Submits Addl Info to Encl B&W 790313 Response Re IE Bulletins78-12A & 78-12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Forwards Vendor to Westinghouse.Util Maintains Requirements Met
ML17244A691
Person / Time
Site: Crystal River, Ginna  Constellation icon.png
Issue date: 06/01/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A692 List:
References
NUDOCS 7907230481
Download: ML17244A691 (4)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION I~I~

gag ~ yaI a~

o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.

VICE RRKSIOKNT TKLKRHOWK AREA COOK Tld 546.2700 june 1, 1979 Mr. Boyce H. Grier., Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

IE Bulletins No.78-12A and 78-12B, Atypical Weld Material in Reactor Pressure Vessel Welds R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244

Dear Mr. Grier:

We have been informed by our contractor, Westinghouse Electric Corporation, that on March 13, 1979 Babcock and Wilcox Company sent a report on their investigation into the atypical weld metal in reactor pressure vessels fabricated at their Mt. Vernon, Indiana plant to Mr. Wayne G.

Reinmuth, Office of Inspection and Enforcement.

This report covers on a generic basis the weld materials utilized in vessel fabrication from 1966 through November, 1978, which is inclusive of the time the R. E. Ginna vessel was fabricated.

The results are that the Crystal River 3 atypical chemistry condition is an isolated event involving a small amount of mate-rial in one heat of wire.

Included with this letter are copies of the letters from Babcock and Wilcox Company to Mr. Wayne G. Reinmuth, USNRC, and Mr. G. W. Lamb of Westinghouse Electric Corporation, which document the report being sent to the NRC covering the vessels built under contract by Babcock and Wilcox to Westinghouse.

The R. E. Ginna vessel was built under BGW Contract No. 610-0110 and purchased under Westinghouse Purchase Order No. 54-F-49758-BP.

Therefore, based on the generic report presented by Babcock and Wilcox in the transmittal to NRC on March 13, 1979, Rochester Gas and

0

ROCHESTER GAS AND ELECTRIC~.

DATE June 1, 1979 Mr. Boyce H. Grier, Director SHEET NO.

2 Electric has satisfied'the requirements of IE Bulletins78-12A. and 78-12B.

If y'ou have any further questions please do not hesitate in contacting us.

Very truly yours,

~.p.

Att.

xc: U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction 1nspection Washington, D. C.

20555