Third Interim Rept Re Possible Unconservative Pressurizer Relief & Safety Line Blowdown Analysis.Reanalysis & Support Design of Sys Complete,But Some Components of Nozzle Loads Are Too Great
ML19256B208
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/28/1978
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19256B207 List:
References
NUDOCS 7901240277
Download: ML19256B208 (1)


Text

= '

3 SEQUOYAll NUCLEAR PLANT POSSIBLE UNCONSERVATIVE PRESSURIZER RELIEF AND SAFETY LINE BLOWDOWN ANALYSIS NCR CSQ 78-2 THIRD INTERIM REPORT Interim Progress Reanalysis and support design on the system has been completed.

However, certain components of the nozzle loads on the pres-surizer spray line nozzles exceed the allowable loads defined in Westinghouse Specifications.

These nozzle loads were forwarded to Westinghouse for a detailed review to determine acceptability. Similarly, nozzle loads on the pressurizer relief tank nozzle were forwarded to Westinghouse for review since allowables for these nozzle loat' were not previously defined by Westinghouse. A final report will be submitted upon completion of Westinghouse's detailed review of these nozzle loads.