Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17244A53525 May 1979Forwards LER 79-011/01T-0
ML17244A53720 April 1979Confirms 790420 Telcon W/W Lasurus Re LER 79-10,boric Acid Storage Tanks out-of-spec for Vol & Weight.Orderly Load Reduction Initiated to Restore Tanks to Required SpecsBoric Acid
ML17244A53828 April 1979Responds to IE Bulletins 79-06A & 79-06A,Revision I, Review of Operational Errors & Sys Misalignments Identified During TMI-2 Incident. Plant Procedures Are Being Reviewed & UpdatedBoric Acid
ML17244A53929 May 1979Forwards Offsite Dose Calculating Manual
ML17244A54316 April 1979Confirms 790416 Telcon to W Raymond Reporting LER-79-09, Boric Acid Storage Tanks Out of Spec for Vol & Weight of Boric Acid.Orderly Load Reduction & Batching Operations Commenced;Tanks within SpecsBoric Acid
ML17244A54430 April 1979Forwards Response to IE Bulleitn 79-04,Incorrect Weights for Swing Valves Mfg by Velan Engineering Corp. Valves Used insafety-related Sys Are in Close Proximity to Pipe Supports.No Mods Planned
ML17244A54625 April 1979Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Confirms Capability of Plant to Withstand Seismic Event
ML17244A55614 June 1979Forwards Endorsements 49,50 & 51 to Maelu Policy MF-47 & Endorsements 60 & 61 of Nelia Policy NF-170
ML17244A55714 June 1979Responds to NRC 790606 Ltr Requesting Info Re Systematic Evaluation Program Topic VI-I.Suggests NRC Review Info Already Docketed,Including FSAR App 6E & Discussion of Reg Guide 1.54 in Util 731220 Ltr
ML17244A55818 June 1979Forwards Addl Info Re PWR Feedwater Lines in Response to NRC 790525 request.W/3 Oversized DrawingsHydrostatic
Flow Induced Vibration
ML17244A55914 June 1979Notifies Replacement of Computer Room Ceiling Is Delayed Until 790831
ML17244A56020 June 1979Forwards LER 79-012/01T-0
ML17244A56920 June 1979Requests Notification of Date for Meeting W/Nrc to Discuss Computer Models Which Reflect Upper Plenum Injection of ECCS
ML17244A57018 May 1979Responds to IE Bulletins 79-06A & 79-06A,Revision 1.No Tech Spec Changes Required at This Time.Change Will Be Requested When Design & Safety Evaluations Are Prepared
ML17244A57111 May 1979Confirms 790510 Discussion W/D Beckman Re LER 79-011.New Valve Internals Being Mfg to Correct Problem.Will Be Available in June
ML17244A57325 June 1979Notifies Revision 6 to Suppl IV of full-term License Application Will Be Submitted in Early July,As Requested by NRC 790605 Ltr.Revision 6 Will Exclude Reg Guide 1.94 from Listing of ANSI Stds
ML17244A57527 June 1979Forwards Summary of Status of Mods & Insp Program Re 731101 Evaluation of OL Effects of Postulated High Energy Line Breaks Outside Containment.All Mods Completed & Inservice Insp Program InitiatedBoric Acid
ML17244A57618 May 1979Requests Extension to 790801 for Response to IE Bulletins 78-12A & 78-12B
ML17244A57725 May 1979Responds to IE Bulletin 79-10, Requalifiction Training Program Statistics. Forwards Util Requalification Training Program Statistics
ML17244A58029 June 1979Responds to Item 3.2.7 of Fire Protection Safety Evaluation Dtd 790214.Performance Tests on Two Fire Pumps Conducted on 790516.Presently Analyzing Test Methods & Instrumentation
ML17244A58118 May 1979Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Installed or Planned for Use in safety-related Sys at Facility
ML17244A5852 July 1979Forwards Inservice Insp Program for 1980-89 (App B of QA Manual)
ML17244A5882 July 1979Responds to NRC 781129 Ltr Re Containment Purging During Normal Plant Operation.Discusses Mfg Analyses & Confirmation That Containment Isolation Valves Will Close Under Postulated Design Basis Accident
ML17244A58912 June 1979Forwards Monthly Operating Rept for May 1979
ML17244A6016 July 1979Responds to 790618 Request Re Info Available to Control Room Operator to Indicate Status of Class IE Batteries,Associated Chargers & Direct Current Buses
