Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-86-176, Responds to FOIA Request for Structural Integrity Test Repts for Four Plants.Forwards App Documents.Documents Also Available in Pdr.Nrc Unable to Locate Test Repts for Limerick or Nine Mile Point21 May 1986Responds to FOIA Request for Structural Integrity Test Repts for Four Plants.Forwards App Documents.Documents Also Available in Pdr.Nrc Unable to Locate Test Repts for Limerick or Nine Mile Point
IA-86-254, Final Response to FOIA Request for Encl 1 of NRC Re Metalweld,Inc Work Allegations & Addl Info Since 851118 Request.Forwards App D Documents.App D Documents Partially & Completely Withheld (Ref FOIA Exemption 7).Info in PDR29 July 1986Final Response to FOIA Request for Encl 1 of NRC Re Metalweld,Inc Work Allegations & Addl Info Since 851118 Request.Forwards App D Documents.App D Documents Partially & Completely Withheld (Ref FOIA Exemption 7).Info in PDR
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR27 June 1986Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDRNondestructive Examination
IA-86-324, Responds to FOIA Request for Testimony Prepared by NRC or Consultants Re Effect of 860131 Earthquake on Plant for Presentation at Aslab 860512 Hearing.App Documents Withheld (Ref FOIA Exemption 5)27 May 1986Responds to FOIA Request for Testimony Prepared by NRC or Consultants Re Effect of 860131 Earthquake on Plant for Presentation at Aslab 860512 Hearing.App Documents Withheld (Ref FOIA Exemption 5)Earthquake
IA-86-348, Responds to FOIA Request for All Documents Re 860418 & 30 Meetings W/Nrc,Util & USGS Concerning 860131 Earthquake Near Plant & Area Geology & Seismicity.App Document Available in PDR30 May 1986Responds to FOIA Request for All Documents Re 860418 & 30 Meetings W/Nrc,Util & USGS Concerning 860131 Earthquake Near Plant & Area Geology & Seismicity.App Document Available in PDREarthquake
IA-86-548, Responds to FOIA Request for Three Categories of Documents Re Deaths Resulting from Accidents at Chernobyl,Davis-Besse & Perry.Forwards App Documents.Documents Also Available in PDR6 October 1986Responds to FOIA Request for Three Categories of Documents Re Deaths Resulting from Accidents at Chernobyl,Davis-Besse & Perry.Forwards App Documents.Documents Also Available in PDRChernobyl
IA-86-630, Final Response to FOIA Request for Low Level Radiation Health Effects:Study for Haddam Neck & Millstone..., Dtd Jul 1981.App Document Available in Pdr.W/O Notice Re Procedures for Obtaining PDR Records25 August 1986Final Response to FOIA Request for Low Level Radiation Health Effects:Study for Haddam Neck & Millstone..., Dtd Jul 1981.App Document Available in Pdr.W/O Notice Re Procedures for Obtaining PDR Records
IA-86-666, Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions17 August 1982Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions
IA-86-699, Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR3 December 1986Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR
IA-86-827, Final Response to FOIA Request for Documents.App a Documents Consisting of La Crosse & Big Rock Point Semiannual Effluent Repts & App B Documents Consisting of Encl Turkey Point & St Lucie SALP Repts Available in Pdr.W/O Stated Encls16 December 1986Final Response to FOIA Request for Documents.App a Documents Consisting of La Crosse & Big Rock Point Semiannual Effluent Repts & App B Documents Consisting of Encl Turkey Point & St Lucie SALP Repts Available in Pdr.W/O Stated EnclsSafe Shutdown
Fitness for Duty
High Radiation Area
Fire Barrier
Temporary Modification
Locked High Radiation Area
Missed surveillance
Systematic Assessment of Licensee Performance
Operability Determination
Exemption Request
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Hourly Fire Watch
Substantial potential for overexposure
Overexposure
IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR18 May 1987Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR
IA-87-299, Ack Receipt of Util Describing Program for Training & Qualifying Individuals for Dual Role Senior Reactor Operator/Shift Technical Advisor Positions.Future Personnel in Dual Positions Should Meet Listed Criteria22 April 1987Ack Receipt of Util Describing Program for Training & Qualifying Individuals for Dual Role Senior Reactor Operator/Shift Technical Advisor Positions.Future Personnel in Dual Positions Should Meet Listed Criteria
IA-87-368, Marked-up Ltr Re Allegations at Plant by Individual Expressing Concern About Health Physics Practices in Containment Bldg Per 861204 Telcon W/H Kerch of Region I. Investigation to Be Conducted Re Program Problems10 December 1986Marked-up Ltr Re Allegations at Plant by Individual Expressing Concern About Health Physics Practices in Containment Bldg Per 861204 Telcon W/H Kerch of Region I. Investigation to Be Conducted Re Program Problems
IA-87-369, Final Response to FOIA Request for Transcript of ACRS Subcommittee 740118 Meeting on Grand Gulf.App a Document Available in PDR1 July 1987Final Response to FOIA Request for Transcript of ACRS Subcommittee 740118 Meeting on Grand Gulf.App a Document Available in PDR
IA-87-410, Final Response to FOIA Request.App a Documents Available in Pdr.Apps B & C Documents Partially Withheld (Ref FOIA Exemption 4)10 September 1987Final Response to FOIA Request.App a Documents Available in Pdr.Apps B & C Documents Partially Withheld (Ref FOIA Exemption 4)
IA-87-512, Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees14 September 1987Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees
IA-87-554, Discusses Schedule for Radiological Safety Review of Application for CPs for Plant.Summary of More Important Radiological Safety Review Milestones Encl for Info & Review4 August 1977Discusses Schedule for Radiological Safety Review of Application for CPs for Plant.Summary of More Important Radiological Safety Review Milestones Encl for Info & Review
IA-87-711, Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4)25 November 1987Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4)
IA-87-779, Final Response to FOIA Request for Documents from 680101 to Present Re Agreement Between Doj,Aec & Gulf States Concerning Util Integrated Transmission Sys.App B Documents Available in PDR11 December 1987Final Response to FOIA Request for Documents from 680101 to Present Re Agreement Between Doj,Aec & Gulf States Concerning Util Integrated Transmission Sys.App B Documents Available in PDR
IA-87-807, Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request14 December 1987Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request
IA-88-419, Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR7 September 1988Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR
IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)26 September 1989Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)
IA-91-440, Final Response to FOIA Request for Documents Re Shipment of Hazardous Waste from Two Nuclear Power Plants in Louisiana to Hazardous Waste Disposal Firms.App a Documents Available in Pdr.App B Documents Being Made Available in PDR29 November 1991Final Response to FOIA Request for Documents Re Shipment of Hazardous Waste from Two Nuclear Power Plants in Louisiana to Hazardous Waste Disposal Firms.App a Documents Available in Pdr.App B Documents Being Made Available in PDR
IA-93-355, Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request13 September 1993Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request
IA-96-376, Final Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR5 November 1996Final Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR
IR 05000029/198901431 August 1989Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted
IR 05000072/198800128 October 1988Ack Receipt of 880804 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Repts 50-072/88-01 & 50-407/88-01 & Order.Concludes That W/ Exception of Violation 5.c,violations Did Not Occur
IR 05000097/198900112 May 1989Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation
