Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19254E98515 October 1979Final Deficiency Rept Re DBA Movements of Steel Containment. Forwards List of Piping Sys by Penetration for Reanalysis Re Inertial Effects.All Piping Sys Having Rigid Penetrations Through Steel Containment ReanalyzedSafe Shutdown
Earthquake
ML19254F21330 October 1979Second Interim Rept Re Foxboro Instrumentation.Erroneous Output Signals Came from Magnetic Amplifier Equipment.Caused by Inability of Module to Correct for Normal Voltage Transients.Inverters Being Replaced
ML19256A23816 October 1978First Interim Rept of Deficiency Ncr 2p:Plant Configuration Different than Drawings of Record,Due to Error to TVA Drawing Certification Process
ML19256A40629 November 1978Final Deficiency Rept Re Separation of Impeller from the Pump Shafts After Period of Use in High Pressure Fire Protection Sys,Caused by Incorrect Method of Attaching Impeller to ShaftSafe Shutdown
ML19256A41216 November 1978Deficiency in Essential Raw Cooling Water Sys Supply to Heat Exchangers:W/Loss of Water Through Exchangers,Ercw Sys Will Not Meet Sys Design Basis of LOCA Associated W/Loss of Offsite Power & Loss of Train a
ML19256B20828 December 1978Third Interim Rept Re Possible Unconservative Pressurizer Relief & Safety Line Blowdown Analysis.Reanalysis & Support Design of Sys Complete,But Some Components of Nozzle Loads Are Too Great
ML19256F62112 December 1979Final Deficiency Rept Re RCS Exceeding Heatup & Cooldown Rates.Physical Locations of Temp Elements Subject Them to Localized Transient Temp Changes Not Indicative of RCS as Whole.No Corrective Action Necessary
ML19256G11818 December 1979Final Rept on Field Relay Coil Failures.Field Relay Coils Replaced & Generators Back in Svc
ML19256G25114 December 1979Final Deficiency Rept:On 791116,charcoal Absorber Trays Were Found to Leak Charcoal Between Frame & Perforated Plate. Caused by Design Defect Due to Poorly pop-riveted Joint. Trays Will Be Removed & Replaced
ML19257A8972 January 1980Final Deficiency Rept Re Inappropriate Seismic Analysis of Upper Head Injection Piping.Unit 2 Piping Required Different Seismic Response Spectra.Piping Will Be Reanalyzed Using Appropriate Seismic Response Spectra
ML19257D09023 January 1980Final Deficiency Rept Re Ice Condenser Heat Loads Exceeding Design Heat Loads.Glycol Chiller Units Currently Maintaining Temp of 15 F
ML19259C23310 May 1979Final Deficiency Rept:Bistable Contacts in Auxiliary Room Loops of Pressurizer Power Relief Valves Failed in Undersirable Position.Valve Wiring Corrected.No Other Discrepancies Found
ML19259D38210 October 1979Revised Final Deficiency Rept Re Potential Excessive Water Hammer Forces in Main Feedwater Sys.Util Failed to Evaluate Water Hammer Forces at Design Stage.Main Check Valves Analyzed.Valves Adequate for All Accident ConditionsSafe Shutdown
ML19260C86330 January 1980First Interim Deficiency Rept Re Radiation Monitors Spurious Signals.On 791212 & 13,readout Instruments in Main Control Room Spiked Upscale in Unison.Caused by Operation of Heliarc Welding Machine in Auxiliary BldgBoric Acid
ML19260E2614 February 1980Final Deficiency Rept Re Incorrect Valve Data Used in Piping Analyses of Lines Penetrating Steel Containment Vessel.Pipe Supports Are Being Added,Moved or Modified as Required to Meet Piping Code Stress Allowables
ML19260G38329 October 1980Final Interim Deficiency Rept First Reported 800516,re Design Criteria for Secondary Side Pipe Breaks.Design Did Not Adequately Protect Steam Generator Blowdown Lines. Supports & Barrier Required to Mitigate Any Pipe Rupture
