Issue date | Title | Topic | |
---|---|---|---|
ML19207B971 | 31 August 1979 | Submits Interim Rept Re Nuclear Instrumentation & Reactor Protection Sys Grounding Concern.Procedures for B&W Test Spec 62-1005067-00 & Subsequent Testing Will Be Released for Use by 800104 | |
ML19207C457 | 7 September 1979 | Forwards Bechtel 790831 Rept Re Impact Testing of Main Feedwater Pipe.Addl Rept Will Be Provided by 791026 | |
ML19207C511 | 14 August 1979 | Forwards Supplemental Info in Response to IE Insp Repts 50-329/79-12 & 50-330/79-12 | |
ML19207C512 | 20 July 1979 | Responds to NRC 790619 Ltr Re Violations Noted in IE Insp Repts 50-329/79-12 & 50-330/79-12.Corrective Actions:Audit Conducted in May 1979 W/Five Findings Issued & Ref to Paragraph 58 in Welding Procedure M-B-QCP22 Corrected | Hydrostatic |
ML19208A406 | 30 July 1979 | Notifies That Recently Shipped Batteries Probably Will Not Meet Requirements of IEEE Stds 323-74 & 344-75 | |
ML19208A714 | 12 September 1979 | Forwards LER 79-025/01T-0 | |
ML19208A997 | 12 September 1979 | Forwards Monthly Operating Rept for Aug 1979 | |
ML19208B427 | 17 September 1979 | Forwards Inservice Insp/Examination Summaries:Special Feedwater Piping examination,790607-11 & Second Special Feedwater Piping examination,790711-31 | |
ML19208B574 | 1 August 1979 | Provides Supplemental Response to Deviations Noted in IE Insp Repts 50-324/79-17 & 50-325/79-17.Corrective Actions: Automatic Sprinkler Sys Repositioned,Fire Detector Changes Begun & Diesel Day Tank Vents Redesigned | |
ML19208C989 | 6 July 1979 | Forwards Bechtel Deficiency Rept Re Component Qualification Test Documentation re-review | |
ML19208D719 | 30 August 1979 | Forwards Response to IE Bulletin 79-14.Immediate Implementation of Program Deemed Premature & Would Provide No Useful Info in Evaluating Validity of Seismic Analysis. Will Conduct Analysis as Part of Turnover Procedure | |
ML19208D729 | 30 August 1979 | Submits Response to IE Bulletin 79-15 Re Deep Draft Pump Deficiencies.Sys Is Being Constructed;Startup Testing, Operating & Maint History Will Be Kept W/Requested Onsite Package.Package Will Be Available After Oct 1979 | |
ML19208D793 | 29 August 1979 | Submits Addl Response to IE Bulletin 79-13.Required Examinations Completed on Feedwater Piping During Jul 1979 Turbine Outage of Unit 1.Supplemental Response Will Be Submitted within 30 Days of Examination of Unit 2 | |
ML19209A086 | 7 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Two safety-related Pumps Tested Monthly | |
ML19209A654 | 14 September 1979 | Responds to IE Bulletin 79-21, Temp Effects at Level Measurements. Outlines Liquid Level Measuring Sys Inside Containment Used to Initiate Safety Actions.Tables & Charts Encl | |
ML19209A666 | 1 October 1979 | Submits Environ Event Rept 79-08 for Cooling Tower Operations During Sept.Covers Operation of Plant Circulating Water Sys in Partial Recycle Mode W/Daily Average Blowdown Flow Over 150 Cf.Daily Average for Month Was 269 Cf | |
ML19209A721 | 21 September 1979 | Responds to IE Bulletin 79-19 Re Transport of Low Level Waste.Will Maintain Current Set of Regulations & Licenses on Burial Firms & Will Initiate Training Program Re Waste Solidification within Six Months | |
ML19209A732 | 28 September 1979 | Forwards Secondary Water Chemistry Program Per LS Rubenstein 790801 Ltr.Program Will Be Referenced as Condition of OL | |
ML19209A751 | 28 September 1979 | Forwards Amend 69 to OL as Revision 24 to FSAR | |
ML19209A918 | 31 August 1979 | Submits Response to IE Bulletin 79-14.Item of Nonconformance Discovered Re Auxiliary Feedwater Sys (Ref LER 79-25).Visual & Analytical Insp of as-built Supports Will Be Completed within 120 Days | |
ML19209B031 | 7 August 1979 | Forwards CPC 790801 Interim Rept 2 Re Questionable Impact Test Results on Status of Main Feed Pipe Spools | |
ML19209B082 | 20 August 1979 | Forwards CPC 790810 Interim Repts Re Settlement of Diesel Generator Foundations & Bldg & Status of Discrepant Terminal Block Disconnect Links,Respectively.Copies Will Be Provided to ASLB & Parties Upon Request | |
ML19209B131 | 28 August 1979 | Forwards CPC 790823 Final Rept Re Station Battery Qualification Test Failure | |
ML19209B231 | 3 October 1979 | Forwards LER 79-026/01T-0 | |
ML19209B421 | 24 September 1979 | Submits Addl Info Re Reactor Vessel Weld Metal Info Specified in IE Bulletins 78-12,78-12A & 78-12B.Final Response to Bulletins Expected Nov 1979 | |
