Issue date | Title | Topic | |
---|---|---|---|
ML20079N401 | 11 November 1991 | Mixed Waste Characterization & Processing | Eddy Current Testing |
ML20079Q912 | 15 June 1983 | Summary Rept of Radiological Aspects of Mod of McGuire Nuclear Station,Unit 1 Steam Generator | Eddy Current Testing Eddy-Current Testing |
ML20080B166 | 23 April 1982 | Rev 1 to Final Rept of Task Force Effort to Evaluate Technical Concerns of Catawba Welding Inspectors,Vol II: Technical Evaluations & Verifications - Individual Concerns. Related Info Encl | |
ML20080N723 | 16 February 1984 | Rev 2 to Response to Suppl 1 to NUREG-0737 | Post Accident Monitoring Emergency Lighting |
ML20080U454 | 29 February 1984 | Rev 10 to Analysis of Hydrogen Control Measures at McGuire Nuclear Station | |
ML20081E098 | 21 June 1982 | Restated Operating & Fuel Agreement | |
ML20082D657 | 14 November 1983 | Safety Evaluation for McGuire Units 1 & 2 Transition to Westinghouse 17x17 Optimized Fuel Assemblies | Shutdown Margin Negative Flux Rate Trip |
ML20082L857 | 23 September 1983 | Surveillance Requirements for Emergency Diesel Fuel Oil Sys in Nuclear Power Plants, Prepared for Snupps | |
ML20083N754 | 24 April 1995 | Rn Sys Corrosion in Stainless Steel Welds Metallurgical Analysis Rept | |
ML20083P938 | 17 April 1984 | Sqrt Audit Resolutions for Sqrt Audit Conducted 840313-16. W/Seven Oversize Drawings.Aperture Cards Are Available in PDR | |
ML20086F471 | 30 June 1995 | Interim Plugging Criteria 90 Day Rept | Non-Destructive Examination Nondestructive Examination Stress corrosion cracking Eddy Current Testing |
ML20086P892 | 17 August 1981 | Comments Re Igniters in Upper Plenum of Ice Condenser of Sequoyah & McGuire Nuclar Power Plants, Prepared for ACRS Subcommittee on Class 9 Accidents | |
ML20087F890 | 30 June 1983 | Steam Pressure Suppression Characteristics of Water-Soluble Plastic Membrane Shielded Ice for Ice Condenser Containment Nuclear Power Plants. Supporting Documentation Encl | Boric Acid Safe Shutdown Earthquake B.5.b |
ML20087M417 | 23 March 1984 | Nonproprietary Info Reflecting Use of Rosemount Resistance Temp Detector | |
ML20087M628 | 28 March 1984 | Nonproprietary, Methodology for Addressing Superheated Steam Releases to Ice Condenser Containments | |
ML20090G673 | 30 April 1984 | Nuclear Physics Methodology for Reload Design | |
ML20090J007 | 31 July 1984 | Description of Deviations from Generic Emergency Response Guidelines (Westinghouse Owners Group ERG-Basic Edition) | Manual Operator Action |
ML20091J056 | 1 June 1984 | Diesel Engine 1A Component Revalidation Insp Rept | Breakaway torque Liquid penetrant |
ML20091L872 | 31 May 1984 | Sqrt Audit Resolution for Ser,Catawba Unit 1 | |
ML20092J244 | 20 June 1984 | Duke Power Co 12 H Shift Experience | |
ML20092J267 | 8 June 1984 | Util Advisor Evaluation Team Rept on Catawba Nuclear Station Shift Advisor Program,840606-08 | |
ML20092N702 | 29 June 1984 | Diesel Engine 1A Component Revalidation Insp Final Rept | |
ML20094N064 | 31 July 1995 | Computer Program for Coupled Response Spectrum Analysis of Secondary Sys | |
ML20094N075 | 31 October 1995 | Validation of Crest, Interim Rept | Earthquake |
ML20098A451 | 30 April 1995 | Stations Replacement SG Topical Rept | |
