REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIPS)

ACCESSION NBR:7907090253

-JOC ~ DATE: 79/07/02 NOTARI D:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant~ Unit li Rochester G

AUTH.NAME AUTHOR AFFILIATION NHITE p L D ~

Rochester Gas 8

El ectri c Cor p, REC IP ~NAME, RECIPIENT AF F IL I ATION ZIEMANNrD,L, Oper ating Reactors Br anch 2

DOCKET 05000244 SUBJECT; Responds to NRC 781129 1 tr re containment purging dur ing normal plant operation, Discusses mfg analyses 8 confirmation that containment ssolation valves will close under postulated design basis accident.

DISTRIBUTION CODE:

A034S COPIES RECEIYED:LTR 9 ENCL d SIZE:

TITLE: Containment Pur ging NOTES: gy Z'ZDP<ACEr--<. &tC8+O'E~

RECIPIENT COPIES RECIPIENT ID CODE/NAME LTTR ENCL ID CODE/NAME Mneme WMMta&wMO WMWMWtWMMM

\\

COPIES LTTR ENCL ACTION:

05 yaw INTERNAL:

0 12

~15 17 19 21 23 BC dR8 ~W REG F IL CORE PERF BR ENGR BR PLANT SYS BR EFLT TRT SYS C

GRIMES 02 NRC PDR 14 TA/EDO 16 AD SYS/PROJ 18 REAC SFTY BR

?0 EEB I

22 BR INKMAN 24 E

REEYES EXTERNAL: 03 LPDR 25 ACRS 1

16 1

04 NSIC JUL 10 197S C0 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 40 ENCL

F) 4

f I//fllil/////I/

'Il/Ef//ItS'/I//

Ilt //////////Zr RIV IIll~ IIaO IEAIE ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.

VICE PRESIDENT TEI.EPNONE AREA COCE 7IE 546-2700 July 2, 1979 Director of Nuclear Reactor Regulation Attention:

Nr. Dennis L. Ziemann, Chief Operating Reactors Branch No.

2 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Containment Purging During Normal Plant Operation R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear llr. Ziemann:

Your letter dated November 29, 1978 requested restrictions be placed on containment purging during normal operation and an evaluation of the ability of the containment isolation valves to close under postulated design basis accident conditions be performed.

Our letter of January 2,

1979 placed restrictions on purging during normal operation, as required, and stated an evaluation of valve closure would be completed by July 2, 1979.

An evaluation of the ability of the containment purge valves to close during accident conditions has been made.

The valve specifications require the valves to close during no flow conditions within a specified time.

The valve manufacturer has performed a

review of the design of our valves and of model tests and has confirmed that the valves will close as fast or faster under flow conditions than they do under no-flow conditions.

We are presently performing additional analyses of the integrity of the valve to assure its continued integrity following post-accident closure.

We will inform you of the results of these analyses upon their completion.

Very truly yours, L. D. White, Jr.