Fax Krohn to Kunowski, NMC Open Issues
ML030800572
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/20/2002
From: Paul Krohn
NRC/RGN-III
To: Michael Kunowski
NRC/RGN-III/DRP/RPB5
References
FOIA/PA-2003-0094
Download: ML030800572 (2)


Text

I NRC FORM 36" oiqr)

C-.*02)

.o.-"To UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 901 Warrenville Road. Suite 295 Lisle, Illinois 6002-5351 TELEFAX TRANSMITTAL DZ DATE:

-7 NUMBER OF PAGES:

(including this page)

I.

SEND TO:

LOCATIaN:

FAX NUMBER:

'Z VERIFYBY CALLING SENDEF FROM:

//

(SENDER)

TELEPH~INE NUMBER:

630 -

FAX NUMBER: 630.-

If you do r ot receive the complete fax transmittal, please contact the sender as soon as possible at the telephone number provided above.

MESSAGI t

/

I o

/Jai NOTICE This messagelI intended onlyforthe use of the individual orentityto which itis addressed and may contain Information tt is privileged, confidential, or exempt from disclosure under applicable law. If the reader of this message s not the intended recipient or the employee responsible for delivering the message to the intended reci l ent, you are hereby notified that any dissemination, distribution or copying of this communicatio* is strictly prohibited. If you have received this communication in error, please notify the sender immeciately by telephone and return the original to the above address, by U.S. Mall. Thank you.

NC FORM 3 OW (2.

tI OV-20-2002 1"71 3U PRtmtW ON RGCYCLM PANER 7%ft frn UL

,j S207554374 I

67 4ý'Icle- /f ý ti Ce-, S /

&A five le-f-I C I *,,r-271rc'.'

126ý

OPEN ISSUES

_WHO WHEN

'COMMENTS Incident Investigation 111 002 IS

. T h om as 1 / 1 2 0 !

On.Line Work Risk Management 1J-. Anderson

-n-oin*CV.

NP 10.3.7, Unplanned Yellow Actions R Woo

-'noin_-

I Ref CA27023 and.CAP30052/Mod requzred forgreen Interim Corrective Actions tLOi

.. -I

_N CA02_6908/Charter Tracking Item ID, Schoon 11127/2002__*

Training Needs Anal.sis and Related Actions I P. Smith 2/2/2003 Ref CAP029999/CA026986-Trng Needs Analysls is corLnleted Condition Evaluationifurther enhancements

___M. Schug 121612002iRef CAP029999/CE10848 Independent Evaluation of Procedure changes D Schoon 11/27/2002 Ref CA0_269_09 - reviewcompletelc.__oplte CA Independent Evaluation of briefings & training D. Shoon 1127/20021 Re_ CA026910 - review oompletelcompleteCA Engineering Resolution Team and RCE

{"

Con_.duct Root Cause Evaluation - Draft Repo-ýr R. Flessne'r 11/18/2002lRef RCE0000191 - first dJra-ft issued_

Conduct Root Cause Evaluation - Final Report l R. Flessner'- 11/26/2002.....

1RFlrisk significance evaluation J. Mesterlda.k 1/29/2003 Reo CA0269_00/Also requires PII inputs Hydraulic system repsponse T Kendall 12115/2002.CA02696.11-PIt final report expected 12/20/02 I _

Develop a test plan T. Kendall TBD CA02-692 - PII/PSA/Engr-repmains under consideration,__.

Analyze corrosion products

/2003__.

CA026913-Pit final report expected 12/20/02 I

A.FW. sources and quanity ofcorrosion products B. Zpp 1/20/2003 CA026914 - Pil final repoer expected 12120/02 McdiLcahions to onficedesign-J. McNarnara 112/132302 Ref CA026918 Fabrication

_1J.-McNamara"

_1"i7/20026 week from 11/12 Is December 17 Testing 1 IJ. McNamara TBD Coordination Installation

_____McNamara,TBD Planning for Coordination of work schedule with staton J.

ThMclama Tr alY3 week schedule process. -inpu OPROOP0031Part II/Schedule for correction due I__

cNa....

1 Part II of 00 31 NEWV-E -ect-ril--' ides-ign m -od -icah-ions --

!M. Rosseau TBD

!Scope, schedule, etc (Chnt Drescher as desiglner)

T 1>

m lN