ML19209A751

From kanterella
Jump to navigation Jump to search
Forwards Amend 69 to OL as Revision 24 to FSAR
ML19209A751
Person / Time
Site: Midland
Issue date: 09/28/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML19209A752 List:
References
7648, HOWE-262-79, NUDOCS 7910050331
Download: ML19209A751 (1)


Text

.

9 Stephen H. Howell Senior Vice PressJent General Offices: 1945 West Parnah Road, Jackson, Michigan 49201 * (517) 788-0453 Septe=ber 28, 1979 have 262-79 Director of Nuclear Reactor Regulation Attn: Mr Docenic Vassallo, Acting Director Division of Project Management US Nuclear Regulatory Cennissica Washington, DC 20555 MIDLAND PROJECT DOCKET N0 50-329, 50-330 ns:D: cit 69 FILt;:

0485.11 UFI: 71*01*11 SERIAL:

7648 Enclosed herewith is Anend=cnt 69 to the Ccepany's application for ccnstruction permits and operating licenses, containing three (3) signed originals and sixtf (60) copies of Revision 2h to the Final Safety Analysis Report.

Revision 2h of the F3AR centains updated ?3AR raterial as detailed in the application page.

In addition, there are enclosed revised material to the following supplemental information furnished pursuant to ReCulatory Guide 1.70, Revision 2:

1.

Supplemental Reference Drawings (Piping and Instrument Diagrams) - Five (5) copies Proof of service upon the parties listed in the revised Service List attached to Pr S A Var 6a's November 30, 1977 letter as codified by Mr S A Varga's letter of April 24, 1975 is being provided under separate cover.

l W"Y n

SFJi/jm

'}I)b II9 A [v y

7 910 0 5 0 N ~

eb D

w 3

i[@CQ s

k h f; CORSumBIS e

POW 8f

\\ 7 g

/f,#1 Om p %'

Sa"*" " " " * '

Senior Vsce l>esident General of fices: 1945 West Parnall Road, Jackson, Michigan 49201 * (517) 788-0453 September 28, 1979 have 262-79 Director of !iuclear Reactor Regulation Attu: fir Domenic Vassallo, Acting Director Division of Project Management LU Iluelear Regu]atory Commission Washington, DC 20555 MIDL/d1D PROJECT InCKET 140 50-329, 50-330

/JsiD:G:iT 09 FILE:

0465.11 UFI: 71*0l*11 SERIAL:

7 048 Enclosed herewith is Amendment 69 to the Company's application for constructica permits and operating licences, containing three (3) signed originals and nixty (60) ccpics of Revision 2! 4 to the Final Garety Analysis Reizort.

Ecvision 2h of the PJAR contains updated PJ/dl material as detailed in the application page.

In addition, there are enclosed reviscd material to the following supplementt.1 infornution furnished pursuan. to Regulatory Guide 1.70, Revision 2:

1.

Supplemental Reference Drawings (Piping and Instru:aent Diagrams) - Five (5) copies Proof of service upon the parties listed in the revised Serv.ce List attached to lir G A Varga's Ilovember 30, 1977 letter as modified by Mr S A Varga's letter of April 24, 1976 is being provided under separate cover.

~

-2

- x, m

,-'h

> L~-

0 D h A n.u--< C {

(

SHH/jm 1 l !)t, 120

CO:iSUMERS POWER COMPA!!Y APPLICATI0:i IVR REACTOR CO:ISTRUCTIO:1 PERMIT /JiD OPERATIi!G LICENSE DOCKET NO 50-329 DOCTl:T NO 50-330

/dE;IID;EIT NO 69

}:nclosed herewith, revising and supplementing the above-entitled appli. tion, are revised pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977 The enclosed material consists of the following:

1) Revisions to various PJAR Sections and Staff Requests for Additional Information in response to certain Open Items associated with Staff review of the Midland Plant
2) Additional information the IT3AR stated would be submitted at this time
3) Changes in various FSAR Sections resulting from routine design developments h) Correction of minor errors and emissions 5)

Chr.ng,ea relating to the above (Tcbles of Contents, Figures, Tables, etc)

These new and revised pages bear the notation " Revision 24 9/79," and are marked in the margin to indicate where changes have been made.

Additional pages and fir.ures have been added as reflected on the revised Midland Plant FSAR " List of Effective Pages."

Consumers Power Compary Dated: September 28, 1979

.by

~Eub Stephen QIiovell, Senior Vice President Svorn and subscribed to before me on this 28th day of September,1979 y

/,,

llevElly A. Amy Notary Public, Jackson County, Michigan My commission expires March 14, 1981 1106 121

DISTRIBUTION AND ACKNOWLEDGEMENT FORM Bechtel Associates Professional Corporation TO

/WC RETURN TO:

BECHTEL ASSOCIATES HOLDER OF FSAR SET NL*MBER

///

PROFESSIONAL CORPORATION P.O. BOX 1000 REVISION NUMBER 24 ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT Attention:

Lorna Stanley Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR.

Revisions should be incorporated in the FSAR by following the collating in-structions attached to the revision.

If any revision material is missing, please indicate in the space provided below.

The holder of the FSAR is held responsible for the upkeep of their volumes.

In order to verify receipt of the enclosed information, please sign the ac-knowledgement below and return the entire form within 30 days to me at the above location.

If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).

Set Number (s)

Name of Party (ies)

Address (es)

The following material was missing from the revision (s):

REV. NO.

PAGE NO.

TABLE NO.

FIGURE NO.

TAB I hereby certify that I have received the material, except as noted.

Signature of Set Holder Date 1106 122

.