IR 05000108/200901423 October 1996Forwards SALP 14 Rept for Plant,Covering Period 950108-0914 & Informs That Subj Rept to Be Discussed W/Licensee at Public Meeting to Be Held at Perry Site on 961105.Conduct of Nuclear Activities at Concluded to Be Good OverallSystematic Assessment of Licensee Performance
IR 05000213/198600418 June 1987Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-245/86-06, 50-336/86-06 & 50-213/86-04.Progress & Established Milestones for Training Program Noted
IR 05000219/198601518 June 1986Forwards Safety Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted
IR 05000219/198802714 October 1988Forwards Insp Repts 50-219/88-27 & 50-289/88-25 on 880913- 19.No Violations NotedBiofouling
IR 05000237/198401515 May 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-373/84-25, 50-374/84-32,50-237/84-15,50-249/84-14,50-254/84-15, 50-265/84-13,50-295/84-19 & 50-304/84-20
IR 05000259/198600111 August 1986Confirmatory Action Ltr Re 860808 Telcon Concerning Encl Corrective Actions from Insp Repts 50-259/86-01, 50-260/86-01,50-296/86-01,50-327/86-01 & 50-328/86-01.Encl Withheld (Ref 10CFR2.790(d) & 73.21)
IR 05000264/19790035 December 1979Forwards Insp Rept 50-264/79-03 on 791022-24 & Notice of Violation
IR 05000277/19850989 December 1986Forwards SALP Repts 50-277/85-98 & 50-278/85-98 for Apr 1985 - Jan 1986 & 50-352/85-99 for Dec 1984 - Jan 1986. Improvement Needed in Limerick Security/Safeguards & Peach Bottom Surveillance,Maint,Licensing & Security/SafeguardsSafe Shutdown
Half scram
Ultimate heat sink
Fire Barrier
Stroke time
Tornado Missile
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Missed surveillance
Scram Discharge Volume
Systematic Assessment of Licensee Performance
Excess Flow Check Valve
Continuous fire watch
Fire Watch
Grace period
Inattentive
Unidentified leak
Overexposure
Affidavit
IR 05000293/198402529 November 1984Forwards Order Modifying License & Notices of Violation & Deviation from Insp Repts 50-293/84-25 & 50-293/84-29 on 840806-10 & 840824
IR 05000324/197600823 April 1976Forwards IE Insp Rept 50-324/76-08 on 760322-26 & 0330-0402. Violations Noted.Supporting Documentation Encl
IR 05000336/198301712 June 1986Ack Receipt of Informing NRC of Steps Taken to Correct Unresolved Item Noted in Insp Rept 50-336/83-17
IR 05000336/198502514 August 1985Forwards Insp Rept 50-336/85-25 for Consideration.Design Change Problem Identified in Rept Detail 2.f Considered to Have Potential Applicability to Work of Plant Design Change Task Group.W/O Encl
IR 05000338/19840394 April 1985Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Repts 50-338/84-39 & 50-339/84-39
IR 05000352/198404810 June 1985Forwards Insp Rept 50-352/84-48 on 840827-30 at Bechtel Corp in San Francisco,Ca Re Allegations Concerning Structural & Piping Design Activities at Hope Creek,Limerick & Susquehanna.No Allegations Re Hope Creek SubstantiatedEarthquake
IR 05000366/19830236 January 1984Forwards Corrected Page 2 to 831227 Proposed Imposition of Civil Penalties Based on Violations Noted in Insp Rept 50-366/83-23 Re Improper Shutdown.Correction Due to Administrative OversightFire Barrier
Liquid penetrant
IR 05000401/200700917 September 1985Forwards Insp Rept 50-458/85-29 on 850401-0709 & Notice of Violation.W/O Notice of Violation
IR 05000409/200503116 July 1985Forwards Notice of Violation Issued to Util Based on 850409-0531 InspFire Watch
IR 05000416/198305516 July 1984Ack Receipt of Re SALP Repts 50-416/83-55 & 50-417/83-09.Evaluation of Comments & Addl Info Incomplete
IR 05000416/19840542 July 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/84-54
IR 05000416/198500326 April 1985Ack Receipt of 850408 & 12 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/85-03
IR 05000416/19850066 June 1985Ack Receipt of 850506 & 31 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Rept 50-416/85-06
IR 05000416/19850095 July 1985Ack Receipt of 850524 & 0628 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/85-09