ML19209B490 | 21 September 1979 | Responds to IE Bulletin 79-18, Audibility Problems Encountered W/Evacuation of Personnel from High Noise Area. Several Speakers Will Be Added to Sys.Possibility of Adding Visual Annunciation in Selected Areas Is Being Investigated | |
ML19209B620 | 3 October 1979 | Forwards Certificate of Svc Re Amend 69,Revision 24 to FSAR, to Application for CP & OL | |
ML19209C053 | 5 October 1979 | Acr Receipt of NRC 790917 Ltr Re Potential for Adverse Environ Effects Ccausing Interaction Between nonsafety- Grade & safety-grade Sys.Review Has Not Identified Condition Which Would Jeopardize Safe Operations | |
ML19209C681 | 9 October 1979 | Forwards LER 79-085/03L-0 | |
ML19209C924 | 15 October 1979 | Forwards Final Deficiency Rept Re Failure to Obtain Required Design Pressure at Outlet of Containment Air Coolers | |
ML19209D079 | 16 October 1979 | Confirms Commitment Made to NRC at 791012 Meeting Re Submittal of License Amend Request within 30 Days to Adopt Primary & Secondary Coolant Activity Tech Specs.Forwards Interim Limit on Primary Coolant Iodine Activity | |
ML19210B695 | 31 October 1979 | Responds to IE Bulletin 79-01.Instrumentation in Reactor Protection,Feedwater & Main Steam Sys Checked.Terminal Blocks,Solenoid Valves,Cables,Motors,Coatings,Gaskets & Fuse Holders Checked & Inspected to Maintain QA | Coatings |
ML19210C098 | 6 November 1979 | Forwards Certificate of Svc Re Amend 70 to Application for CPs & OLs (Revision 25 to FSAR) | |
ML19210C123 | 6 November 1979 | Forwards 10 Photographs Taken During Util Insp of 791002 Steam Generator Tube Rupture.Photographs Show Location of Springs & Eroded & Ruptured Tubes.Addl Photographs on File at Plant | |
ML19210C400 | 8 November 1979 | Forwards Monthly Operating Rept for Oct 1979 | |
ML19210C692 | 15 November 1979 | Forwards LER 79-028/03L-0 | |
ML19210C783 | 19 October 1979 | Forwards Util Final Deficiency Rept Re Svc Water Supply Pressure for Containment Recirculating Air Cooling Units | Ultimate heat sink |
ML19210D518 | 15 October 1979 | Forwards Interim Deficiency Rept Re Containment Bldg Prestressing Tendons | |
ML19210E266 | 27 November 1979 | Confirms Implementation of Interim Procedural Solution Adopted at 791119 Meeting W/Nrc,Westinghouse & Util Re Possible Rod Drop Accident Analysis for Certain Westinghouse Designed Plants | |
ML19210E292 | 30 November 1979 | Forwards Response to NRC 791025 Request Re Design Adequacy of B&W NSSS Utilizing once-through Steam Generators. Necessary Mods Do Not Require Const Halt | Power change |
ML19210E916 | 10 December 1979 | Forwards Final Deficiency Rept Re Main Feed Pipe Spools | |
ML19211A492 | 28 November 1979 | Responds to IE Bulletin 79-17,Revision 1.Insp Per Item 2 (B) to Begin 791203 for Unit 2 & End in Two Wks.Unit 1 Insp Scheduled for Aug 1980 | |
ML19211A658 | 17 December 1979 | Notifies NRC That Util Cannot Meet 781025 Schedule for Resolving Issue of Asymmetric LOCA Loads,Due to Delays in Matl Procurement.Pipe Restraints Will Be Installed During Refueling Outage | |
ML19211A683 | 14 December 1979 | Notifies That Util Will Be in Compliance by 800131 W/Lessons Learned Task Force Recommendations Re Relief & Safety Valves Direct Position Indication & Inadequate Core Cooling Detection Instrumentation | |
ML19211C731 | 8 January 1980 | Submits Addl Info Requested by NRC 791001 Ltr Re Loss of Offsite Power Events.Events Represent Periods When Less than Two Paths from Grid to Safeguard Buses,Were Available | |
ML19211C905 | 11 January 1980 | Forwards Monthly Operating Rept for Dec 1979 | |
ML19211D199 | 18 December 1979 | Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Westhinghouse Bfd/Nbfd Relays Utilized or Planned for Use at Util | |
ML19211D258 | 11 January 1980 | Forwards 791203-15 Inservice Insp Examination Summary Per IE Bulletin 79-17 & ASME Class 2 Examinations | |
ML19224C384 | 25 June 1979 | Forwards for May 1979:Bechtel Nonconformance Repts & Rept Log,Quality Audit Findings,Quality Action Requests,Mgt Corrective Action Repts,B&W Repts of Nonconformity & Util Nonconformance,Audit & Action Repts | |
ML19224D706 | 29 May 1979 | Notifies of Delay in Response to IE Bulletins 78-12,12A & 12B Due to Late Submittal by Vendor of Info Re Reactor Vessel Welds |