Issue date | Title | Topic | |
---|---|---|---|
ML20234A932 | 4 October 1971 | Forwards Vv Mackenzie to Author Re Oct 1964 Rept Entitled, Seismic Effects on Bodega Bay Reactor Concerning Subsequently Withdrawn Application of Util to Build Nuclear Steam Generating Plant at Bodega Head,Ca | |
ML20234A937 | 6 May 1964 | Provides Info Re Influence of Seismic Considerations on Reactor Costs & Availability of Seismic Resistance in Reactors Not Designed to Withstand Seismic Forces | |
ML20234B165 | 6 September 1963 | Informs of Plans to Attend 630917 Conference of Consultants in Bethesda,Md Re Bodega Head Power Plant | |
ML20234B168 | 17 March 1964 | Requests Response to Listed Questions Re Bodega Bay Unit 1, Including Info on Reactor Safety Control Sys,Design of Underground Structures Traversing Fault Lines to Resist Ground Movement & Estimates & Benefits to Public | Earthquake |
ML20234B442 | 3 June 1964 | Forwards Revised Draft of Questions Resulting from ACRS Meeting of May 8, Per 640515 Meeting on Bodega Reactor | Earthquake |
ML20234B519 | 8 August 1963 | Forwards Illustrations for Figures 1 & 7 for Insertion in Seismological Analysis of Bodega Head,Ca, Mailed on 630720 | |
ML20234B621 | 12 May 1987 | Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness | |
ML20234B657 | 8 May 1987 | FOIA Request for Placement,In Pdr,Region Input to NRC Headquarters,Nrr Re Status of Listed Plants in Terms of Plant Readiness for OL IE Manual,Chapter 94300 | |
ML20234C562 | 27 August 1963 | Ack Receipt of Re Possible Future Schedules | |
ML20234C804 | 20 July 1963 | Forwards Revised Version of Seismological Rept on Proposed Bodega Head Nuclear Power Plant.Rept Includes Mods Made in Chicago on First Six or Seven Pages of Text,Complete Rev of Last Half of Rept & New Illustrations | Earthquake |
ML20234C865 | 23 July 1963 | Submits List of Errors Observed in Matl Submitted by .Ltr Protesting Const PG&E Nuclear Power Plant Encl | |
ML20234D097 | 11 October 1963 | Forwards Comments on Jp Eaton Rept Entitled Geologic & Seismologic Investigations of Proposed Nuclear Power Plant on Bodega Head,Sonoma County,Ca, for Seismological Phase | Earthquake |
ML20234D129 | 19 August 1963 | Requests to Be Informed If Proposed Hearing on Bodega Head Power Plant Proposal Might Be Delayed to Point Where Hearing Will Overlap W/Author 630920 Trial Appearance Date | |
ML20234D251 | 26 July 1963 | Forwards Two Memos Commenting on Housner Processed Memo Distributed at Argonne Labs on 630802 & Statements Made in Course of Talks.Related Info Encl | |
ML20234D855 | 16 July 1963 | Forwards Matl Re Bodega Bay Atomic Park Unit 1 Re Questions Raised in Meetings at Bethesda,Md & Argonne on 630702, Including Cost of Seismic Protection,Conclusions for Final Rept,Comments on Spectra & Working Stresses as Design Basis | Earthquake Weak link |
ML20234D956 | 11 October 1963 | Forwards Comments on Seismolgical Aspects of St Amand Rept Geological & Seismologic Study of Bodega Head | Earthquake |
ML20234E073 | 26 June 1963 | Forwards Draft Comments on Bodega Bay Reactor.Informs of Schedule for Trip to Washington,Dc | |
ML20234E211 | 23 November 1964 | Requests Clarification of Point in AEC 641026 Rept Entitled, Summary Analysis by Div of Reactor Licensing in Matter of Bodega Head Nuclear Power Plant, That Site Not Suitable Because Plant Boiling Water Plant | Earthquake |
ML20234E419 | 21 April 1964 | Forwards Addl Comments on Util Amend 7 for Use in Obtaining Holmes & Narver,Inc & Newmark Repts on Tunnel Liners. Marked-up News Article by D Pearson Re Alaska Quake & Bodega Also Encl | Safe Shutdown Earthquake |
ML20234E928 | 23 November 1964 | Ack Receipt of & Newmark Rept on Bodega Project. PG&E Amends 8 & 9 & RA Williamson Rept Requested | |
ML20234E939 | 25 November 1964 | Requests Rept Seismicity & Tsunami Rept,Bodega Head,Ca, Issued by Us Coast & Geodetic Survey.Clips from Santa Rosa Press Democrat Encl | |
ML20234F030 | 18 December 1964 | Ack Receipt of Re Structure of Regulatory Staff of Aec.Expresses Appreciation to Have Better Understanding of AEC Composition | |
ML20234F457 | 29 May 1963 | Forwards Preliminary Draft Re Structural Considerations in Connection W/Proposed Bodega Bay Reactor,Per 630528 Telcon W/Hadlock | Earthquake Weak link |
ML20235A125 | 16 December 1987 | Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs | |
ML20235A720 | 17 June 1963 | Forwards 630614 Revised Preliminary Draft Rept Re Structural Considerations Pertaining to Proposed Bodega Bay Reactor. Revs Stem from Subsequent Review of Original Draft, Investigation of Reactor Features & 630612 Meeting | Earthquake Weak link |