ML19261B64516 February 1979Final Rept on Reactor Coolant Pump Tie Rod Embedments.Addl Anchor Bolts Added to Each of Three Embedments Per Unit & Stiffener Plates Added to One of Embedments Per Unit
ML19261B65020 February 1979Final Deficiency Rept Concludes Nine Addl Fire Dampers & Eight Addl Fire Doors Are Required in Control & Auxiliary Bldgs
ML19261D62015 June 1979Final Deficiency Rept:Overstressed Penetrations in Containment Shell.Design Drawings Are Being Revised to Move Snubbers & Secure Them Between Piping & Steel Containment. Mods Will Be Performed Prior to Respective Fuel Load Dates
ML19263B07128 December 1978Final Deficiency Rept Re Separation of Impeller from Pump Shafts After Period of Use in Fire Protection Sys,Caused by Method of Attaching Impeller to Shaft.Pumps Are Being RepairedSafe Shutdown
ML19263B85512 January 1979First Interim Rept on Inadequate design:as-built Configuration of Heating,Air Conditioning & Ventilating Penetrations Were Not Accounted for in Containment Design. Caused by Design Spec Error
ML19263B89220 December 1978Final Rept on Deficient Diesel Generator Hydraulic Actuator Speed Control Circuits on Diesels 2A-A & 2B-B.Electric Drives for Hydraulic Actuators Developed Open Armature Circuit & Relay Contacts Burned.Caused by Voltage MismatchSafe Shutdown
ML19263B93217 January 1979First Interim Rept for Deficiency Initially Reported 781218. Compartmentation of Control Bldg & Auxiliary Bldg Did Not Meet Fire Protection Design Criteria.Addl Fire Doors & Fire Dampers Will Be Added
ML19269E58325 June 1979First Interim Deficiency Rept:During Hot Functional Preoperational Testing,Removal of Bellows Restraints Revealed Misalignment.Caused by Faulty Installation Sequence.Bellows ReinstalledSafe Shutdown Earthquake
ML19270F0544 January 1979Final Deficiency Rept Re Difference Between Design Drawings & Actual Plant Configuration.Error Found in Drawing Certification Process,Where a Portion of Residual Heat Removal Sys Was Modified Bedore Certificate of Drawings
ML19270F05512 January 1979Deficiency Rept:Lateral Restraint Needed During a Seismic Event Was Omitted from the High Pressure Chemical & Volume Control Piping Sys in Auxiliary Bldg.Replacement Will Be Designed & Installed by 790401
ML19270F05919 December 1978Second Interim Rept on Reduced Safety Injection Sys Flow at Low Reactor Coolant Levels.Licensee & Westinghouse Have Completed Installation of Modified Orifice Design. Accumulators Will Be Retested by Late Feb
ML19270F06728 December 1978Revised Final Deficiency Rept Re High Pressure Fire Protection Pump Failures.Impellers Separating from Pump Shafts Where Lock Collets Are Used;Reattached by Thrust Ring Const MethodSafe Shutdown
ML19270G45531 May 1979Revised 790510 Final Deficiency Rept Re Control Loop Bistable Failure on Loss of Power.Revision Specifies That Wiring Diagrams for Bistable Have Been Corrected & Physical Wiring Will Be Corrected
ML19270G82111 June 1979Submits Third Interim Deficiency Rept Re Vibration in RHR Piping Initially Reported 790208.Possible to Avoid Operational Modes That Result in Unacceptable Cavitation Across Valves.Operating Mode Recommendations Being Developed
ML19270H23718 June 1979Final Deficiency Rept:Pipe Restraint Structural Strand Temp.Pipe Thermal Insulation Being Redesigned to Provide Horizontal V-notch Configuration in Areas Where Strands Are in Close Proximity to Pipe
ML19270H80626 September 1979Final Deficiency Rept Re Tensile Anchor Capacities Lower than Assumed in Design Allowables.Test Program Initiated to Qualify Effect of Plate Flexibility on Stud Capacities to Withstand Design Loadings
ML19273B4209 March 1979Final Deficiency Rept,Ncr 1011,re Reduced Safety Injection Sys Accumulator Flow at Low Reactor Coolant Sys Levels. Design of Modified Injection Line Orifice Solved Problem of Backpressure Effect on Cavitation Downstream
