Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000498/1987071 | 21 December 1987 | Notification of 871230 Enforcement Conference in Arlington, Tx to Discuss Recent Failures to Comply W/Tech Specs as Described in Insp Rept 50-498/87-71 | |
IR 05000498/1992017 | 27 January 1993 | Notification of Significant Licensee Meeting W/Util on 930204 to Conduct Enforcement Conference to Discuss Apparent Violations Identified in Insp Repts 50-498/92-17 & 50-499/92-17 | |
IR 05000528/1985012 | 25 September 1985 | Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986 | |
IR 05000529/1985044 | 27 November 1985 | Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable | |
ML082320170 | 4 October 1985 | Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC Response | Backfit |
ML082380843 | 7 November 1985 | Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item Closed | Backfit |
ML082890913 | 18 March 1985 | Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 | |
ML18046B289 | 4 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML18046B290 | 10 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054J579 | 24 June 1982 | Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use | |
ML20054J856 | 23 June 1982 | Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures | |
ML20054K369 | 26 January 1982 | Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201 | Scram Discharge Volume |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20055A262 | 21 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A269 | 27 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline | |
ML20055A270 | 28 January 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055A277 | 12 February 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline | Exemption Request |
ML20055B295 | 21 May 1982 | Notifies That,Due to Extensive Involvement W/Resolution of Headquarters Investigation 79-19 Findings & Related Show Cause Order,Region 4 Did Not Perform Formal Systematic Assessment of License Performance for Aug 1979-Jul 1980 | |
ML20055B296 | 12 June 1981 | Forwards NRR Systematic Assessment of License Performance Evaluations for Facility for Jul 1980-June 1981 Per 810610 Request | Coatings Systematic Assessment of Licensee Performance |
ML20055C207 | 4 January 1988 | Forwards Region IV Response to 11 Issues Forwarded by Ofc of Inspector & Auditor to EDO in 871125 Memo,Per 871203 Telcon Request.Response to Issues Disproves Allegation of Former Manager of Nuclear Security at Util | |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20055G700 | 10 August 1988 | Forwards J Kelly Memo Re Security Inspector at Region Iv.W/O Encl | |
ML20055G702 | 2 November 1988 | Comments on Review of Physical Security Program.Dates of Earliest Copies of Plan Listed | Safeguards Contingency Plan |
ML20055G710 | 17 November 1988 | Forwards J Kelly 881109 Interview W/Ofc of Inspector & Auditor for Review & Comment by 881130 | |
ML20055G719 | 26 November 1988 | Discusses Review of Author 881109 Interview.Transcript Accurately Reflects Answers W/Listed Clarification | |
ML20055G725 | 21 December 1988 | Forwards Supplemental Interviews Re Investigation of Alleged Improper Actions by NRC Inspectors.W/O Encl | |
ML20055G731 | 8 February 1989 | Advises That Supplemental Interview Transcript Does Not Contain Safeguards Info as Defined by 10CFR73.21 | |
ML20055G734 | 8 March 1989 | Discusses Investigation Re Veracity of Training Program Records.Records Negligently Prepared & Supporting Data Either Nonexistent or in Disarray | |
ML20055G744 | 14 April 1989 | Forwards WE Dressler for Action | |
ML20055G769 | 7 August 1989 | Forwards Ltr from Regional Administrator Re Investigation of Alleged Improper Actions by NRC Inspectors.Action Considered Closed | |
ML20055G773 | 1 August 1989 | Summarizes Actions Taken Following Receipt of Ofc of Inspector & Auditor Rept 4-87-006.Supervisor Received Written Reprimand,One Inspector Suspended for 15 Days & One Inspector Received Written Reprimand | |
ML20055G775 | 16 November 1988 | Forwards La Yandell 881110 Interview W/Ofc of Inspector & Auditor for Review | |
ML20055G782 | 17 November 1988 | Forwards R Caldwell 881109 Interview W/Ofc of Inspector & Auditor for Review |