Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML0308003326 November 2002Control Room Log Entries ReportGrab sample
ML0308003436 November 2002Response to NRC AFW Special Inspection Request for Information, Question 9
ML0308004728 November 2002Review Temp ChangesSafe Shutdown
Boric Acid
Post Accident Monitoring
ML03080057220 November 2002Fax Krohn to Kunowski, NMC Open Issues
ML03080060425 November 2002Power Supplies and Failure Modes for Auxiliary Feedwater System Electrical Components
ML03083017325 November 2002Fax, Summary of Post-TM I AFW Licensing Correspondence
ML0308700256 February 2003Compilation of AFW Corrective Actions, Taken in Response to Potential Common Mode Failure Due to a Loss of Station Air and Operator Actions, Volume 3 of 4 (Provided by Licensee in Response to a Question from Ken O'Brien, Usnrc), State ChangOffsite Dose Calculation Manual
Post Accident Monitoring
Probabilistic Risk Assessment
Process Control Program
Operability Determination
Safeguards Contingency Plan
ML0308700566 February 2003Compilation of AFW Corrective Actions, Taken in Response to Potential Common Mode Failure Due to a Loss of Station Air and Operator Actions, Volume 3 of 4 (Provided by Licensee in Response to a Question from Ken O'Brien, Usnrc), Design DescSafe Shutdown
High winds
Fire Barrier
Stroke time
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Temporary Modification
Emergency Lighting
Seismically rugged
Foreign Material Exclusion
Exemption Request
Earthquake
Fire Protection Program
ML0308703446 February 2003Compilation of AFW Corrective Actions, Taken in Response to Potential Common Mode Failure Due to a Loss of Station Air and Operator Actions, Volume 1 of 4 (Provided by Licensee in Response to a Question from Ken O'Brien, Usnrc), State ChangHigh winds
Stroke time
Probabilistic Risk Assessment
Operability Determination
Earthquake
ML0308703546 February 2003Compilation of AFW Corrective Actions, Taken in Response to Potential Common Mode Failure Due to a Loss of Station Air and Operator Actions, Volume 1 of 4 (Provided by Licensee in Response to a Question from Ken O'Brien, Usnrc), Reactor TriBoric Acid
High winds
Post Accident Monitoring
Probabilistic Risk Assessment
B.5.b
Process Control Program
Safeguards Contingency Plan
Earthquake
ML03087075715 August 2002Document Review & Approval, PBF-1584, Design Input ChecklistOffsite Dose Calculation Manual
Temporary Modification
Process Control Program
ML03087081429 October 2002Control Room Log Entries Report
ML03087082229 October 2002Temporary Change Review and Approval, AOP 23, Establishing Alternate FW Suction Supply, SCR 2002-0752High winds
Earthquake
ML03087084518 February 2002Plant Modification Package No. 99-029*C, Entitled, Aux Feed Water Pump 1P-29 Minimum Flow Recirc Line Orifice.Safe Shutdown
High winds
Packing leak
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Post Accident Monitoring
Hydrostatic
Coatings
Temporary Modification
Emergency Lighting
Foreign Material Exclusion
Earthquake
Liquid penetrant
Fire Protection Program
Fire Watch
ML03087085718 November 2002Control Room Log Entries Report
ML03087087221 November 2002Control Room Log Entries Report
ML03087088224 November 2002Control Room Log Entries Report
ML03108058115 April 2003NMC-PII Project Plan & Schedule
ML03111005921 February 2002Sdp/Enforcement Panel Worksheet - Point Beach AFW Recirculation ValvesHot Short
Safe Shutdown
Fire Barrier
Condition Adverse to Quality
Power-Operated Valves
ML0311101568 October 2002Handwritten Note from Point Beach 1 Meeting
ML03301026229 September 2003Initial Submittal of the Written Exam for the Point Beach Initial Examination - Sept/Oct 2003Boric Acid
Shutdown Margin
High Radiation Area
Grab sample
Time to boil
Fuel cladding
ML04041049220 February 2004Order EA-03-009 Service List
ML04161015926 May 2004Questions and Responses - May 3, 2004 Summary of Telephone Conference on Between NRC & NMC Concerning Receipt of Aging Management Program Post - Audit RAIs Pertaining to Pt. Beach Nuclear Plant, Units 1 & 2, LRABoric Acid
Coatings
Aging Management
Biofouling
Fire Protection Program
Grace period
ML04237088618 August 200472-5 Service List
ML0505404649 February 2004Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants
ML05054046910 February 2004Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004Safe Shutdown
Fire Barrier
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
ML05083046116 June 2004NRR-2004-A-0026, Open Case Chronology Sheet
ML05084005621 March 2005Key Safe Functions
ML05084005821 March 2005Executive Summary C128
ML05084006021 March 2005S/G Nozzle Dam Removal Pre-job BriefForeign Material Exclusion
ML05084006421 March 2005Operating Experience TableHydrostatic
Foreign Material Exclusion
Scaffolding
ML05084006721 March 2005Briefing Notes for Nozzle Dam Installation Breathing Air Supply Issues
ML05084006921 March 2005S/G Nozzle Dam Removal Pre-job BriefLoop seal
Fire Barrier
Foreign Material Exclusion
ML05084007121 March 2005NMC Root Cause Evaluation Charter: Attachment Q, RCE Report Template
ML05084010921 March 2005Executive Summary C128
ML05084011121 March 2005One Column Nozzle Dam Just-in-Time Training
ML05084011221 March 2005Pbnp U1R28 PlanSafe Shutdown
ML05084011321 March 2005Use Aceman During U1R28
ML05084011521 March 2005Defined Critical PathScaffolding
ML05084011621 March 2005Site Communication
ML05084011721 March 2005Reduced Inventory
ML05084011921 March 2005Breaker Shematic
ML0508404929 April 2004Attachment 1, Pbnnp SG Nozzle Dam Installation & Vent Path Timeline April 9, 2004
ML0508404949 April 2004Station Log Crl Excerpts for April 9, 2004Boric Acid
ML0508404959 April 2004Outage Control Center Crl Excerpts for April 09, 2004
ML0508404979 April 2004CAP055538 Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation
ML0508405069 April 2004CAP055527 U1R28 Nozzle Dam Installation Supplied Breathing Air Problems
ML0508405079 April 2004CAP055538 Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation
ML05084050930 April 2004NMC Incident Response Team for Issues Encountered During Unit 1 Reduced Inventory and Nozzle Dam Installation at Pbnp - Final Report
ML05084051311 April 2004CAP055576 SG Manway Removal/Installation Rmp Could Generate Cl Opening Without Hl Vent