ML19273B42714 March 1979First Interim Rept on Tensile Anchor Capacities Lower than Assumed in Design Allowables.Caused by Progressive Cracking of Heat Affected Zone of Welded Stud Anchors in Flexible Plate Connections.Tests Underway
ML19273B44014 March 1979First Interim Rept on Failure of Control Loop Bistables on 790214:bistables in Auxiliary Control Room Found to Fail in Undesirable Position Upon Loss of Control Power.Caused by Error in Instrument Wiring
ML19273B44228 February 1979First Deficiency Rept on Diesel Generator Relay Tachometer Failures During Periodic & Preoperational Testing.Probably Caused by Improperly Designed Voltage Regulation Circuits. Zener Diodes Replaced
ML19275A07216 August 1979Final Deficiency Rept Re Electrical Handhole Structural Integrity.Evaluation Indicates That Six Structures in Question Are Adequate for All Design Basis Events
ML19276F5887 March 1979Final Deficiency Rept:Movement of Steel Containment Vessel Was Not Accounted for in Design of Supports for Small Lines Penetrating Shield Bldg.Designs Are Under Analysis & Supports Will Be Redesigned
ML19276F61828 February 1979Final Deficiency Rept Re Metal Shavings Found in Operating Cylinders & Filters of Hydraulic Sys.Operation of Manual Pump Permitted Overpressurization of Hydraulic Cylinder. Shavings Removed
ML19276F62828 February 1979Final Deficiency Rept:Determined That Break in nonseismically-qualified Lines of Essential Raw Cooling Water Sys Would Result in Unacceptable Loss of Water. Qualified Instrumentation Will Be Provided
ML19289C16429 November 1978Revised Rept Deficient Foundation Preparation for Concrete Cells for the ERCW Pumping Station Access Roadway.
ML19291A88611 July 1979First Interim Deficiency Rept Re Failure of Barton Narrow Range Steam Generator Level Transmitters to Meet Acceptance Criteria for Accuracy.Suspect Transmitters Being Returned to Barton for Checking & Mods
ML19296A97412 February 1980Revised Final Deficiency Rept Re Piping Embedded in Structural Concrete.Revises Pressure Limits for 6-inch Pipes During Sys Testing
ML19296B7871 February 1980Final Deficiency Rept Re Inappropriate Documentation for Engineered Supports.Qa Audit Revealed 16 Supports Documented as Acceptable Based on Rejected Support Mod Requests.New Mod Requests Approved or Insp Cards Invalidated
ML19296C38211 February 1980Update to Final Deficiency Rept Re Incorrect Valve Weight Used in Piping Analysis.Forwards Addl Info Justifying Fuel Loading in Unit 1 Before Completion of Corrective Action. Corrective Action Will Be Completed Before Criticality
ML19296D33311 February 1980Final Deficiency Rept Re Incorrect Copes-Vulcan Valve Weight.Rerun of Piping Sys Load Analyses Indicates That Existing Supports Adequate to Absorb New Loads
ML19296D33712 February 1980Revised Final Deficiency Rept Re Piping Embedded in Structural Concrete.Evaluation Indicates That Structural Capacities Would Not Be Impaired by Embedded Pipes Having Been Subjected to Pressure Greater than 200 Psi
ML19305A10828 December 1978Final Deficiency Report:During Preoperational Test of Upper Head Injection Sys,Accumulators Injected Water in Excess of Design Allowables for LOCA Simulation.Standpipes Have Been Removed & Corrected
ML19305D95326 March 1980Second Interim Deficiency Rept Re Control Rod Drop Events. Westinghouse Continuing Investigation on Generic Basis.Next Rept Will Be Submitted by 800613Rod Drop Event
ML19305D96511 April 1980Suppl to Final Deficiency Rept Re Pressurizer Relief Piping Support.Results of Tests to Verify Adequacy of Draw Bead Welding on Pressure Relief Valve Line Show That Weld Is Not Sensitized