Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20125B400 | 26 April 1970 | Discusses Items Re Request for Div of Compliance Insp Repts for Util | |
ML20125B409 | 3 August 1972 | Provides Response to Inquiry Re Bypassing of Engineered Safety Feature at Plant | Reactor Vessel Water Level |
ML20125B412 | 11 July 1972 | Lists Facility Licensees Due to Be Billed for Annual Fees for Months of Jul,Aug & Sept 1972 | |
ML20125B873 | 14 June 1972 | Discusses Review of Facility Preliminary Detailed Environ Statement.No Gross Errors Uncovered in Dose Evaluations | |
ML20125B876 | 18 July 1972 | Requests Assistance in Resolving Certain Comments Received on Draft Environ statement,specifically,720710 Ltr from EPA | |
ML20125B878 | 18 December 1972 | Forwards Review of QA Program for Operations | |
ML20125B882 | 19 May 1972 | Informs That Only Item Needed for Preparation of Radiological Impact Portion of Environ Statement Is Numerical Source Term | |
ML20125B886 | 24 August 1972 | Forwards Special Rept on Operation of Northern States Power Co,Monticello Reactor Facility, Conducted on 720804 | |
ML20125B891 | 4 May 1972 | Forwards Realistic Accident Section for Plant Des.Changes Should Be Communicated to E Adensam | Fuel cladding |
ML20125B905 | 12 May 1972 | Forwards Radwaste Section for Environ Statement | |
ML20125B909 | 20 March 1973 | Forwards Second Draft of full-term OL for Plant.Conditions for Protection of Environ Not Included in Draft | |
ML20125B913 | 21 December 1973 | Requests Comments on Encl Proposed ETS by 740125.W/o Encl | |
ML20125B914 | 24 August 1973 | Forwards Orders & Notices of Availability W/O TS Changes Re Fuel Densification for Listed Plants.W/O Encls | |
ML20125B917 | 17 January 1973 | Discusses Conversion of Provisional Operating License to full-term Operating License Under Provisions of 10CFR20.57(a) | |
ML20125B921 | 26 December 1973 | Requests That Listed Actions Be Taken Re Radiological Monitoring Program | |
ML20125B922 | 16 September 1974 | Discusses Review of Applicant Proposed ETS for Plant. Deficient Areas within TS Noted | |
ML20125B924 | 12 September 1974 | Forwards Proposed Meteorological Section for ETS Being Developed for Plant | |
ML20125B930 | 4 January 1973 | Informs That an Evaluation & Finding Re Financial Qualifications Was Necessary Re Review of full-term License for Util | |
ML20125B938 | 20 November 1969 | Comments on General Conclusion Re Problems Involved in Complying W/Mpca Water Disposal Permit for Util | |
ML20125B946 | 23 June 1970 | Forwards Suppl Insp Program for Sensitized Stainless Steel Matls & Welds | |
ML20125B959 | 9 March 1978 | Notification of 780314 Meeting W/Util & GE in Bethesda,Md to Resolve Structural Issues Re Review of GE High Density Fuel Storage Sys at Plant | |
ML20125B962 | 14 November 1969 | Forwards Evaluation of Instrumentation,Control & Auxiliary Electric Power Sys for Inclusion in Rept Being Prepared for Consideration at Dec Meeting | |
ML20125B967 | 15 May 1978 | Discusses Staff Actions in Response to Deficiencies in Connector Splices at Plant on 780510 | |
ML20125B972 | 10 May 1978 | Discusses Status of Facility Electrical Splice Upgrade | |
ML20125B979 | 26 April 1978 | Discusses Staff Actions in Response to Deficiencies in Connector Splices at Facility | |
ML20125B985 | 19 November 1970 | Discusses Burial of Radwaste in Minnesota | |
ML20125B994 | 11 May 1971 | Forwards Change 1 to TS for Util Re Protection Factors for Use of Respiratory Equipment | High Radiation Area |
