First Interim Deficiency Rept Re Radiation Monitors Spurious Signals.On 791212 & 13,readout Instruments in Main Control Room Spiked Upscale in Unison.Caused by Operation of Heliarc Welding Machine in Auxiliary Bldg
ML19260C863
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/30/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To:
References
NCR-20P, NUDOCS 8002060284
Download: ML19260C863 (2)


Text

s TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II January 30, 1980 Mr. James. O'Reilly, Director Office of spection and Enforement U.S. Nuclea Regulatory Commission Region II - b ice 3100 101 Marietta 5 reet Atlanta, Georgi 30303

Dear Mr. O'Reilly:

SEQUOYAll NUCLEAR PLANT UNITS 1 AND 2 - RADIATION MONITORS SPURIOUS SICNALS - NCR 20P - FIRST INTERLM REPORT The subject deficiency was initially reported to NRC-0IE Inspector W. T. Cottle on January 4,1980, in accordance with 10 CFR 50.55(e).

Enclosed is our first interim report. We expect to provide additional information by March 5, 1980.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 854-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure Mr.VictorStallo,Jr., Director (Enclosure)!

cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 1933 156 30/9 50M 2

///

An Eaual Cooortunity Employer 8002060

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 RADIATION MONITORS SPURIOUS SIGNALS NCR 20P 10 CFR 50.55(e)

FIRST INTERIM REPORT Description of Condition The readout instraments in the main control room for 12 radiation monitors were spiked upscale in unison for two hours on December 12, 1979, and for one hour on December 13, 1979.

The spikes generally peaked at one million counts per minute.

The 12 monitors identification numbers and their applications are listed below:

0-RE-90-132A Service Building Vent (Particulate)

U-R E-90-13 2 B*

Service Building Vent (Gaseous) 0-RE-90-101A Aux. Building Vent (Particulate) 1-RE-90-170 Boric Acid Evap. Condensers 1-R E-90-120*

Steam Generator Blowdown Liquid Mon.

1-RE-90-121*

Steam Generator Blowdown Liquid Mon.

0-RE-90-118

  • Waste Gas Disposal System Gas Effluent bbn.

0-RE-90-123

' Component Cooling Water Heat Exchanger Liq. Mon.

1-RE-90-123 Component Cooling Water Heat Exchanger Liq. Mon.

2-RE-90-123 Component Cooling Water Heat Exchanger Liq. Mon.

1-RE-9 0-100B

  • Has radiological effluent e.ccitoring technical specification The upscale readings were determined to be caused by the operation of a heliarc welding machine in the Auxiliary Building, two floors below the elevation of the cable spreading room which is under the main control room. The monitor signal cables apparently picked up radio frequency interference produced by the welding machines.

The cables are run in cable trays.

Corrective Action TVA is evaluating the appropriate corrective action for this nonconformance and will provide additional information when a decision on the corrective action has been made.