Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000305/20060022 May 2006IR 05000305-06-002; 01/01/2006 - 03/31/2006; Kewaunee Power Station. Adverse Weather Protection, Operability Evaluations, Permanent Plant Modifications, Problem Identification and ResolutionSafe Shutdown
Boric Acid
High winds
Offsite Dose Calculation Manual
Tornado Missile
Internal Flooding
Past operability
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Fire Protection Program
Scaffolding
Downpower
IR 05000305/200600920 June 2006IR 05000305-06-009, (Drs), 05/15/2006 - 05/19/2006, Kewaunee Nuclear Power Plant, Routine Security Baseline Inspection OUO Cvr Ltr
IR 05000305/200601014 June 2006IR 05000305-06-010; Dominion Energy Kewaunee Inc; on 04/27/06 - 05/10/06; Kewaunee Power Station; Special Inspection for Unplanned Manual Trip of the ReactorSignificance Determination Process
Operability Determination
Through-Wall Leak
ML0607400963 April 2006Emergency Action Levels Based on Revision 4 to NEI 99-01, Methodology for Development of Emergency Action Levels
ML0608904043 April 2006Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC7897 Through MC7969)
ML0609401533 April 2006Notification of NRC Supplemental Inspection for White and Yellow Findings and Request for InformationCondition Adverse to Quality
ML0609500943 April 2006North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite PowerSafe Shutdown
High winds
Probabilistic Risk Assessment
Reserve Station Service Transformer
Contingency analyzer
Earthquake
Maintenance Rule Program
ML0609502338 May 2006Request for Additional Information Related to Extension of Surveillance Interval
ML06100003820 April 2006Clarification Concerning Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (Revised Relief Request VRR-05) for Fourth 10-year Pump and Valve Inservice Testing Program
ML0610101516 April 2006License Amendment Request 214-Request for Review and Approval of Methodology Change Regarding Tornado MissilesTornado Missile
Probabilistic Risk Assessment
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Design basis earthquake
TORMIS
Earthquake
ML06109062218 May 2006Relief, Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Third Inservice Inspection Interval, Limited Volumetric and Surface Examination Coverage for Inservice Inspection Program WeldsVT-2
Incorporated by reference
ML06118014628 April 2006Unit No'S. 1 & 2; Surry Unit No'S. 1 & 2; Kewaunee; Millstone, Unit No'S. 2 & 3 - Request for Additional DOM-NAF-3 (TAC No'S. MC8833, MC8834, MC8835, MC8836, MC8831, & MC8832)
ML06118034928 April 2006PNO-III-06-012: Kewaunee, Manual Reactor Shutdown Following Feedwater Pump Trip
ML06122035727 April 2006Letter 04/27/2006 Kewaunee Confirmation of Initial Operator License Re-take Examination: Kewaunee Nuclear Station
ML0612301075 May 2006Region III Comments on Draft Response to Task Interface Agreement 2005-10 Relating to Impact of Flooding on Residual Heat Removal (RHR) Pumps at Kewaunee Power StationSafe Shutdown
Internal Flooding
ML06124012728 April 2006Annual Environmental Monitoring Report January - December 2005Grab sample
ML06124013828 April 2006Transmittal of Kewaunee Radioactive Effluent Release Report January - December 2005Annual Radioactive Effluent Release Report
ML0612806515 May 2006Response to NRC Request for Additional Information Regarding License Amendment Request - 219 One-Time Extension of Surveillance Requirements
ML06131021011 May 2006Site Management Changes
ML06136019016 May 2006Correspondence Distribution Request
ML06142017120 June 2006Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Third ISI Interval, Limited Volumetric and Surface Examination Coverage for ISI Program WeldsVT-2
Incorporated by reference
Dissimilar Metal Weld
ML06142032816 May 200606 Kewaunee Requalification Program Inspection
ML0614300926 June 2006Correction to Granted Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Third Inservice Inspection Interval, Limited Volumetric and Surface Examination Coverage.VT-2
Incorporated by reference
ML06151060123 May 2006EPRI HRA Users Group Review of Draft NUREG-1842
ML06151060330 May 2006Public Meeting Letter to Licensee to Discuss Improvement Initiatives
ML06152004430 May 2006Notice of Open Meeting with Kewaunee Power Station, to Discuss the Progress in Implementation of Station-wide Improvement Initiatives
ML0615601442 June 2006Response to NRC Request for Additional Information Re License Amendment Request 218: Application for Technical Specification Improvement Regarding Steam Generator Tube IntegrityShutdown Margin
High Radiation Area
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Nondestructive Examination
Process Control Program
Pressure Boundary Leakage
ML0615704536 June 2006Response to NRC Request for Additional Information Regarding License Amendment Request - 219 One-time Extension of Surveillance Requirements
ML0615905058 June 2006Millstone, Units 2 and 3, North Anna, Units 1 and 2, and Surry, Units 1 and 2, Response to Generic Letter 2006-03: Potentially Nonconforming Hemyc and MT Fire Barrier ConfigurationsSafe Shutdown
Fire Barrier
Hemyc
Exemption Request
Fire Protection Program
ML06166043720 June 2006Technical Report (TAC MC7897) on Third 10-Year Inservice Inspection Interval Request for Relief for Nuclear Management Company, LLCNondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML06180030728 June 2006License Amendment Request - 226 Subject: Increase in Technical Specification Minimum Required Refueling Water Storage Tank Boron ConcentrationBoric Acid
Shutdown Margin
ML06181004328 June 2006Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46Loop seal
ML06184058722 June 2006Public Meeting Kewaunee - Dominion Presentation Slides - to Discuss Improvement Initiatives
ML06186069230 June 2006Ltr 06-30-06 Region III Engineering Topics Meeting
ML0620703148 June 2006Response to Request for Additional Information, Request for Approval of Topical Report DOM-NAF-3, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment
ML0627101925 June 2006Response to Furnish Written Examinations, Operating Tests & Supporting Reference Materials
PNO-III-06-012, A: Kewaunee: Manual Reactor Shutdown Following Feedwater Pump Trip (Update)17 May 2006PNO-III-06-012A: Kewaunee: Manual Reactor Shutdown Following Feedwater Pump Trip (Update)
PNO-III-06-014, Kewaunee, Procedure Adherence Problems During Reactor Startup23 May 2006PNO-III-06-014, Kewaunee, Procedure Adherence Problems During Reactor Startup
Press Release-III-06-020, Nuclear Regulatory Commission Begins Special Inspection at Kewaunee Nuclear Plant Following Shutdown27 April 2006Press Release-III-06-020: Nuclear Regulatory Commission Begins Special Inspection at Kewaunee Nuclear Plant Following Shutdown
Press Release-III-06-024, NRC Begins Special Inspection at Kewaunee Nuclear Plant19 May 2006Press Release-III-06-024: NRC Begins Special Inspection at Kewaunee Nuclear Plant
TAC:MC78973 April 2006
TAC:MC789820 June 2006
TAC:MC792118 May 2006
TAC:MC79693 April 2006
TAC:MC88163 April 2006
TAC:MC883128 April 2006
TAC:MC89375 May 2006
TAC:MC97828 May 2006
TAC:MD245628 June 2006