ML20125B997 | 16 January 1978 | Notification of 780209 Meeting W/Util & GE in Bethesda,Md to Discuss Selection of Fuel Parameter to Appear in TS | |
ML20125C475 | 16 February 1973 | Informs That Listed Changes Should Be Indicated on Errata List for Plant Fes | |
ML20125C486 | 13 July 1978 | Discusses Proposed ETS for Plant.Failure to Follow Up on Fes Recommendations Could Make Agency Vulnerable in Hearing Situation Associated W/Ftol Issuance | |
ML20125C510 | 12 October 1976 | Notification of 921028 Meeting W/Util in Bethesda,Md to Discuss Requested Exemption to Requirements of 10CFR50, App J | |
ML20125C521 | 2 March 1978 | Notification of 790309 Meeting W/Mark I Owners Group in Bethesda,Md to Discuss Changes in Mark I Long Term Plan as Reflected in Rev 3 to Mark I Owners Group Program Action Plan | |
ML20125C523 | 14 June 1967 | Forwards Ltr W/Newspaper Clipping from FE Klein Submitting Action Deemed Necessary | |
ML20125C551 | 16 January 1978 | Notification of 780126 Meeting W/Util & GE in Bethesda,Md to Discuss Selection of Fuel Parameter to Appear in TS | |
ML20125C553 | 28 January 1971 | Forwards Amend 1 to Indemnity Agreement B-42.W/o Encl | |
ML20125D693 | 19 February 1970 | Informs of Proposed Addl TS That Could Be Included in Plant Provisional OL | |
ML20126A264 | 10 December 1992 | Advises That Response to Suppl 1 to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys Acceptable | High Radiation Area Fire Barrier |
ML20126B174 | 27 September 1973 | Discusses Util Response to AEC Concern for Possibility That Flooding Could Prevent Safe Shutdown of Reactor or Prevent Engineered Safety Sys from Performing Emergency Function Following Postulated Accidents | Safe Shutdown |
ML20126C133 | 26 February 1976 | Requests Technical Assistance Re Acceptability of Util Radiological Assessment of Cask Drop | |
ML20126C137 | 2 March 1976 | Requests Addl Info Re Rept Entitled, Analysis & SE of Spent Fuel Shipping Cask Handling at Monticello Generating Plant | Safe Shutdown Earthquake Earthquake |
ML20126C146 | 24 July 1978 | Suggests Board Be Informed of Monticello Exemption Requests | Safe Shutdown Anticipated operational occurrence Hydrostatic Operating Basis Earthquake Exemption Request Earthquake |
ML20126C163 | 2 April 1976 | Forwards SE Accepting Util Request for Change in Main Steam Isolation Pressure Setpoint Value & Operating Min Critical Power Ratio Limits | |
ML20126C168 | 4 March 1976 | Forwards Draft Rept, Air Pathway Exposure Model Validation Study at Monticello Nuclear Generating Plant. W/O Encl | |
ML20126C187 | 8 March 1977 | Forwards SE Accepting Proposed Pumpback Sys for Plant | |
ML20126C206 | 11 March 1976 | Discusses Evaluation of Meteorological Assumptions Made by Util in Cask Drop Analysis for Plant & Concludes That Util Use of Atmospheric Conditions Described in Reg Guide 1.3 Will Result in Conservative X/Q Values | |
ML20126C208 | 17 March 1976 | Requests Technical Assistance Re Util Proposed Change to TS to Permit Permit Installation of New Containment Isolation Valve as Part of Proposed Nitrogen Recirculation Sys | |
ML20126C211 | 18 March 1976 | Forwards Comments on EPA Draft Rept, Air Pathway Exposure Model Validation Study at Monticello Nuclear Generating Plant | |
ML20126C213 | 19 March 1976 | Forwards Comments from Review of Draft Rept of EPA Plume at Plant | |
ML20126C216 | 22 March 1976 | Responds to Continuation of ORB-2-210 - Monticello Spent Fuel Cask Drop | |
ML20126C223 | 8 April 1976 | Forwards 760325 Memo Which Identifies Potential for Fuel Damage by Operator Error in Either Reactor Cavity of Fuel Pool of GE Bwrs,For Review |