 April 1981 | Rev B to Acceptance Test Procedure ATP443, CD173-Q2 High-Gain Carrier Demodulator. | |
ML18142A113 | 9 April 1981 | Acceptance Test Procedure ATP446, JC177-Q2 Jumper Card. | |
ML18142A114 | 21 April 1983 | Qualification Test Rept QTR 82-003, Surge Withstand Capability Tests,MC170AD-Q2 & MC370AD-Q2. | |
ML18142A136 | 4 November 1983 | Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask,Loading & Handling Procedures. | |
ML18142A137 | 15 September 1983 | Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures. | |
ML18152A875 | 17 March 1988 | Proposed Changes to Tech Specs Section 6,replacing Organization Charts W/General Description of Organizational Requirements & Certain Corporate Level Position Titles W/ General Position Decriptions | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML18153B837 | 24 July 1989 | Proposed Tech Specs Reflecting Composition of Station Nuclear Safety & Operating Committee Following Recent Assignment of superintendent-engineering Position at Stations.Tech Spec Pages Include 6.1-6,6-5 & 6-6 | |
ML19249E412 | 25 September 1979 | Draft of Revised Reactor Trip Procedure | |
ML19256E804 | 8 November 1979 | Steam Generator Insp Plan for Upcoming Nov 1979 Refueling Outage | |
ML19256F651 | 10 October 1979 | Shop Insp Procedure for Air Lock Doors,Revision 0 | Liquid penetrant |
ML19257A911 | 3 January 1980 | Reactor Containment Bldg Integrated Leak Rate Test. | |
ML19305D310 | 6 July 1978 | Qualification Test Rept on Three Model 386A Differential Pressure Transmitters & Remote Sensors, Vol 1,Revision B | Coatings |
ML19305D313 | 6 July 1978 | Qualification Test Rept on Three Model 386A Differential Pressure Transmitters & Remote Sensors, Vol 2,Revision C | |
ML19308A750 | 4 June 1976 | Proposed Tech Specs for Compliance w/10CFR50,App 1. | Grab sample |
ML19308B015 | 30 November 1976 | Proposed Tech Spec 4.4 Re Limitations of Containment Integrated Leakage Rate & Containment Leakage Tests | Local Leak Rate Testing |
ML19308B036 | 30 November 1976 | Proposed Tech Specs 4.17 & 6.6 Re Inservice Insp of once-through Steam Generators | Shutdown Margin Stress corrosion cracking Fuel cladding |
ML19308D627 | 28 June 1978 | Tech Spec Change Request Re Paragraph 2.B(6),stipulating That Byproduct & SNM Associated W/Four Fuel Assemblies Acquired by Fl Power Corp from Duke Power Co Previously Irradiated in Oconee 1 May Be Possessed | |
ML19312B777 | 9 November 1977 | Proposed Tech Spec 3.5.2 Permitting Operation of Unit 1 During Cycle 4 in Unrodded Mode | Shutdown Margin |
ML19312B789 | 3 January 1978 | Proposed Tech Spec 2.3-9 & 10 Re Computer Software Used to Process Incore Detector Signal.Includes Modified power-imbalance Trip Setpoints to Account for Bias in Positive Imbalance Measured by Incore Detector Sys | |
ML19312B793 | 17 July 1978 | Proposed Tech Spec 3.1.6.4,changing Steam Generator Leak Rate Limit | |
ML19312B797 | 27 April 1978 | Proposed Tech Spec 6.4,incorporating Operating Procedure Requirements Re B&W Small Break ECCS Analysis | Earthquake Fire Protection Program |
ML19312B800 | 2 December 1977 | Proposed Tech Spec 6.6.2.1 Providing Requirement for Prompt Written Notification of Certain ROs by Telephone,Mailgram or Facsimile Transmission | Shutdown Margin Fuel cladding |
ML19312B806 | 31 October 1977 | Proposed Tech Specs 6.6-1,-2,-3 & -4 Deleting Redundant Info Currently Being Reported in Annual Operating Rept | |
ML19312B809 | 20 April 1978 | Proposed Tech Spec 3.3 Incorporating New Tech Spec 3.3.8 Requiring Operability of Three HPI Pumps for Each Unit During Power Operation Above 60% Full Power | |
ML19312B810 | 26 October 1977 | Proposed Tech Specs 3.5-9 & 3.5-24a,deleting Existing Reactor Core Quadrant Power Tilt & Control Rod Position Limits & Instituting More Conservative Limits | Shutdown Margin |
ML19312B815 | 7 October 1977 | Proposed Changes to Tech Specs 3.7 & 4.6 Re Auxiliary Electrical Systems & Emergency Power Periodic Testing | Safe Shutdown |