Control Room Log Entries Report
ML030870882
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/24/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094
Download: ML030870882 (2)


Text

Log Entries Report /--A - o tUc/ ,

.jI¶424d2002 06:02 NLOGS01 Larson, Tom Assumed DOS (Fire Brigade) Position from Beltz, Boyd. DOS (Fire Brigade).

[Larson, Tom - DOS (Fire Brigade) - Station Log - Day Shift]

r A.

11124/2002 06:07 NLOGS01 Matson, Pat Assumed DSS Position from Kreil, Jeff, DSS. [Matson, Pat - DSS - Station Log - Day Shift]

11124/2002 07:11 NLOGS01 Storm, Chuck Assumed 4th License Position from Taylor, Tim, 4th License. [Storm, Chuck - 4th License Station Log - Day Shift]

11124/2002 07:12 NLOGS01 Meaney, Doug Assumed Unit 2 CO Position from Bryant, Sky, Unit 2 CO. [Meaney, Doug - Unit 2 CO Station Log - Day Shift]

11124/2002 07:12 NLOGS01 Lohr, Tim Assumed 3rd License Position from Inman, Rick, 3rd License. [Lohr, Tim - 3rd License - Station Log - Day Shift]

11124/2002 07:13 NLOGS01 Post Bob Assumed Unit 1 CO Position from Lewis, Al, Unit I CO. [Post, Bob - Unit I CO - Station Log Day Shift) 1112412002 07:13 NLOGS01 Steuer, Will Assumed U1 TurbHall (FireBrigade) Position from Scheppman, Darrell, Ul TurbHall (FireBngade). [Steuer, Will - Ul TurbHal (FireBrigade) - Station Log - Day Shift]

1112412002 07:13 NLOGS01 LaFountain, Ken Assumed PAB (FireBrigade) Position from McGarry, Bill, PAB (FireBrigade). [LaFountah, Ken - PAB (FireBrigade) - Station Log - Day Shift]

11124/2002 07:14 NLOGS01 Alef, Kurt Assumed U2 TurbHall (FIreBdgade) Position. [Alef, Kurt- U2 TurbHall (FIreBrigade) - Station Log

- Day Shift) 11/24/2002 07:14 NLOGS01 Brdhk, Scott Assumed TraineeAOT I Position. [Brdlik, Scott - Trainee-ACT I - Station Log - Day Shit 11/24/2002 07:16 NLOGS01 Burish, John Assumed WtrTeatment(FireBrigade) Position from Becker, Joe, WtrTreatment(FireBrlgads)

[Burish. John - WtrTreatrnent(FireBrigade) - Station Log - Day Shift]

11/2412002 07:25 NLOGS02 Log turned over by Larson, Tom [Larson, Tom - OS (Fire Brigade) - Station Log - Mid Shift]

11124/2002 07:25 NLOGS03 Log approved by Larson, Tom [Larson, Tom - OS (Fire Brigade) - Station Log - Mid Shift]

11/2412002 07:27 WT Backwashed Completed 0-TS-RE-001 Power Level Determination, Sat, on Unit 2. [Lohr, Tim - 3rd License - Station Log

- Day Shift]

11/24/2002 07:33 0-TS-RE-001 Unit I Completed 0-TS-RE-001 Power Level Determination, Sat on Unit 1. [Lohr, Tim - 3rd License - Station Log

- Day Shift]

11/24/2002 09:40 ATCo and Power System Supervisors notified of plan to run G-04 and parallel to the grid. [Jessessky, Tom

- OS (Fire Brigade) - Station Log - Day Shift]

11/24/2002 09:63 Commencing TS-84, EDG G-04 Test G-04 declared 0OS. LCO 3.8.1, AC Sources, not met for Both units.

Entering TSAC "E" for 2A06. RA "EI met all redundant equipment Is operable. RA "E.2.1" met inoperbility Is due to testing, not due to failure. RA"E.3" requires restoring an operable standby power supply within 7 days and 14 days from discovery to meet LCO. [Storm, Chuck - 4th Ucense - Station Log Day Shift) 11/2412002 09:63 NLOGS01 Harrsch, Rob Assumed OS (Fire Brigade) Position from Jessessky, Tom [Harrsch, Rob - OS (Fire Brigade) - Station Log - Day Shift]

11/24/2002 09:54 Stationed Chuck Storm as Level 4 Dedicated Operator for G03 during the performance of TS-84 for the requirements of Safety Monitoring Program.

per TS-84, Attachment D.

[Storm, Chuck - 4th License - Station Log - Day Shift]

1112412002 09:59 DSS Midnight Entry Placed G-04 Mode Selector switch to "Locar per TS-84 for local jacking of G-04. [Meaney, Doug - Unit 2 CO - Station Log - Day Shift]

11124/200210:22 HOH Detain Unit 2 - Started 50 minute, non-paralell HOH Demineralizer run per Chemistry requestL Meney, Doug Unit 2 CO - Station Log - Day Shift] 35-/

Page 4 of 7

Log Entries Report

--:h124=2002 10:28 DSS Midnight Entry Completed jacking of G-04 Diesel and placed G-04 Mode selector switch to "Exercise" per TS-84. [Meaney, Doug - Unit 2 CO - Station Log - Day Shift]

111242002 10:46 ICP-2.001xx Start -Both units entering LCO 3 8.1, TSAC "E" for 1A06 perTS-84, G-04 aligned to lA06 IAWTS-84. RA"E.1" met, all redundant equipment is operable. RA "E.2.1" met, Inoperability Is due to testing, not due to failure.

