Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19207B97131 August 1979Submits Interim Rept Re Nuclear Instrumentation & Reactor Protection Sys Grounding Concern.Procedures for B&W Test Spec 62-1005067-00 & Subsequent Testing Will Be Released for Use by 800104
ML19207C4577 September 1979Forwards Bechtel 790831 Rept Re Impact Testing of Main Feedwater Pipe.Addl Rept Will Be Provided by 791026
ML19207C51114 August 1979Forwards Supplemental Info in Response to IE Insp Repts 50-329/79-12 & 50-330/79-12
ML19207C51220 July 1979Responds to NRC 790619 Ltr Re Violations Noted in IE Insp Repts 50-329/79-12 & 50-330/79-12.Corrective Actions:Audit Conducted in May 1979 W/Five Findings Issued & Ref to Paragraph 58 in Welding Procedure M-B-QCP22 CorrectedHydrostatic
ML19208A40630 July 1979Notifies That Recently Shipped Batteries Probably Will Not Meet Requirements of IEEE Stds 323-74 & 344-75
ML19208A71412 September 1979Forwards LER 79-025/01T-0
ML19208A99712 September 1979Forwards Monthly Operating Rept for Aug 1979
ML19208B42717 September 1979Forwards Inservice Insp/Examination Summaries:Special Feedwater Piping examination,790607-11 & Second Special Feedwater Piping examination,790711-31
ML19208B5741 August 1979Provides Supplemental Response to Deviations Noted in IE Insp Repts 50-324/79-17 & 50-325/79-17.Corrective Actions: Automatic Sprinkler Sys Repositioned,Fire Detector Changes Begun & Diesel Day Tank Vents Redesigned
ML19208C9896 July 1979Forwards Bechtel Deficiency Rept Re Component Qualification Test Documentation re-review
ML19208D71930 August 1979Forwards Response to IE Bulletin 79-14.Immediate Implementation of Program Deemed Premature & Would Provide No Useful Info in Evaluating Validity of Seismic Analysis. Will Conduct Analysis as Part of Turnover Procedure
ML19208D72930 August 1979Submits Response to IE Bulletin 79-15 Re Deep Draft Pump Deficiencies.Sys Is Being Constructed;Startup Testing, Operating & Maint History Will Be Kept W/Requested Onsite Package.Package Will Be Available After Oct 1979
ML19208D79329 August 1979Submits Addl Response to IE Bulletin 79-13.Required Examinations Completed on Feedwater Piping During Jul 1979 Turbine Outage of Unit 1.Supplemental Response Will Be Submitted within 30 Days of Examination of Unit 2
ML19209A0867 September 1979Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Two safety-related Pumps Tested Monthly
ML19209A65414 September 1979Responds to IE Bulletin 79-21, Temp Effects at Level Measurements. Outlines Liquid Level Measuring Sys Inside Containment Used to Initiate Safety Actions.Tables & Charts Encl
ML19209A6661 October 1979Submits Environ Event Rept 79-08 for Cooling Tower Operations During Sept.Covers Operation of Plant Circulating Water Sys in Partial Recycle Mode W/Daily Average Blowdown Flow Over 150 Cf.Daily Average for Month Was 269 Cf
ML19209A72121 September 1979Responds to IE Bulletin 79-19 Re Transport of Low Level Waste.Will Maintain Current Set of Regulations & Licenses on Burial Firms & Will Initiate Training Program Re Waste Solidification within Six Months
ML19209A73228 September 1979Forwards Secondary Water Chemistry Program Per LS Rubenstein 790801 Ltr.Program Will Be Referenced as Condition of OL
ML19209A75128 September 1979Forwards Amend 69 to OL as Revision 24 to FSAR
ML19209A91831 August 1979Submits Response to IE Bulletin 79-14.Item of Nonconformance Discovered Re Auxiliary Feedwater Sys (Ref LER 79-25).Visual & Analytical Insp of as-built Supports Will Be Completed within 120 Days
ML19209B0317 August 1979Forwards CPC 790801 Interim Rept 2 Re Questionable Impact Test Results on Status of Main Feed Pipe Spools
ML19209B08220 August 1979Forwards CPC 790810 Interim Repts Re Settlement of Diesel Generator Foundations & Bldg & Status of Discrepant Terminal Block Disconnect Links,Respectively.Copies Will Be Provided to ASLB & Parties Upon Request
ML19209B13128 August 1979Forwards CPC 790823 Final Rept Re Station Battery Qualification Test Failure
ML19209B2313 October 1979Forwards LER 79-026/01T-0