ML20101F181 | 18 November 1991 | Rev 0 to Overtemp Delta Temp Scaling,Westinghouse NSSS Process Control Sys | |
ML20115E023 | 30 April 1985 | Main Steamline Break Inside Containment, Bimonthly Status Rept for Apr 1985 | |
ML20117J049 | 8 May 1996 | At&T Round Cell Nuclear Util User'S Council Charter | |
ML20117J446 | 28 February 1982 | Evaluation Rept Feb 1982,McGuire Nuclear Station,Duke Power Co | |
ML20117M791 | 28 February 1995 | Standby Nuclear SW Pond Physical Testing Conducted During Feb 1995 | Grab sample |
ML20117M802 | 31 July 1995 | CNS Standby Nuclear SW Pond Analysis | |
ML20125E176 | 14 September 1979 | Weld Metal Investigation Rept | Reverse polarity |
ML20125E177 | 1 October 1979 | Weld Matl Documentation of Eleven Reactor Pressure Vessels Fabricated by Rdm for Westinghouse | |
ML20126A067 | 9 December 1992 | Snubber Elimination at McGuire Nuclear Station Using Limit Stops, Interim Rept | Earthquake |
ML20127L719 | 31 May 1985 | Evaluation of Main Steam Line Break in Doghouse | Safe Shutdown Boric Acid |
ML20128E983 | 21 June 1985 | Diesels - Tdi Owners Group Design Review/Quality Revalidation Final Rept,Summary of Recommendations | FLEX Breakaway torque Liquid penetrant Locktite Overspeed trip |
ML20128F701 | 31 May 1985 | Corrected Evaluation of Main Steam Line Break in Doghouse. Rept Redistributed Due to Copying Error | Safe Shutdown Boric Acid |
ML20133D226 | 30 September 1985 | Safety Analysis for Upper Head Injection Elimination | Boric Acid Shutdown Margin Loop seal Fuel cladding Operational leakage |
ML20137V914 | 25 September 1985 | Diesel Engine 2A Component Revalidation Insp | Breakaway torque Liquid penetrant Locktite Overspeed trip |
ML20138P480 | 17 December 1985 | Diesel Engine 2B Component Revalidation Insp | Eddy Current Testing Breakaway torque Liquid penetrant Locktite Overspeed trip |
ML20138Q936 | 20 September 1985 | Rev 1 to Analysis of Electray Hanger Rods in Unit 1 Mechanical Pipe Chase at McGuire Nuclear Station | Locked High Radiation Area |
ML20138Q947 | 31 October 1985 | Analysis of Electray Hanger Rods in Unit 2 Auxiliary Feedwater Pump Room at McGuire Nuclear Station | |
ML20151S167 | 30 October 1985 | Analysis of Coolant at Reduction Observed at McGuire Unit 2 | |
ML20154K209 | 9 September 1988 | Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld | |
ML20155F738 | 30 April 1986 | Diesel Generator 2B 7 Main Bearing Failure Rept,Low Power License Condition 13,Attachment 1,Item 9 | |
ML20155F745 | 30 April 1986 | Draft Main Bearing Shell Analysis 2B Emergency Diesel Generator-Catawba Unit 2 | |
ML20196L628 | 20 May 1988 | Rev 2 to ATWS Mitigation Sys Actuation Circuitry (Amsac) | Anticipated operational occurrence |
ML20196L642 | 6 May 1988 | ATWS Mitigation Sys Actuation Circuitry Response to Unit Transients | |
ML20198B570 | 28 February 1985 | Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept, Vols 1-4 | Safe Shutdown Earthquake Coatings Operating Basis Earthquake Temporary Modification Eddy Current Testing Breakaway torque Battery sizing Earthquake Liquid penetrant Loctite Overspeed trip Thermal fatigue |
ML20198J407 | 30 April 1986 | Rev 1 to Catawba Nuclear Station Diesel Engine 2A Component Revalidation Insp | Eddy Current Testing |