Issue date | Title | Topic | |
---|---|---|---|
ML080250274 | 24 January 2008 | Oconee - Handouts from 1/24/08 Meeting | Operability Assessment |
ML080460154 | 30 January 2008 | 01/30/2008 Slides Used During Dseis Meeting Related to the License Renewal Review of Shearon Harris Nuclear Power Plant | License Renewal Environmental Justice |
ML080700175 | 3 March 2008 | Nrc/Duke Energy Meeting, DPC-NE-2015-P, Oconee Nuclear Station, Mark-B-HTP Fuel Transition Methodology | |
ML080840040 | 18 March 2008 | Duke Handout from 03/18/08 Meeting | Cyber Security |
ML080880076 | 27 March 2008 | Slides from 3/27/2008 Meeting | |
ML080940010 | 27 March 2008 | Public Meeting Slides for 03/27/08, Plant Status Update | |
ML081270222 | 29 April 2008 | Rps/Esps Digital LAR, Oconee Nuclear Station, Non-Proprietary Material | |
ML081550266 | 20 May 2008 | Harris Slides, NRC Annual Assessment Meeting | Weld Overlay Siren |
ML081550275 | 20 May 2008 | NRC Slides - Annual Assessment Meeting | License Renewal |
ML081840731 | 20 June 2008 | NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned | Hemyc |
ML081840735 | 20 June 2008 | NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned | |
ML081840744 | 19 June 2008 | NFPA-805 Workshop Handouts - Oconee NFPA-805 Lessons Learned | Safe Shutdown |
ML081980646 | 10 April 2008 | Public Meeting Slides, Oconee Nuclear Station Annual Assessment Meeting - Reactor Oversight Program - Cy 2007. | B.5.b Foreign Material Exclusion Power change |
ML081990367 | 15 July 2008 | Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion | |
ML082050378 | 16 April 2008 | April 2008 Observation Visit - Oconee - Pilot Plant Transition to NFPA 805 - FSAR 9.5.1 Revision | Probabilistic Risk Assessment Fire Protection Program |
ML082050386 | 14 April 2008 | April 2008 Observation Visit - Oconee/Shearon Harris - Pilot Plant Transition to NFPA 805 - F and O Resolution/Peer Review | |
ML082050390 | 15 April 2008 | April 2008 Observation Visit - Shearon Harris - Pilot Plant Transition to NFPA 805 - Fire Safety Analysis/Change Evaluation Update | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Hemyc |
ML082050402 | 16 April 2008 | April 2008 Observation Visit - Shearon Harris -Pilot Plant Transition to NFPA 805 - Performance Monitoring Program | Fire Barrier Emergency Lighting Fire Watch |
ML082050407 | 11 April 2008 | April 2008 Observation Visit - Shearon Harris - Pilot Plant Transition to NFPA 805 - Performance Criteria | Fire Barrier |
ML082070391 | 17 July 2008 | Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 | Safe Shutdown Fire Protection Program |
ML082350410 | 21 August 2008 | Meeting Slides - Enclosure 2 | |
ML082550290 | 28 August 2008 | Meeting with Duke Energy Carolinas, Oconee Flood Protection and the Jocassee Dam Hazard | Significance Determination Process |
ML082960153 | 17 November 2008 | Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request | Probabilistic Risk Assessment Operator Manual Action Emergency Lighting Hemyc Fire Protection Program |
ML083080005 | 31 October 2008 | Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit | B.5.b License Renewal Dissimilar Metal Weld Power change Siren Power Uprate |
ML083470022 | 11 December 2008 | Slides, Category 2 Public Meeting Digital Instrumentation and Control Steering Committee | Cyber Security Power Uprate |
ML090300249 | 29 January 2009 | Oconee Regulatory Conference, Unanticipated Reduction in Unit 1, RCS Inventory During Shutdown Conditions | Slow transfer |
ML091030172 | 9 April 2009 | External Flooding Briefing for Commissioner Jaczko | |
ML091050332 | 3 April 2009 | Encl. 5 to Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 | |
ML091260069 | 6 May 2009 | Lessons Learned Using Digital I&C Interim Staff Guidance Workshop | Cyber Security |
ML091260076 | 6 May 2009 | Lessons Learned Using Digital I&C Interim Staff Guidance Workshop Application of ISG-4 During Wolf Creek and Oconee Reviews | |
ML091280311 | 8 May 2009 | Summary of Public Meeting/Open House to Discuss the Annual Assessment of Oconee Nuclear Station | |
ML091330029 | 6 May 2009 | Meeting Slides, Oconee Rps/Esps Digital Upgrde Licensing Experience | Cyber Security |
ML091380424 | 11 May 2009 | Slides for Closing Meeting May 11, 2009 with Duke on the Oconee Flooding Issue | Earthquake |
ML091380434 | 15 April 2009 | Meeting Slides, SM-0902 Txs Rte Param Change Enable, Overview | |
ML091380436 | 15 April 2009 | Meeting Slides, Teleperm Xs Permissions and Operating Modes | |
ML091590494 | 6 May 2009 | Duke Energy Slides from Public Meeting with Duke Energy to Discuss a Proposed License Amendment for the Use of a Fiber-Reinforced Plymer (FRP) System | Commercial Grade Dedication Coatings Tornado Generated Missile |
ML091590555 | 5 June 2009 | Summary of Category 1 Public Meeting to Discuss Annual Assessment of Shearon Harris Nuclear Plant, Unit 1 | B.5.b |
ML091660504 | 24 June 2009 | 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 | Hot Short Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Continuous fire watch Fire Watch |
ML092290034 | 17 August 2009 | 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective | Fire Protection Program |
ML092380305 | 27 August 2009 | Slides for Closed Meeting Regarding External Flood Technical Meeting on August 27, 2009 | |
ML093080034 | 28 October 2009 | Slides for Oconee Nuclear Station, Units 1, 2, and 3 - Meeting Slides - External Flood NRC Technical Meeting | |
ML101050522 | 15 April 2010 | NRC Slides - Oconee Annual Assessment Mtg | |
ML101050524 | 15 April 2010 | Assessment Mtg. - Tritium Facts | Exit Sign |
ML101120176 | 22 April 2010 | Meeting Slides, Duke Energy Carolinas, Major Project Plans for April 22, 2010 Meeting | Fire Barrier TORMIS License Renewal |
ML101410271 | 18 May 2010 | Shearon Harris Nuclear Plant Annual Assessment Meeting Slides | |
ML102020020 | 20 July 2010 | Summary of Public Meeting with Oconee, to Discuss Safety Significance of Two Preliminary Greater than Green Findings with Two Associated Apparent Violations and Severity Level of One AV Considered for Potential Escalated Enforcement | Condition Adverse to Quality Operability Determination |
ML103480707 | 14 December 2010 | Public Meeting Summary - Duke Quality Assurance Program Discussion Meeting | |
ML110040408 | 10 September 2009 | Buried Piping Inspection Program, IP2 CST Return Line Piping (ACRS - 09/10/09) | Aging Management License Renewal |
ML110180609 | 5 January 2011 | Enclosure 1, Oconee Nuclear Station, Major Project Plans | Safe Shutdown B.5.b Mitigating Strategies |
ML110180661 | 5 January 2011 | Enclosure 2 (Part 1) - Major Projects Slides | Fire Barrier |