RA "E.3" requires restonng an operable standby power supply within 7 days and 14 days from discovery to meet LCO. G03 removed from service due to defeating the Auto Start Capabilities per TS-84, Attachment C. [Meaney, Doug - Unit 2 CO - Station Log - Day Shift]

11124/200211:13- ICP-2.00txx Start G-03 aligned to 1A061 AWTS-84. Both units exiting LCO 3.8.1, TSAC'E"for 1A06 perTS-84. Remaining In LCO 3.8.1, TSAC "E" for 2A06. (Meaney, Doug - Unit 2 CO - Station Log - Day Shift]

11124/200211:20 HOH Demln Unit 2 - Secured 50 minute, non-paralell HOH demin run per OP-5D, CVCS Demineralizer Operation.

[Meaney, Doug - Unit 2 CO - Station Log - Day Shift]

11/2412002 12:58 ICP-2.00xx Start G-04 operable and aligned to 2A06 per TS-84. Exiting LCO 3.8.1, TSAC "2", LCO 3.8.1 met for both units.

[Meaney, Doug - Unit 2 CO - Station Log - Day Shift) 11/2412002 13:01 Released Chuck Storm as Level 4 Dedicated Operator from G03. for the requirements of Safety Monitoring Program, per TS-84. [Meaney, Doug - Unit 2 CO - Station Log - Day Shift]

11124/200213:20 ICP-2.00xx Start Common: TS-84, Emergency Diesel Generator G-04 Monthly, completed with satisfactory results. [Larson, Tom - DOS (Fire Brigade) - Station Log - Day Shift]

11/24/2002 13:30 C RO tripped off line. Reset booster pump relay tripped flag and found the A phase 15 amp fuse blown.

Replaced all 3 fuses with like replacement [Burish, John - WtrTreatment(FireBrigade) - Station Log - Day Shift]

111/242002 14:00 C RO unit back online. [Burish, John - WtrTreatment(FireBrigade) - Station Log - Day Shift]

11/24/200214:10 NLOGS01 Harper, Ron Assumed DSS Position from Matson, Pat, DSS. [Harper, Ron - DSS - Station Log - Swing Shift 11/24/200214:11 NLOGS01 DeBauche, Steve Assumed DOS (Fire Brigade) Position from Larson, Tom, DOS (Fire Brigade).

[DeBauche, Steve - DOS (Fire Brigade) - Station Log - Swing Shift]

11124/2002 14:17 NLOGS01 Harrsch, Rob Assumed OS (Fire Brigade) Position from Harrsch, Rob, OS (Fire Brigade).

[Harrsch, Rob - OS (Fire Brigade) - Station Log - Swing Shift]

111/24/200214:17 NLOGS01 Adams, Bob Assumed STA Position from Rode, Ryan, STA. (Adams, Bob - STA - Station Log - Swing Shift]

111241200214:20 - B softener online, A softener off for regen. [Burish, John - WtrTreatment(FireBrigade) - Station Log - Day Shift]

S11/24/200214:33 Unit I - Drained Sump A per ARB. [Post, Bob - Unit I CO - Station Log - Day Shift]

11/241200215:17 NLOGS01 Jurss, Dave Assumed Unit 2 CO Position from Meaney, Doug, Unit 2 CO. [Jurss, Dave - Unit 2 CO Station Log - Swing Shift]

11/24/2002 15:17 NLOGS01 Wolf, Bob Assumed U2 TurbHall (FireBrigade) Position. [Wolf, Bob - U2 TurbHail (FireBrigade) - Station Log - Swing Shift]

11/24/2002 15:18 NLOGS01 Bressler, Mike Assumed 3rd License Position from Lohr, Tim, 3rd License. [Bressler, Mike - 3rd License Station Log - Swing Shift]

11124/2002 15:18 NLOGS01 Wandrie, Tom Assumed PAB (FireBrigade) Position from LaFountain, Ken, PAB (FireBrigade). [Wandrie, Tom - PAB (FireBrigade) - Station Log - Swing Shift]

11/24/2002 15:28 NLOGSOI Phillips, Scott Assumed Unit 1 CO Position from Post. Bob, Unit I CO. [Phillips, Scott - Unit 1 CO - Station Log - Swing Shift]

11/24/2002 15:29 NLOGS01 Denneau, Scott Assumed U1 TurbHall (FireBrigade) Position from Steuer, Will, UI TurbHall (FireBrigade).

[Denneau, Scott - Ul TurbHall (FireBngade) - Station Log - Swing Shift]

Page 5 of 7