Discusses Reasons for Delay from July 1979 to 791001 for Installation of Curbs in Screenhouse Around Diesel Fire Pump Area
ML17244A732
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/27/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7908030383
Download: ML17244A732 (4)


Text

REGULATORY ORMATION DISTRIBUTION SY' (RIDS)

ACCESS I.ONWGR: 7908030383 DOC, DATE: 79/07/27 NOTARIZED: NO DOCKET FACIL:SO-2AQ Robert Emmet Ginna'uclear Planti Unit 1i Rochester G 05000244 AUTH~NAME AUTHOR AFFILIATION WHITE,L,D, Rochester Gas 8 Electric Corp, REC IP e NAME RECIPIENT AFFILIATION Z IEMANNg D ~ Operatina Reactors Branch 2

SUBJECT:

Discusses reasons for delay from July 1979 to 791001 for installation of curbs in screenhouse around diesel fire pump area, DISTRIBUTION CODE: A006S COPIES RECEIVED:LTR g ENCL FIRE PROTECTION INFORMATION (AFTER ISSUANCE

~ SIZE:'ITLE:

OF OP,LIC )

NOTES'etlaMWwtee%wmWPS+ApWWM~WWM~MMMWWWmmWWMMWmWMOOWWefMmaIMWW&wwewMWmehWWaeWww&MMHMtahsletW h

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL "ID CODE/NAME LTTR ENCL ACTION: 05 BC oRS g-INTERNAL,: 0 02 NRC PDR 1 09 18E 11 TA/EDO 12 AUXIL SYS BR 14 PLANT SYS BR 5 19 NAMBACH 20 MURANAKApR 1 21 AD SYS/PROJ OELD 1 EXTERNAL: 03 LPDR 1 OLI NS IC 22 ACRS 16 1 5 H-RPRv c~

c- Hopg~~

IUG p jg7g TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL o

gg

1 1

jkl>>iten jjjjjIjjjjjjj

~jZij(jj~i li~uIII'OCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 I.EDN D. WHITE, JR. TELEPHONE VICE PRESIDENT AREA CODE TIS 546-2700 July 27, 1979 Director of Nuclear Reactor Regulation ltmllkMÃ7flM(DFiK ll(P)

Attention: Mr. D. Ziemann, Chief Operating Reactors Branch 52 Division of Operating Reactors U.S. Nuclear Regulatory Commission washington, D.C. 20555 Re: Fire Protection at R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Ziemann:

Item 3. 1. 4 in the Fire Protection Safety Evaluation Report dated February 14, 1979 requires curbs to be installed in the screenhouse around the diesel fire pump area. Ne had agreed to a completion date of July, 1979 for this curb.

.Although the actual installation time required for this curbing will be relatively short and all of the preliminary engineering has been completed, we have found that the final engineering time has been displaced due to other pressing require-ments such as investigating and answering IE Bulletins 79-02 and 79-14. This installation completion date will have to be extended to October 1, 1979.

Very truly yours, L., D. Hhit , Jr.