REGULATORY ORMATION DISTRIBUTION SY' (RIDS)
ACCESS I.ONWGR: 7908030383 DOC, DATE: 79/07/27 NOTARIZED:
NO DOCKET FACIL:SO-2AQ Robert Emmet Ginna'uclear Planti Unit 1i Rochester G
05000244 AUTH~NAME AUTHOR AFFILIATION WHITE,L,D, Rochester Gas 8 Electric Corp, REC IP e NAME RECIPIENT AFFILIATION Z IEMANNg D ~
Operatina Reactors Branch 2
SUBJECT:
Discusses reasons for delay from July 1979 to 791001 for installation of curbs in screenhouse around diesel fire pump
- area, DISTRIBUTION CODE:
A006S COPIES RECEIVED:LTR g
ENCL ~
SIZE:'ITLE:
FIRE PROTECTION INFORMATION (AFTER ISSUANCE OF OP,LIC
)
NOTES'etlaMWwtee%wmWPS+ApWWM~WWM~MMMWWWmmWWMMWmWMOOWWefMmaIMWW&wwewMWmehWWaeWww&MMHMtahsletW h
RECIPIENT ID CODE/NAME ACTION:
05 BC oRS g-INTERNAL,:
0 09 18E 12 AUXIL SYS BR 19 NAMBACH 21 AD SYS/PROJ COPIES RECIPIENT LTTR ENCL "ID CODE/NAME 02 NRC PDR 11 TA/EDO 14 PLANT SYS BR 20 MURANAKApR OELD COPIES LTTR ENCL 1
5 1
1 EXTERNAL: 03 LPDR 22 ACRS 1
16 1
OLI NS I C 5 H-RPRvc~
c-Hopg~~
IUG p jg7g o
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL gg
1
1 jkl>>iten jjjjjIjjjjjjj
~jZij(jj~i li~uIII'OCHESTER GAS AND ELECTRIC CORPORATION
~
89 EAST AVENUE, ROCHESTER, N.Y. 14649 I.EDN D. WHITE, JR.
VICE PRESIDENT TELEPHONE AREA CODE TIS 546-2700 July 27, 1979 ltmllkMÃ7flM(DFiK ll(P)
Director of Nuclear Reactor Regulation Attention:
Mr. D. Ziemann, Chief Operating Reactors Branch 52 Division of Operating Reactors U.S. Nuclear Regulatory Commission washington, D.C.
20555 Re:
Fire Protection at R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Ziemann:
Item 3. 1. 4 in dated February 14, screenhouse around completion date of the Fire Protection Safety Evaluation Report 1979 requires curbs to be installed in the the diesel fire pump area.
Ne had agreed to a
- July, 1979 for this curb.
.Although the actual installation time required for this curbing will be relatively short and all of the preliminary engineering has been completed, we have found that the final engineering time has been displaced due to other pressing require-ments such as investigating and answering IE Bulletins 79-02 and 79-14.
This installation completion date will have to be extended to October 1, 1979.