ML20235B256 | 9 October 1964 | Discusses & Recommends Methods of Design & Const for Bldg Massive Structures Such as High Dam on Bedrock.Designs Encl | Earthquake |
ML20235B410 | 19 October 1964 | Discusses Svcs Performed Re Bodega Bay & Malibu Reactors,Per Covering Work Under Contract AT(49-5)2667.Study to Outline Definitive Way Earthquake Resistant Design Provisions for Reactors at Locations Suggested | Earthquake |
ML20235B612 | 7 February 1964 | Ack Receipt of Forwarding Amend 5 Filed by Pg&E. Forwards Comments Re Seismology Items,Delayed Due to Local Activities.Confirms Presence at Conference in Washington | Earthquake |
ML20235B623 | 29 June 1970 | Requests Listed Addl Info Re PSAR for Plant,Including Description of Structure Supported,Dimensions of Foundation Element,Including Length of Pile or Caissons & Depth Driven or Drilled | Safe Shutdown Operating Basis Earthquake Design basis earthquake Earthquake |
ML20235B670 | 24 October 1969 | Requests That Encl Proprietary SWND-2, Loctvs,Computer Code to Determine Pressure & Temp Response of Pressure Suppression Containments to LOCA, Be Withheld (Ref 10CFR9.5) | |
ML20235B679 | 4 May 1971 | Forwards Draft Adequacy of Structural Criteria for Wh Zimmer Power Station. Rept Calls Attention to Matters Which Must Be Clarified Before Finalizing Rept | |
ML20235C118 | 13 January 1969 | Advises That Review of SAR Completed.No Further Questions Re Status of Plant Foundations Raised.Questions Re Seismology & Reactor Primary Vessel Supports Included for Clarification | Safe Shutdown Earthquake |
ML20235C175 | 11 November 1963 | Submits List of Changes Made in Text of Rept Submitted to Lowenstein & Set of Illustrations | Earthquake |
ML20235C939 | 30 November 1966 | Forwards Draft Adequacy of Structural Criteria for Quad Cities Station Units 1 & 2. Rept Discusses Ability of Plant Reactor to Resist Seismic Motions | |
ML20235D020 | 26 September 1968 | Comments on Vols 1,2,3 & 4 of Facility Psar.Info in PSAR Insufficient in Certain Instances to Enable Author to Assess Adequacy of Util Analysis of Earthquake Design Levels | Earthquake |
ML20235D079 | 7 September 1971 | Forwards Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station, Final Rept | |
ML20235D531 | 22 August 1963 | Expresses Opposition to Allowing PG&E to Proceed W/Atomic Plant at Bodega Bay & Requests AEC Halt Project.Claims That Many in Opposition to Reactor Say Nothing Due to Fear of Losing Util Buisiness | |
ML20235D563 | 28 October 1963 | Informs That Ack of Receipt of to AEC Not Received.Notes Unusual Reaction from President of Util & Wonders If Util Has Employees in Key Branches of Govt | |
ML20235D612 | 24 October 1963 | Requests USGS Rept Submitted to AEC Re Bodega Head Atomic Power Plant in CA | |
ML20235E451 | 16 July 1971 | Forwards Suppl to 710504 Draft Rept & Requests Listed Addl Info Re Plant.Suppl Presents More Detailed Assessment of Factors Relating to Evaluation of Adequacy of Foundations | |
ML20235E521 | 12 August 1971 | Forwards Revised Draft Adequacy of Structural Criteria for Plant. Two Topics Found in Rept Which Need follow-on Attention | |
ML20235E579 | 12 August 1971 | Confirms That Questions Described in 710716 Special Rept Have Been Resolved Satisfactorily & Resolution of Problems Described in Detail in Final Rept on Facility | |
ML20235E623 | 24 August 1971 | Forwards Revised Draft, Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station | |
ML20235E669 | 7 September 1971 | Forwards Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station, Final Rept | |
ML20235K873 | 9 July 1987 | Informs That Tayloe Assoc Cannot Produce Mag or nine-track Tapes of Hearing Transcripts Until NRC Finalizes Arrangements W/Others to Provide Lexis Format,Including Library & File Numbers & Segmentation Info | |
ML20235L708 | 15 May 1983 | Forwards New 830322 Indian Point Transcript Due to Blank Pages in Original NRC Copy.Blank Pages Caused by Malfunction of Baron Computer Printer | |
ML20235V132 | 28 August 1987 | Forwards EGG-NTA-7471, Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28.... Based on Licensee Responses,Plants Reviewed Conform W/Exceptions Listed in Section 14 | |
ML20236C056 | 21 August 1967 | Discusses Meeting W/Westinghouse on 670818 Re Problems Related to Reactor Internals Under Combined Earthquake & Blowdown Loadings.Westinghouse May Choose to Present More Evidence on Listed Points | Safe Shutdown Earthquake |
ML20236S429 | 20 October 1987 | FOIA Request for Listed Documents,Including Encls from NRC Requesting Addl Info on Gpu Topical Repts TR-033 & TR-040 & Encl to NRC Meeting Summary Re SPDS | |
ML20236U522 | 19 October 1987 | FOIA Request for LERs for Listed Plants,Including All Attachments & Encls from Original Documents |