ML19209B42124 September 1979Submits Addl Info Re Reactor Vessel Weld Metal Info Specified in IE Bulletins 78-12,78-12A & 78-12B.Final Response to Bulletins Expected Nov 1979
ML19209B49021 September 1979Responds to IE Bulletin 79-18, Audibility Problems Encountered W/Evacuation of Personnel from High Noise Area. Several Speakers Will Be Added to Sys.Possibility of Adding Visual Annunciation in Selected Areas Is Being Investigated
ML19209B6203 October 1979Forwards Certificate of Svc Re Amend 69,Revision 24 to FSAR, to Application for CP & OL
ML19209C0535 October 1979Acr Receipt of NRC 790917 Ltr Re Potential for Adverse Environ Effects Ccausing Interaction Between nonsafety- Grade & safety-grade Sys.Review Has Not Identified Condition Which Would Jeopardize Safe Operations
ML19209C6819 October 1979Forwards LER 79-085/03L-0
ML19209C92415 October 1979Forwards Final Deficiency Rept Re Failure to Obtain Required Design Pressure at Outlet of Containment Air Coolers
ML19209D07916 October 1979Confirms Commitment Made to NRC at 791012 Meeting Re Submittal of License Amend Request within 30 Days to Adopt Primary & Secondary Coolant Activity Tech Specs.Forwards Interim Limit on Primary Coolant Iodine Activity
ML19210B69531 October 1979Responds to IE Bulletin 79-01.Instrumentation in Reactor Protection,Feedwater & Main Steam Sys Checked.Terminal Blocks,Solenoid Valves,Cables,Motors,Coatings,Gaskets & Fuse Holders Checked & Inspected to Maintain QACoatings
ML19210C0986 November 1979Forwards Certificate of Svc Re Amend 70 to Application for CPs & OLs (Revision 25 to FSAR)
ML19210C1236 November 1979Forwards 10 Photographs Taken During Util Insp of 791002 Steam Generator Tube Rupture.Photographs Show Location of Springs & Eroded & Ruptured Tubes.Addl Photographs on File at Plant
ML19210C4008 November 1979Forwards Monthly Operating Rept for Oct 1979
ML19210C69215 November 1979Forwards LER 79-028/03L-0
ML19210C78319 October 1979Forwards Util Final Deficiency Rept Re Svc Water Supply Pressure for Containment Recirculating Air Cooling UnitsUltimate heat sink
ML19210D51815 October 1979Forwards Interim Deficiency Rept Re Containment Bldg Prestressing Tendons
ML19210E26627 November 1979Confirms Implementation of Interim Procedural Solution Adopted at 791119 Meeting W/Nrc,Westinghouse & Util Re Possible Rod Drop Accident Analysis for Certain Westinghouse Designed Plants
ML19210E29230 November 1979Forwards Response to NRC 791025 Request Re Design Adequacy of B&W NSSS Utilizing once-through Steam Generators. Necessary Mods Do Not Require Const HaltPower change
ML19210E91610 December 1979Forwards Final Deficiency Rept Re Main Feed Pipe Spools
ML19211A49228 November 1979Responds to IE Bulletin 79-17,Revision 1.Insp Per Item 2 (B) to Begin 791203 for Unit 2 & End in Two Wks.Unit 1 Insp Scheduled for Aug 1980
ML19211A65817 December 1979Notifies NRC That Util Cannot Meet 781025 Schedule for Resolving Issue of Asymmetric LOCA Loads,Due to Delays in Matl Procurement.Pipe Restraints Will Be Installed During Refueling Outage
ML19211A68314 December 1979Notifies That Util Will Be in Compliance by 800131 W/Lessons Learned Task Force Recommendations Re Relief & Safety Valves Direct Position Indication & Inadequate Core Cooling Detection Instrumentation
ML19211C7318 January 1980Submits Addl Info Requested by NRC 791001 Ltr Re Loss of Offsite Power Events.Events Represent Periods When Less than Two Paths from Grid to Safeguard Buses,Were Available
ML19211C90511 January 1980Forwards Monthly Operating Rept for Dec 1979
ML19211D19918 December 1979Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Westhinghouse Bfd/Nbfd Relays Utilized or Planned for Use at Util
ML19211D25811 January 1980Forwards 791203-15 Inservice Insp Examination Summary Per IE Bulletin 79-17 & ASME Class 2 Examinations
ML19224C38425 June 1979Forwards for May 1979:Bechtel Nonconformance Repts & Rept Log,Quality Audit Findings,Quality Action Requests,Mgt Corrective Action Repts,B&W Repts of Nonconformity & Util Nonconformance,Audit & Action Repts
ML19224D70629 May 1979Notifies of Delay in Response to IE Bulletins 78-12,12A & 12B Due to Late Submittal by Vendor of Info Re Reactor Vessel Welds