Forwards 760325 Memo Which Identifies Potential for Fuel Damage by Operator Error in Either Reactor Cavity of Fuel Pool of GE Bwrs,For Review
ML20126C223
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/08/1976
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20126C227 List:
References
NUDOCS 9212220426
Download: ML20126C223 (1)


Text

su !

. Y ' .

UN11[D STMCS NUCLEAH HECUtATOHY COMMi$SION n[CloN 111 ,

I 199 Roo$tVELT McAo GLEN ELLYN,ILLINoin 6D8 37 )

April 8, 1976 l K. V. Seyfrit Chief, Reactor Technical Assistance Branch Office of Inspection and Enforcement, llcadquarters TilRUy .S< Fiore111, Chief, Reactor Operations and f D Nucicar Support Branch NORTilERN STATES POWER (MONTICELLO)

DOCKETNO.40_-$33 BWR REFUELING BRIDGE The attached memorandum from Mr. Ilunter of this office identifics a potential for fuci damage by operator error in either the reactor cavity or fuel pool (.f CE BWRo. I_n the specific instance identified,-a new fuel assembly was damaged, therefore, there were no radiological consequences.

It is recognized that the consequences of fuct damage resulting from-excessive movement of the refueling bridge and/or trolley while withdrawing or inserting an irradiated fuel assembly are within the refueling accident-analys!s. Our concern is that the probability ot damage due to operator

~

error may be higher than we should accept. Refueling bridge end trolley drives in Westinghouse plants are interlocked to reduce the probability of fuel _ damage due .to operator error.

As discussed with you by telecon on April 7. 1976, we request a review of this matter cc appropriate. Mr. Hunter and others of this offico can be made available for detailed discussion of refueling practices, experiences and interlock functions.

I

(}

'. LVJordan, Chief

Reactor Projects Section 2 :

Attachments l:

i Memo,11unter to Jordan, dtd 3/25/76 i

cc'w/ attachments

. -R. F. Warnick Regional ^ Coordinator '

! IE Files- ,

j_ ~ Central Files.

. J.-G._Keppler, Regional Director--

l R. C. Knop, IE III .

l W. S. Little, IE III' l N. C. Chou 3cs. IE III l D. R. Ilunter, IE:III I