ML17244A6046 July 1979Forwards Addl Info Re Pressure Shielding Steel Diaphragm, in Response to Questions Raised During Review of Util 790517 Submittal
ML17244A60510 July 1979Forwards LER 79-012/01X-1
ML17244A61316 July 1979Forwards Addl SEP Seismic Review Info Including Summary Analysis of Equipment Inside Containment,W/Tank & Foundation Drawings for Diesel Generator Air Tanks,Boric Acid Storage Tanks & Refueling Water Storage Tank.Encl in Central FilesBoric Acid
Earthquake
ML17244A6911 June 1979Submits Addl Info to Encl B&W 790313 Response Re IE Bulletins 78-12A & 78-12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Forwards Vendor 790313 Ltr to Westinghouse.Util Maintains Requirements Met
ML17244A70719 July 1979Responds to 790620 Telcon Request.Forwards NPDES & Permit Supporting Info
ML17244A71223 July 1979Forwards LER 79-013/01T-0
ML17244A72326 July 1979Responds to NRC 790611 Ltr Requesting Addl Info Re Westinghouse Small Break LOCA Analysis.Relevant Westinghouse Rept Was Transmitted to NRC W/C Reed 790629 Ltr to DF Ross
ML17244A72525 July 1979Confirms 790724 Telcon.Compilation of Info Re Mgt & Technical Staffs Will Be Completed by 790814
ML17244A72625 July 1979Forwards Review Fee for Safeguards Contingency Plan Submitted on 790323
ML17244A73227 July 1979Discusses Reasons for Delay from July 1979 to 791001 for Installation of Curbs in Screenhouse Around Diesel Fire Pump Area
ML17244A73512 July 1979Responds to IE Bulletin 79-13, Cracking in Feedwater Sys Piping, Item 5.Feedwater Nozzle Inspected & Evaluated. Emergency Procedures Adequately Cover Feedwater Line Break Accident
ML17244A7376 July 1979Responds to IE Bulletin 79-02 Re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Discusses Base Plate Flexibility,Safety Factors,Cyclical Loads & QC DocumentationSafe Shutdown
ML17244A74325 June 1979Responds to IE Bulletin 79-11 Re Faulty Overcurrent Trip Devices in Westinghouse Type DB-75 & DB-50 Circuit Breakers for Engineered Safety Sys.Numerous Devices Presently Installed at Plant
ML17244A74422 June 1979Responds to IE Bulletins 79-06A & 06A,Revision 1, Review of Operational Errors & Sys Misalignments Identified During TMI Incident.Boric Acid
ML17244A7507 August 1979Forwards LER 79-015/01T-0
ML17244A75210 August 1979Forwards Endorsement 62 to Nelia Policy NF-170 & Endorsement 52 to Maelu Policy MF-52
ML17244A7538 August 1979Forwards LER 79-014/03L-0
ML17244A76313 August 1979Forwards Monthly Operating Rept for Jul 1979
ML17244A76611 July 1979Confirms 790710 Telcon Rept Re Cracking Found in Feedwater Lines.Final Rept Will Be Submitted within 30 Days
ML17244A76716 August 1979Responds to Conversation W/Nrc Re Dependence of Turbine Driven Auxiliary Feedwater Sys on Ac Power & Request to Commit to Demonstrate Operability of Sys W/O Reliance on Ac Power.Believes No Sys Changes Necessary
ML17244A76816 August 1979Forwards LER 79-016/01T-0
ML17244A77827 July 1979Forwards Response to IE Bulletin 79-13 Re Cracking in Feedwater Piping.Forwards 30-day Rept on Examniation, Evaluation & Corrective Action Taken at PlantNondestructive Examination
Liquid penetrant
ML17244A77926 July 1979Forwards Supplemental Response to IE Bulletin 79-02 Re Pipe Support Base Plate Designs Using Concrete Expansion Bolts. Submits Info Re Testing & Replacement Program,Base Plate Flexibility & Replacement ProgramSafe Shutdown
Boric Acid
ML17244A78216 August 1979Forwards Statement Released to Media on 790815 Re Claim Brought Against Util by Contractor Employee Claiming Injury Due to Overexposure to Radiation.Damages of $5 Million Sought
ML17244A78524 July 1979Confirms Discussion W/D Beckman & R Markowsky Re 790724 Rept of LER 79-015.Pipe Supports in Containment Vessel Identified as Nonconforming to Original Design Drawings.Supports to Be Reworked to Original Design Requirements